Project Date: | 07/03/2024 | Date Due: | 07/23/2024 | Company: | Town of Dale | Bid Notice: | Notice to Bidders.pdf | Awarded To: | Sam Estes Painting Inc. |
Project Description:
Wastewater System Improvements Div. II – Repainting of the Wastewater Treatment Plant East Clarifier and Misc. Equipment
Division II of the Project consists of:
-
Repainting of the Wastewater Treatment Plant East Clarifier and Misc. Equipment
Project Description:
Wastewater Improvements Project- Lift Station #19 Rehabilitation & Sanitary Sewer Lining
The Project will be constructed in one (1) contract which is defined and outlined as follows:
The contract will consist of Sanitary Sewer Lining, Manhole Rehabilitation and Lift Station Improvements. Lift station improvements to include but not be limited to pumps, controls, and valving.
Project Description:
The project consists of:
A new restroom facility to be located at the Dale Town Park adjacent to the existing splashpad. The restroom consists of two-unisex restrooms and two-family restrooms and a small storage/mechanical room. The project also includes concrete sidewalk and utility work associated with the building.
Project Date: | 09/04/2024 | Date Due: | 10/02/2024 | Company: | Eastern Bartholomew Water Corporation | Bid Notice: | Notice to Bidders.pdf |
Project Description:
Water Distribution System Improvements Low Zone Service Area Reinforcement – Northern Gateway Project
The project consists of:
-
Installation of approximately 8,500 L.F. of 16” D.I. Class 250 Water Main and Appurtenances by Open-Cut Placement.
-
Installation of approximately 120 L.F. of 16” R.J. D.I. Class 250 Water Main and Appurtenances by Uncased Bore.
-
Installation of approximately 140 L.F. of 8” D.I. Class 350 Water Main and Appurtenances by Open-Cut Placement.
-
Installation of approximately 190 L.F. of 6” D.I. Class 350 Water Main and Appurtenances by Open-Cut Placement.
-
Installation of approximately 210 L.F. of 30”x 0.500” Welded Steel Casing by Auger Boring or Pipe Jacking with 16” D.I. Carrier Pipe and Appurtenances.
-
Dry Tap Connections to Existing 12”, 10”, and 8” Water Mains
-
Installation of 18’-0” x 8’-0” I.D. Pre-Cast or Cast-in-Place Concrete Meter Pit and Appurtenances.
Project Description:
Polk Drive Extension Road, Water and Sanitary Sewer Improvements
The project consists of additions to the existing Polk Drive including but not limited to:
-
New Stone Base with HMA Base and Surface Courses.
-
New Water Main and Associated Appurtenances.
-
New Sanitary Service Line and Associated Appurtenances.
Project Description:
Wastewater System Improvements New Hope Lift Station and Force Main and North Drive Lift Station Force Main Replacement
The project consists of:
-
New Hope Lift Station.
-
New Hope Lift Station 4” Force Main.
-
North Drive Lift Station 6” Force Main Replacement.
Project Description:
Sanitary Sewer System Improvements Project Crawfordsville High School Lift Station and Force Main Improvements
The project consists of:
-
Installation of approximately 49 L.F. of 8” SDR-35 PVC Sanitary Sewer; 21 L.F. of 10” SDR-35 PVC Sanitary Sewer; 127 L.F. of 18” F-679 PVC Sanitary Sewer.
-
Installation of approximately 846 L.F. of 12” DR-11 HDPE Sanitary Force Main.
-
Installation of approximately 70 L.F. of 30” Welded Steel Casing by Jack and Bore with 18” F-679 PVC Sanitary Sewer Carrier Pipe and Appurtenances.
-
Installation of approximately 86 L.F. of 30” Welded Steel Casing by Jack and Bore with 12” DR-11 HDPE Sanitary Force Main Carrier Pipe and Appurtenances.
-
Installation of Two Pre-cast Sanitary Sewer Manholes
-
Modification of Existing Sanitary Manholes
-
Installation of Proposed Sanitary Lift Station consisting of 10’ Diameter Wet Well, Valve Vault, Metering Pit, Submersible Pumps, Controls, Back-up Power Generator, Valves, Asphalt Access Drive and Appurtenances.
-
Demolition of Existing Pump Station and Appurtenances.
|