Welcome to the MEI Plan Room

If there is any problem with this site, please contact Matt Clarke by email or by telephone at 812-295-2800.

Job Name:
Job Desc:
MEI Project No.: 2024012-14, 2024-2 CCMG Street and Stormwater Improvements

The project consists of the following:

            Street Improvements and Stormwater Improvements.

  1. Ninth Street: From Gough Street to Poplar Street

Approx. 3,800 SY of Milling and Resurfacing along with Curb Ramp and Inlet Replacement

  1. Fourth Street: From Locust Street/SR 62 to Main Street/SR 62

Approx. 840 SY of Milling and Resurfacing

  1. Fourth Street: From Centennial Street to E. Short Street

Approx. 3,441 SY of Milling and Resurfacing along with Curb Ramp and Inlet Replacement, and Linear Ditch Grading

  1. North Street: From Third Street to Fourth Street

Approx. 3,328 SY Milling and Resurfacing

  1. Fourth Street: From Walnut Street to Locust Street/SR 62

Approx. 1,060 SY of Milling and Resurfacing along with Sidewalk, Curb Ramp and Retaining Wall Replacement

  1. Hammond Street: From Third Street to Yankeetown Road

Approx. 1,510 SY of Milling and Resurfacing

  1. Pine Street: From Locust Street/SR 62 to Elm Street

Approx. 1,500 SY of Milling and Resurfacing

  1. Pine Street: From Main Street/SR 62 to Sycamore Street

Approx. 1,010 SY of Milling and Resurfacing along with Curb Ramp, Inlet, and Storm Sewer Replacement

  1. Kiper Avenue: From S. Forrest Avenue to N. Ninth Street

Approx. 2,300 SY of Milling and Resurfacing

  1. Parkview Drive: From Eighth Street to Tower Drive

Approx. 4,650 SY of Milling and Resurfacing

  1. Old Rockport Road: From SR 62 to City Limits

Approx 6,220 SY of Milling and Resurfacing

  1. American Way: From SR 62 to Terminus

Approx. 5,650 SY of Surface Scarify and HMA Overlay over PCCP along with Full-Depth Patching and Crack Seal

  1. Warrick Drive: From Office Park Drive to Terminus

Approx. 10,000 SY of Surface Scarify and HMA Overlay over PCCP along with Full-Depth Patching and Crack Seal

  1. Office Park Drive: From Warrick Drive to Business Park Drive

Approx. 2,995 SY of Surface Scarify and HMA Overlay over PCCP along with Full-Depth Patching and Crack Seal

  1. Business Park Drive: From Eskew Road to Terminus

Approx. 1,988 SY of Surface Scarify and HMA Overlay over PCCP along with Full-Depth Patching and Crack Seal

  1. Benjamin Court: From Quail Crossing Drive to Terminus

Approx. 2,425 SY of Subgrade Treatment Type II, HMA Intermediate and HMA Surface Placement along with Stone Shoulders

  1. Cypress Street: From Cherry Street to Locust Street/SR 62

Approx. 1,985 SY of Milling and Resurfacing

  1. Cypress Street: From Locust Street/SR 62 to Main Street/SR 62

Approx. 770 SY of Milling and Resurfacing

  1. First Avenue: From Walnut Street to Cherry Street

Approx. 1,803 SY of Milling and Resurfacing along with Curb Ramp and Inlet Replacement

  1. Walnut Street: From Cypress Street to Pine Street

Approx. 920 SY of Milling and Resurfacing

  1. Brimm Street: From Parklane Avenue to Terminus

Approx. 735 SY of Milling and Resurfacing along with Full Depth Patching

  1. First Street: From Washington Street to Monroe Street

Approx. 5,220 SY of Milling and Resurfacing along with Curb Ramp and Inlet Replacement

  1. Autumn Drive Approx. 145’ North of Autumn Dr./Convey Dr. Intersection

Stormwater Infrastructure Improvements and Full-Depth Patching

  1. Eighth Street: From Gough Avenue to Taylor Street

Approx. 1,085 SY of Milling and Resurfacing along with Curb Ramp and Stormwater Infrastructure and Full Depth Patching

 

 
 
Contact: Clint W. Roos, P.E. Created: Jan 22, 2025
Company: City of Boonville Bid Due: Feb 18, 2025
File nameFile Size
Previews for this bidset are not currently available.
Notice to Bidders.pdf197 KB
Addendum 1_Boonville 2024-2 CCMG.pdf351 KB
Specs.pdf31 MB

Follow Midwestern Engineers on Twitter

Plan Holders List
City of Boonville
MEI Project No.: 2024012-14, 2024-2 CCMG Street and Stormwater Improvements

Sealed Bids are invited and may be delivered or forwarded by certified mail, addressed to the City of Boonville located at 135 South 2nd Street, P.O. Box 585, Boonville, IN, 47601 until 3:00 P.M.  Local Time (Central Time) on February 18, 2025.  If bids are forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed to the Owner at 135 South 2nd Street, P.O. Box 585, Boonville, IN, 47601.  Bids received after such hour will be returned unopened and not considered. Bids received prior to this time shall be opened and publicly read at the Board of Works public meeting scheduled to take place on February 18, 2025 @ 3:00 P.M.  Local Time (Central Time) at the City of Boonville located at 135 South 2nd Street, Boonville, IN, 47601.  Each bid must be enclosed in a sealed envelope bearing the title of the Project and the name and address of Bidder. 

 

S.A.M.M TRUCKING AND EXCAVATING, INC.
5575 SCHNEIDER ROAD
NEWBURGH, IN 47630
Phone: 8122020348
Fax:
J. H. Rudolph & Co., Inc.
4590 E. Cr 2150 N.
Dale, IN 47523
Phone: 812.473.8593 ext. 4000
Fax: 812.937.9712
Koberstein Contracting, Inc.
12600 Warrick County Line Road
Evansville, IN 47725
Phone: 812.214.7369
Fax:
River Town Construction, LLC
5266 Vann Road
Newburgh, IN 47629
Phone: 812.853.9558
Fax:
E&B Paving
10900 Telephone Rd.
Chandler, IN 47610
Phone: 8124751363
Fax:
Metzger Construction Co., Inc.
655 N Center Rd
Boonville, IN 47601
Phone: 8129257544
Fax: