Midwestern Engineers, Inc. Plan Preview

WET WEATHER FILTER BUILDING SCADA SYSTEM NOTES 1. T HE CON T RACTOR SHALL UT I LIZE THE OWNERS EXIST I NG SCADA SYS T EM I NTEGRATOR BY CON T AC T ING NA T HEN BURKHART OF TORIC ENGINEERING AT 317-718-1800 FOR SCOPE AND ANY QUESTIONS PR I OR TO B I D. THE PROPOSED SCADA CONTROL PANEL SHALL INCLUDE, BUT NOT LIMITED TO, THE FOLLOWING: A. ALLEN BRADLEY COMPACTLOG I X PLC W/ EXPANS I ON 1/0. OR EQUAL B. CONTROL RELAYS, AS NEEDED C. CONVENIENCE RECEPTACLE, 15-AMP D. DIGI T AL DISPLAY E. ENCLOSURE, WALL-MOUNT, TYPE 12, PAINTED STEEL F. F I BER OP T IC PA T CH PANEL G. I NTRINSICALLY SAFE BARRIER, ANALOG, 1-CHANNEL H. I NTRINSICALLY SAFE BARRIER, DIG IT AL, 2-CHANNEL, QUANTITY OF THREE (3) I. MAIN CIRCUIT BREAKER J. MAPLE SYSTEMS TOUCHSCREEN, 15' K. NETWORK SWITCH, MANAGED, 14-ETHERNET PORTS, 2-F I BER PORTS L. POWER SUPPLY, 24VDC M. PUSHBUTION, 30MM N. TERM I NAL BLOCKS, AS NEEDED 0. TVSS, 120VAC P. UPS BATIERY BACKUP Q. UL 508A LISTING 2. INPUTS/OU T PUTS DIGITAL INPU T S: AUTOMAT I C TRANSFER SWITCH POSI TI ON (NORMAL/BACKUP) AUTOMATIC TRANSFER SWI T CH NORMAL SOURCE AVA I LABLE AUTOMA TI C TRANSFER SWITCH S I TE POWER FAIL WET WEATHER PUMP 1 SEAL FAIL WET WEATHER PUMP 1 HIGH TEMP WET WEA T HER PUMP 2 SEAL FA I L WET WEATHER PUMP 2 HIGH TEMP WET WEA T HER PUMP 3 SEAL FAIL WET WEATHER PUMP 3 HIGH T EMP PROCESS PUMP 1 HIGH T EMP PROCESS PUMP 1 SEAL FAIL PROCESS PUMP 2 HIGH TEMP PROCESS PUMP 2 SEAL FAIL FLOA T - OFF FLOAT -- LEAD ON FLOAT -- LAG ON FLOAT - LAG LAG ON FLOA T -- HIGH LEVEL PROCESS FLOW METER T O T ALIZED FLOW PULSE WET WEATHER FLOW METER TOTALIZED FLOW PULSE GAS DETECT I ON SENSOR COMMON ALARM GAS DETECTION PUSH- T O-SILENCE BUTION GENERA T OR RUN STATUS (ON/OFF) GENERA T OR RUN S T ATUS (COMMON ALARM) MAKE UP A I R RUN S T ATUS (ON/OFF) MAKE UP A I R RUN STATUS (ALARM) EXHAUST FAN RUN STATUS (ON/OFF) EXHAUST FAN RUN STATUS (ALARM) SCUM PUMP S T ATION HIGH LEVEL ALARM DIGI T AL OUTPU T S: GAS DETECTION GREEN LIGHT ON GAS DETEC T ION RED L I GH T ON GAS DETEC T ION HORN ON ANALOG I NPUTS: EFFLUENT FLOW METER INSTANTANEOUS FLOW LEL CONCEN T RA T ION H:IS CONCENiRAfiON PUMP STATION LIVEL PROCESS FLOW Mctrn INStANfANrnus WET WEAfHl"R FLOW MtrEll 1NsfANTANWUs ELECTRICAL ROOM AM�IENT fEM�ERAtUiir ANALOG OUTPUTS: itF-P-LUENf FLOW fO :\AMPLER tfHERNtf: UV SYSiEM CONTROL GcNitR PRDcgss PWMP #I VFD PROCESS PUMP #2 VFO WET WEATHER PUMP #1 VFil WET WEATHER PUMP #2 VFli WET WEATHER PUMP #3 VFD WET WEATHER FILTER CONTROL PANEL (WWCP) VIA NEW JUNCT I ON BOX V I A NEW JUNC TI ON BOX VIA NEW JUNCTION BOX VIA NEW JUNCTION BOX VIA NEW JUNCT I ON BOX VIA NEW JUNCT I ON BOX VIA NEW JUNCT I ON BOX VIA NEW JUNCT I ON BOX VIA NEW JUNCT I ON BOX VIA NEW JUNCTION BOX VIA NEW JUNCT I ON BOX VIA NEW JUNC TI ON BOX VIA NEW JUNC T ION BOX VIA NEW JUNCTION BOX VIA NEW JUNC TI ON BOX VIA NEW MAG METER TRANSMITIER VIA NEW MAG METER TRANSMITIER V I A NEW VEGA VEGAMCT 842 CONTROLlER V I A NEW RADAR LEVEL SENSOR V I A N�W MAG MITER T RANSMITTER VIA NEW MAG METER fRAN5Ml1TcR VIA NiNI S[NSOR l"illER: HEAliWORKS CONi�OL PANtL LAiJ IBUILDINll Nm/ORK RTU GENERAL GAS DETECTION SYSTEM NOTES 1. MSA ULTIMA X500D SERIES OR ENG I NEER APPROVED EQUAL 2. M I N I MUM EQUIPMENT TO BE PROV I DED AND INSTALLED IS AS FOLLOWS: (1) LEL TRANSM I TIER/SENSOR @ 6"-12"' FROM CEIL I NG (1) H2S TRANSMITIER/SENSOR @ 3" A.F.F. (1) CALIBRATION K I T (1) CALIBRATOR 3. SYS T EMS T O BE INS T ALLED IN UPPER AND LOWER LEVEL AS SHOWN. 6"-12" FROM CEILING CEIL I NG LEL/METHANE 24VDC FROM SCADA RTU OR 120V T O POWER SUPPLY BU I LT I NTO UN I T H2S FLOOR 4 WIRES DC+ DC -- 4-20mA METHANE 4-20mA H2S GAS SENSOR DETAIL NOT TO SCALE .. • V. SCUM PUMP CONTROL PANEL- --1--- 1 MANUAL RECIRCULATION VALVE / !/ DRAIN · ..--a.. �LcC T RIC VALVr PROPOSED WEJ WEA T HER F I LTER CON T ROL PANEL (WWCP) iJ , _,,,.-- MANUAL y DISCHARGE VALVE NOTE: ALL CONDUITS IN HAZARDOUS LOCA T IONS TO BE PVC COATED RIGID OR ALUM I NUM, SEAL PER NEC. CONTROL W I RING I N CONDU IT TO 4" BACKWASH WWCP CON T ROL WIR I NG I N CONDUIT TO WWCP ------� I BACKWASH VACUUM GAUGE AND VACUUM TRANSMITIER FLOW METER , ) ( 0 II ,I f- ----j 1 1 -'-- '---"' ::---:::::rUJ-- -�,at-----t�+ r- 11-ml ll--111---f- -:;------m----ilf-------j ±1-- -- im -��Om: Hll • " r ,.-1 1 1-- - ---- -1� = . I'. ,,--',\\\------'.!\-"' ) ( 1 �,----.' 6" BACKWASH ,---m- -- - - - . - - -',/ _ ELECTRIC 120V + GND. IN VALVE (TYP.) 1-- •- U • a-4 " --' C :,: O :.:: ND "' U ,,, I T _ T cc O :....:: WW ::.: C c::. P______---, CONDUIT TO WW � P ... £ 120V + GND. IN - �- I I I ! "-s" SCUM ELECTRIC VALVE ( � TY = P � .) �:::::::=======:::::= -" :::., :!5..- -� , � � g � � � 6� � � T _ L _ T � � I R � 0w � NG � c � � N � - -�--1 � -----'-.L......--CONTROL '�LJ;;:G IN ,,.- K ' . . r-" - - - - - '-- f--- f--- '-- 0 0 0 0 f--LEVEL TRANSDUCER�HIGH LEVJ� . ! � , CONDUI I T &wq P I n n [i M- FLOAT SWITCH I- , ..., ..__ � f--- ' -- f--- f--- ' -- f-- 0 0 0 0 0 0 0 0 IIIlll RY n .-' - - J I I J:1-, --1 1 1'- - - 1� : ---U}·, t I I I I I , , . , ' ' ' ' b m ' 1 ,_ ,, ·' I I I � • � • la - -- l/� - - I -- .. I_ - _I / .1\ -- I NOTE: ELECTRICAb cOUIPMrN, IN WIT WEA T HoR FilTrn BU I LD I NG m CLASS I DIV. II, INSTALL PER NEC ART I Cl• 500, ELEGTRIGAl [QUIPMtNT I N ELECTRICAL ROOM 15 UNGLASS I FIEil- ALL POWER AND CONTROL CONDUITS SHALL BE SEALED PRIOR Td ENTERING EL[CTRICAb ROilM. PROPOSED MAU PROPOSED EXHAUST FAN MOTOR STARiER CONTROL WIRING I N CONDUIT TO SCADA PER 1/0 L I ST • . , " I I • - - I I GAS DETEC T ION SYS T EM •• " " , • • F,;-0 120V + GND. IN CONDU I T ,TO \'/WCP -8" SOL I DS WASTE clECiRIC VALVE (1YP,) NO T E: GAS DETECTION RED LIGHT, GREEN LIGHT AND HORN IS TWO-WIRE CONTROL SCADA ( TY P.) , ' ' ' , • " • "\, •· " • • ' , • CONTROL PANEL CONTROL WIR I NG IN ' CONDUIT TO SCADA ETHERNET TO SCADA PER 1/0 LIST '�- -PROPOSED 800A-3P SERVICE ENTRANCE RATED, AUTOMATIC TRANSFER SW I TCH CONTROL WIR I NG I N CONDU IT T O SCADA PER 1/0 LIST PER 1/0 LIS T ' • , " • ' " , " • '• , , • •• " , • , ' " . • " ' ' q ,. " " , ' • • , ' ," " "' ,' " ' • , • • ' ' ' " " • • ' " • ' • • • ,, ' , • • '" " , , • ' " • • , , , Rl £ 0 Z \ II £ ,;i ��· � 0 � z " • • • 'f ' • " • , • • ' " • • ' ' ". • ' • , • ' " , • • ' HIGH LEVEL ALARM CONTROL W I RING IN CONDU IT TO SCADA 1---PROPOSED 277/480V-3¢, BODA PANELBOARD "MDPA" " ' • , • • • � , " • , ' " • ' " ' PROPOSED 75'f(IIA-----,f----+---, TRANSFORMER ON 4" CONCRETE HOUSEKEEPING PAD PROPOSED 120/208V-3¢, 200A, PANEL "A" PROPOSED WET WEA T HER PUMP #2 VFO PROPOSED WET WEATHER PUMP #1 VFO PROPOSED PROCESS PUMP #3 VFO PROPOSED PROCESS PUMP #1 VFO PROPOSED FLOW METER TRANSMITIER • •" ' (WET WEATHER) PROPOSED WET WEATHER � FILTER BUILD I NG SCADA R T U CONTROL WIRING I N CONDUIT TO SCADA PER 1/0 LIST ETHERNET TO SCADA PER r PROPOSED PROCESS PUMP #2 VFD LIST CON T ROL WIR I NG I N CONDUIT w FIBER IN 2" CONDUIT--j w TO HEADWORKS 11 FIBER IN 2" CONDU IT � 60A-3P NON-FUSIBLE TO LAB BUILDING DISCONNECT IN NEMA 4X S.S. ENCLOSURE (1YP. OF 3) CON T ROL WIR I NG IN CONDUIT T O SCADA PER 1/0 LIST T O SCADA PER 1/0 LIST rt - ,----1---__j- -PROPOSED FLOW METER TRANSMITIER (PROCESS) 30A-3P NON-FUS I BLE DISCONNECT IN NEMA 4X S.S. ENCLOSURE (TYP. OF 2) • " • • , " , • • • " • ' ·• ' " ' • ' • • , •• • • ' '1- • " , • , , WET WEATHER FILTERING EQUIPMENT BUILDING CONTROLS PLAN SCALE: J," � 1'-0" REVISIONS 3/15/24 BID SET C2024 Midwcsicrn Enginc>ers. lnc. 802 West Bro.idway Street PO [k,� 2'l5 Loogootee. lndiam, 47.�53 DATE MARCH 2024 DESIGN A.F.B.. DRAWN C.N.M. a.c. CHECK W.A.E. PROJECT NUMBER 2020073-00 E5.03 114 OF 126 I FlLE NUMBER 43952 I Do Not Use Plan Previews for Take Off

RkJQdWJsaXNoZXIy NjAyODM2