Midwestern Engineers, Inc. Plan Preview
PROJECT CONTACTS GAS: NIPSCO GAS DEAN GARRETT 801 E. 86TH AVE. MERRILLVILLE, IN 46140 PH: 219-647-6260 UTILl1YCOORDINATION@NISOURCE.COM ELECTRIC NIPSCO ELECTRIC DEAN GARRETT 801 E. 86TH AVE. MERRILLVILLE, IN 46140 PH: 219-647-6260 UTILl1YCOORDINATION@NISOURCE.COM GENERAL PLAN NOTES: TELECOMS FRONTIER (TELEPHONE) JOB 8, LLC (FIBER) CENTURYLINK (FIBER) LEVEL 3 COMMUNICATIONS NETWORK RELOCATION PH: 877-366-8344 x 2 MCI (FIBER) MEDIACOM LLC (CABLE TV) MARK ZACHARKO 90 MAIN ST. BENTON, KY 42025 PH: 270-527-9939 x 3285 MZACHARKO@MEDIACOMCC.COM WINDSTREAM (COMMUNICATIONS) DEKALB COUNTY SURVEYOR DEKALB COUN1Y MICHAEL C. KLINE, SURVEYOR, P.E., P.L.S. 220 E. 7TH ST. AUBURN, IN 46706 PH: 260-925-2222 DEKALB COUNTY HIGHWAY DEPT. DEKALB COUN1Y BEN PARKER, HIGHWAY SUPERINTENDENT 306 E. ENSLEY AUBURN, IN 46706 PH: 260-925-1864; FAX: 260-925-1922 STREET DEPARTMENT: TOWN OF WATERLOO SUPERINTENDENT: DAVID WOLFE 120 S. BEST ST. WATERLOO, IN 46793 PH: 260-837-7623 STREET1@WATERLOOIN.GOV TOWN MARSHALL TOWN OF WATERLOO JAY OBERHOLTZER, TOWN MARSHALL 300 N. WAYNE ST. WATERLOO, IN 46793 PH: 260-837-3131 MARSHAL@WATERLOOIN.GOV SCHOOLS DeKALB COUN1Y CENTRAL INDIANA SCHOOL DISTRICT 3326 C.R. 427 WATERLOO, IN 46793 PH: 260-920-1011 WATERLOO ELEMENTARY 300 E. DOUGLAS WATERLOO, IN 46793 PH: 260-920-1016 WATER POLLUTION CONTROL TOWN OF WATERLOO PLANT SUPERINTENDENT: DAN HJELM 120 S. BEST ST. WATERLOO, IN 46793 PH: 260-226-5003 WATER2@WATERLOOIN.GOV WATER TOWN OF WATERLOO PLANT SUPERINTENDENT: DAN HJELM 385 W. WALNUT ST. WATERLOO, IN 46793 PH: 260-226-5003 WATER2@WATERLOOIN.GOV 1. TOPOGRAPHY SHOWN ON PLAN SHEETS IS INTENDED TO SHOW THE GENERAL LOCATION OF FENCES, CULVERTS, DRIVES, EXISTING UTILITIES, POINTS OF CONNECTION, ETC HOWEVER, EXACT LOCATION AND QUANTITIES SHALL BE VERIFIED AT THE TIME OF CONSTRUCTION. 2. THE HORIZONTAL LOCATION DATA IS BASED UPON THE INDIANA STATE PLANE COORDINATE SYSTEM (EAST ZONE) REFERENCED TO THE 1983 NORTH AMERICAN DATUM (NAVO 83). ELEVATIONS ARE BASED UPON THE 1988 NORTH AMERICAN VERTICAL DATUM (NAVO 88). 3 THE CONTRACTOR SHALL CALL INDIANA UNDERGROUND SERVICES AT 1-800-382-5544 PRIOR TO ANY CONSTRUCTION TWO FULL WORKING DAYS BEFORE CONSTRUCTION IS TO BEGIN. 4 THE LOCATION OF EXISTING UTILITIES ETC. SHOWN ON THESE PLANS ARE NOT THE EXACT LOCATIONS BUT ONLY A GENERAL LOCATION ALTHOUGH THESE PLANS HAVE ATTEMPTED TO SHOW ALL EXISTING UTILITIES, THE CONTRACTOR SHALL NOT ASSUME ALL EXISTING UTILITIES HAVE BEEN SHOWN. THEREFORE, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO SEE THAT ALL EXISTING UTILITIES WITHIN CONSTRUCTION AREAS ARE CLEARLY MARKED IN THE FIELD PRIOR TO ANY CONSTRUCTION IN THE AREA 5. PROPERTY LINES, WHERE SHOWN, ARE BASED ON COUNTY PLAT RECORDS. THE SAID PROPERTY LINES ON THESE SHEETS DO NOT REPRESENT PROPER1Y SURVEYS, BUT ARE ONLY APPROXIMATE LOCATIONS FOR REFERENCE PURPOSES ONLY 6. THE CONTRACTOR SHALL BE REQUIRED TO FIELD VERIFY EXISTING STRUCTURE AND PIPE DATA AND REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO ORDERING NEW STRUCTURES. 7. IF ANY ARCHAEOLOGlCAL ARTIFACTS OR HUMAN REMAINS ARE UNCOVERED DURING CONSTRUCTION, THE CONTRACTOR SHALL STOP ALL EXCAVATION WORK AND CONTACT THE INDIANA DEPARTMENT OF NATURAL RESOURCES - DIVISION OF HISTORIC PRESERVATION & ARCHAEOLOGY, PHONE NO. 317-232-1646. NO ADDITIONAL EXCAVATION WORK SHALL BE DONE WITHOUT RECEIVING THEIR APPROVAL. 6 THE CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT DUST CONTROL MEASURES (SURFACE WETTING) AS NECESSARY TO MINIMIZE FUGITIVE OUST EMISSIONS. 9. CONi�/\C'toR �HALL I N&'tAcl- �llT !'!)NCINQ; AT PERIM!T�R Of' NEW CONSTRUCTION SITE:S AND INLET PROTEC110N SOCKS AROUND INLETS IN YARD AREAS TO PREVENT DEBRIS/MUD FROM ENTERING THE SEWER WATER �Yiji'�M. l'H� i';§Ni!lM;fQ� I� lO MAINTAIN �ILi l'[Nt� ANO PROfECilON SOCKS fHROUGHOUT CONSTRUCTION PoRIOQ UNTIL GRASS IS ll:SfABLISHIW CONTRACTOR SHALL ALSO INSTALL PLATING ANDIOR LIDS TO PREVENT �TON� AN� [l��RI& IN �AVIHJ IIReA!l FROM �Nf�RING THI\ OtiAINAl>E mv$T�M DUR!N(i OONSTRUC::TION. ®Eg SH�ET S0102 l'OR AODITIONAL INFORMATION, 10 1':J(;NvN llMg §l')(Jqg1NA1lfJfJ MlJ�l B� MAtl[ WIT� THls WAij'f�WI\TER UTlblTY �YP!:�1NflcNtiENf ON!, W�EK, (51 WORKING !:JAY@ PlilOR TO ANY blN� TAPPING1GONN�Cf10N$ TAKING ANY TANKS OFF blN� DR OUT 01° SERVICE Al,�ICJ� ANY fl':)We� �l��l1�fl0N§ . gg�'fA(Jf DAN HJ�LM /If i�BfJ) 2�1i 0 iliiO@, E MARION ST PROJECT LOCATION WASTEWATER TREATMENT PLANT WATERLOO ELEMENTARY SCHOOL E DOUGLAS ST Iii .. z !! C z Cl) z ..J C .. w ::;; 0 i - - - - -- ---- - 1 --- ' ' ' ' ' ' I --- --- ' ' ' ' ' ' ' l ' ' L------------------ I -------------------� Iii Iii "' Cl) PROJECT AREA MAP SCALE: 1" = 200' 200 Know what's below Call before you dig. 100 0 200 Sheet Index Page Sheet 1 1 2 G1.02 3 G1.03 4 G1.04 5 G1.05 6 G1.06 7 G1.07 8 C1.01 9 C1.02 10 C1.03 11 C2.01 12 C2.02 13 C2.03 14 C2.04 15 C2.05 16 C2.06 17 P1.01 18 P2.01 19 P2.02 20 P2.03 21 P3.01 22 P3,02 23 P3.03 24 P3.04 25 P3.05 26 P3.06 27 P4.01 28 P4.02 29 P4.03 30 P4.04 31 P4.05 32 P5.01 33 PS.02 34 PS.03 35 P6.01 36 P6,02 37 P6.03 38 P6.04 39 P6.05 40 P7.01 41 P7.02 42 PS.01 43 PS.02 44 PS.03 45 PS.04 46 PS.OS 47 PS.OS 48 P9.01 49 P9.02 50 "'9.03 51 1>10.01 5� 1>1 o.O� 53 P1O.o:l 54 1>11.01 55 P11.02 56 Pi2.01 57 i:>12.02 58 P12:oa 59 P13.01 60 P13,02 61 P13.03 62 P14.01 63 P15.01 64 53,01 65 53.02 66 53.03 67 53,04 68 S3.05 69 53.06 70 S3.07 71 53.08 72 53.09 73 S3.10 74 S4.01 75 S4.02 76 54.03 77 SS.01 78 SS.02 79 SS.03 80 55.04 81 55.05 82 55.06 83 56.01 84 S6.02 85 S7.01 86 S7.02 87 58.01 88 S8.02 89 59.01 90 59.02 91 S11.01 92 511.02 93 511.03 94 S12.01 95 512.02 96 512.03 97 S12.04 98 512.05 99 512,06 100 S13.01 Description Title Sheet General Area Map, Drawing Index Existing Hydraulic Profile Process Hydraulic Profile Sludge Hydraulic Profile Existing Flow Schematic Flow Schematic Erosion Control Plan Erosion Control General Notes Erosion Control Details Site Demolition Plan Site Grading and Improvements Plan Site Piping and Utility Plan Site Details Site Details Site Details Existing Flow Control Demolition Existing Headworks Demolition Existing Plant Demolition Existing Plant Improvements New Headworks Building - Upper Level Plan New Headworks Building - Lower Level Plan New Headworks Building - Section New Headworks Building - Section and Details New Headworks Building - Section and Details New Headworks Building - Section and Details New Pump Station No. 1 - Plan New Pump Station No. 1 - Plan at Grade New Pump Station No. 1 - Section New Pump Station No. 1 - Section New Pump Station No. 1 - Section New Flow Filtering Building - Plan New Flow Filtering Building - Section New Flow Filtering Building - Section Existing UV Disinfection Demolition New UV Structure - Plan New UV Structure - Section and Details New UV Effluent Sewer - Plan and Profile New UV Equipment - Plan and Section New Effluent Flow Meter - Plan and Section New Cascade Structure - Plan and Section Existing Clarifiers Demolition Existing Clarifiers Demolition Existing Clarlflers - Plan Existing Clarifiers - Plan and Section Existing Clarifiers .. Section and Details Existing Clarifiers" Details Existing Sludge Crying Bed& - Plan Existing Sludge Drying Beds - Plan and Details Existing Sludge Drying Bed!S'" Sections Exlstihg Biower lillildiiig DehiOlitiOH EXiSting Bi1owet Bu11din9 • Plan and leouon Existing Blower Builaing .. Pian and iectior'I Existing BacKWaSh HOiding §truch..ir@ - Plan and C>etElilA Existing Baekwasli Holding §ttUCture - Pian and Profi1e Existing Chemical Feed D@r'nOlitiOri New Gherriicai Feed Building - Plan and Details NeW GhemiCal Feed Building - Section and Details New Sludge Dewatering - Plan New Sludge Dewatering - Plan and Details New Sludge Dewatering - Section and Details New Pump Station No. 2 - Plan and Section New Influent Flow Control Structure - Plan and Section New Headworks Building - Foundation Plan New Headworks Building - Structural Foundation Details New Headworks Building - Floor Plan New Headworks Building - Roof Plan New Headworks Building - Elevations New Headworks Building - Elevations New Headworks Building - Sections New Headworks Building - Sections New Headworks Building - Sections New Headworks Building - Schedules New Pump Station No. 1 - Foundation Plan New Pump Station No. 1 - Structural Details New Pump Station No. 1 - Structural Details New Flow Filtering Building - Foundation Plan New Flow Filtering Building - Floor Plan New Flow Filtering Building - Roof Plan New Flow Filtering Building - Elevations New Flow Filtering Building - Sections New Flow Filtering Building - Sections New UV Structure - Foundation Plans New UV Structure - Structural Details New Effluent Flow Meter - Foundation Plan New Cascade Structure - Foundation Plan Existing Clarifiers - Plan Existing Clarifiers - Structural Details Existing Sludge Drying Beds - Foundation Plan Existing Sludge Drying Beds - Structural Details Existing Backwash Holding Structure - Floor Plan Existing Backwash Holding Structure - Structural Details Existing Backwash Holding Structure - Structural Details New Chemical Feed Building - Foundation Plan New Chemical Feed Building - Floor Plan New Chemical Feed Building - Roof Plan New Chemical Feed Building - Elevations New Chemical Feed Building - Sections New Chemical Feed Building - Sections New Sludge Dewatering - Plan Page Sheet 101 S13.02 102 H1.01 103 H1.02 104 H3.01 105 H5.01 106 E2.01 107 E2,02 108 E3.01 109 E3,02 110 E3.03 111 E4.01 112 E5.01 113 ES.02 114 E5,03 115 E5,04 116 E6.01 117 E7.01 118 ES.01 119 E10.01 120 E11.01 121 E12.01 122 E14.01 123 E101 124 E102 125 E103 126 E104 Description New Sludge Oewatering - Structural Details HVAC Schedules and Details Plumbing Schedules and Details New Headworks Building - HVAC Plans New Flow Filtering Building - HVAC Plan Site Electrical Demolition Plan Site Electrical and Plumbing Plan New Headworks Building - Power Plans New Headworks Building - Lighting Plans New Headworks Building - Controls Plans New Pump Station No. 1 - Power and Controls Plan New Flow Filtering Building - Power Plan New Flow Filtering Building - Lighting Plan New Flow Filtering Building - Controls Plan New Flow Filtering Building - Controls Details New UV Structure - Power and Controls Plan New Effluent Flow Meter - Power and Controls Plan Existing Clarifiers - Power and Controls Plan Existing Blower Building - Power and Controls Plan Existing Backwash Holding Structure - Power and Controls Plan New Chemical Feed Building - Power and Controls Plan Existing Lab/Admin Building - Power and Controls Plan Existing Power Distribution One Line Diagram New Power Distribution One Line Diagram New Power Distribution One Line Diagram New Network Diagram REVISIONS BID SET C2024 Midwestern Engin�-ers. lnc. 802 West Bro.idway Street POBo�295 Loogootce. lndi,in" 47553 OAT£ MARCH 2024 DESIGN M.M.S. DRAWN D.AP . Q,C. CHECK W.A.E. PROJECT NUMBER 2020073-00 Gl.02 2 OF FIL£ NUMBER 44064 126 I Do Not Use Plan Previews for Take Off
Made with FlippingBook
RkJQdWJsaXNoZXIy NjAyODM2