Midwestern Engineers, Inc. Plan Preview

filJ\Bii'J [R.N.ol i2" D.I. EFFLUENT FROM CLARIFIER No.1 c> INV EL. 886.50' 3 18 EFFLUENT CHANNEL DEMOLITION SECTION SCALE, 1 /2" - 1 '-0" 1 WI. 888.15' (EA. CLARIFIER) EXISTING CLARIFIER EQUIPMENT IMPROVEMENTS SCALE, 1/4" - 1'-0" GENERAL NOTES, 1. CONTRACTOR TO REMOVE ALL EXISTING EQUIPMENT WITHIN THE EXISTING CLARIFIER AND ALL THE ANCHORING METAL BRACKETS, BOLTS ETC. 2. IF NECESSARY TO CUT OFF ANY DAMAGED METAL OR BOLTS RESULTING IN DAMAGE TO EXISTING CONCRETE STRUCTURE, SPOT REPAIRS TO DAMAGED AREAS MAY BE NECESSARY. 3. CHECK WITH EQUIPMENT MANUFACTURER TO VERIFY ALTERING BOTTOM SLAB SLOPE TO FACILITATE ADEQUATE EFFECTIVENESS OF SLUDGE REMOVAL Tb EFFLUENT ORIFICE 2 1; I Ti WALL ·· ·· ···········«�=�=� EL. 889.50' �T/Slab EL 887 50' (Inf Channel) �T/Slab EL 886 50' (Eff. Channel) INFLUENT CHANNEL DEMOLITION SECTION SCALE, 1 /2" - 1 '-0" NUMB eR 1 2 ... 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NOTATION TABLE . PIPING Existing 32' Dia. Exterior Concrete Wall to Remain fcxisting Influent Pipe Sleeve to be Removed and Wall Opening io Be Grout Filled Existing 14" Dia. Effluent Opening In Concrete. l�:tfluent Pipe To Remain In Use . . Existing Concrete Wall to Remain fn Use Existing RAS I WAS Channel to Remain in Use . . Existing 14 1 ' 0.1. Influent Line to be Abandoned in Place �xisting 6" D L Scum Drain Line to Remain in Use. ... . .. . ... . . Existing se:um te1esdOping Valve to Remain irl Use Existing 6" Dia. Tank Drain Plug Valve To Remain in Use Existing Scum Effluent Channel To Be Abandoned In Place . Existing 10" Dia. Scum Effluent Line To Be Abandoned In Place • Existing Clarifier Effluent Channel To Remain In Use Existing RAS / WAS Pumps to Be Removed Existing Concrete Wall To Remain ln Use. Remove Stop Plate Existing 12" Clarifier Effluent Pipe Removed Remove Existing Stop Plate and Weir Plate. ( Two Locations) Existing Equipment To Be Removed Effluent Trough Piping to Be Removed. ( Each Clarifier) . . Existing Clarifier Drain Line Telescoping Valve and Plug Valve to Remain In Use. Existing Plug Valve to Remain in Use Existing Concrete Wall To Be Removed Existing Effluent Opening and Effluent Pipe to Remain 1n Use Plug Existing Pipe Opening With Non-Shrink Grout Remove Existing Grate • Existing Metal Baffle To Be Removed Existing Fixed Davit Crane Base Existing Flushing Hydrant to Remain In Use Existing Sub. Pump Equipment "Fast Out" Equipment To Be Removed RE.VISIONS BID SET C2024 Midwestern Engineers. Inc. 802 West Broadway Street P.O. Box 295 Loogoolee. lndi�cw 47553 DATE MARCH 2024 DESIGN M.M.S. DRAWN D.A.P. Q.C. CHECK W.A.E. PROJECT NUMBER 2020073-00 P8.02 43 OF 126 I Flt.£ NUMBER I 44023 Do Not Use Plan Previews for Take Off

RkJQdWJsaXNoZXIy NjAyODM2