Midwestern Engineers, Inc. Plan Preview

LEGEND 17 mmm c:J D . . □ □ D D al -------- HOKE, TERRY 63-02-27-200-001 001-011 -------- FENCE TO BE -------- INSTALLED AS PART OF THIS PROJECT -------- DIVISION II � > ; __.--'> • � FEED BLDG. c.:,- 0 10 13 � "" � EX. TRANSFER ,__.,_,-u MITIGATION AREAS SEE DIVISION ill OF WATER SYSTEM IMPROVEMENTS MEI PROJECT 2015067-01 � '< iPUMP STATION � o 0 . " EX. EFFLUENT CHAMBER◊ NEW WATER TREATMENT PLANT SEE DIVISION I OF WATER SYSTEM IMPROVEMENTS, MEI PROJECT 2015067-01 '' • THE CITY OF PETERSBURG\ 63-02-27-200-002.001-011 \ j 1 FENCE TO BE '- - DIVISION II EX. CONTROL BUILDING �"--,__�l"' - NEW & EXISTING CLARIFIERS FLOW SPLITTER BOX THE CITY OF PETERSBURG 63-02-27-200-005.001-011 13 CHAIN LINK FENCE TO BE INSTALLED ALONG TREE LINE AND EDGE OF ROAD AS PART OF DIVISION II, MEI PROJECT 2015078-01 EXISTING BRUSH & WOODS FEED BUILDING OXIDATION DITCH - - GENERAL NOTES: 60 SULLIVAN, MARGARETT SUE 63-02-27-200-002.000-011 I I J- ..I-- NEW E.Q. BASIN AND HEADWORKS BUILDING SEE DIVISION I, MEI PROJECT 2015078-01> NEW SEPTAGE RECEIVING SYSTEM SEE DIVISION I, MEI PROJECT 2015078-01 SCALE: 1 11 = 60' 30 0 60 / FLOODWAY BOUNDARY PLAN KEYNOTE LEGEND: OJ [I] IT] 0 I}] I}] II] 0 0 � [i] @I @] � INSTALL NEW LAB/CHEMICAL FEED BUILDING AND PARKING AREA. INSTALL NEW OXIDATION DITCH. INSTALL NEW CLARIFIERS, FLOW SPUTTER BOX, FINAL CLARIFIERS AND RAS/WAS PUMP STATION. INSTALL NEW U.V. DISINFECTION, STEP AERATION TANK, AND U.V. STORAGE BUILDING. RENOVATE EXISTING FINAL CLARIFIERS No.1 AND No.2. RENOVATE EXISTING CONTROL BUILDING. RENOVATE EXISTING ANAEROBIC DIGESTER TANK AND INSTALL NEW DIGESTER COVER, NEW MIXING EQUIPMENT, MIXING PUMP BUILDING AND NEW WASTE GAS BURNER. RENOVATE EXISTING SLUDGE DRYING BEDS ANO INSTALL NEW CONTAINER BAG SLUDGE DEWATERING SYSTEM AND POLYMER FEED BUILDING. RENOVATE EXISTING PRIMARY TANK TO NEW RETAINING WALL RENOVATE EXISTING TRANSFER PUMP STATION. INSTALL NEW STONE ACCESS ROAD. INSTALL NEW CONCRETE DRIVE, SIDEWALKS AND STEPS INSTALL NEW CHAIN LINK FENCE INSTALL NEW45 FT. ROLLING GATE. i i l � INSTALLED AS PART OF THIS PROJECT DIVISION II j I I LOCATION OF ADDITIONAL BORROW MATERIAL I I I / 100-YEAR FLOODPLAIN BOUNDARY, BFE ""' 427.0', ZONE A / BENCH MARK AND CONTROL POINT SCHEDULE STRUCTURE LOCATION SCHEDULE EXISTING STRUCTURES PROPOSED STRUCTURES - -- cc--- EXISTING CHAIN LINK FENCE POWER POLE w/GUY WIRE 1. REFERENCE STRUCTURE PLAN SHEETS FOR ADDITIONAL INFORMATION ITEM NORTHING EASTING ELEVATION DESCRIPTION ITEM NORTHING EASTING DESCRIPTION EXISTING CONCRETE STRUCTURE OR SURFACE PROPOSED CONCRETE STRUCTURE OR SURFACE EXISTING ASPHALT SURFACE PROPOSED ASPHALT SURFACE EXISTING STONE DRIVE OR SURFACE PROPOSED STONE DRIVE OR SURFACE EXISTING RIP-RAP 100-YEAR FLOODPLAIN BOUNDARY (ELEV. 426.9' APPROX.) ABANDONED STRUCTURES EXISTING STRUCTURES DEMOLISHED THIS PROJECT BM-1 �CP-1 SL,1 -' G cS ===== PROPOSED CHAIN LINK FENCE EXISTING DITCH I FLOW LINE PROPOSED DITCH/FLOW LINE BOUNDARY SURVEY CONTROL POINT OR BENCH MARK LOCATION (SEE SCHEDULE) STRUCTURE LOCATION (SEE SCHEDULE) BURIED TELEPHONE JACK GAS METER ELECTRIC METER CULVERT NEW e MH301A EX MH301 El} _ NEW CB101 EX CB1 0 [§5] .;; - BM-1 PROPOSED MANHOLE, NAME & NUMBER SEE MANHOLE SCHEDULE FOR CP-4 ADDITIONAL INFORMATION CP-5 EXISTING MANHOLE, NAME & NUMBER, CP-8 PROPOSED STORMWATER CATCH BASIN, NAME & NUMBER CP-9 CP-10 EXISTING STORMWATER CATCH BASIN, NAME & NUMBER CP-11 ELECTRICAL MANHOLE CP-25 CP-26 FIRE/YARD HYDRANT 1181909 58 2893093 24 437_53 NE RIM OF SAN. MANHOLE SL-1 1181772.78 2892999.78 U. V. DISINFECTION - SW CORNER 1182071.49 2892887 50 440.95 i" REBAR, WALKER SL-2 1181764.16 2893042.78 u.v. DISINFECTION - NE CORNER 1181839.62 2893248.74 431.73 i" REBAR, WALKER SL-3 1181743.29 2893247.18 PRIMARY CLARIFIERS - CENTER, WEST TANK 1181816.42 2892974.20 431.05 j" REBAR SL-4 1181716.96 2893303.31 PRIMARY CLARIFIERS - CENTER, EAST TANK 1181932.68 2893033.21 432.21 NAIL SL-5 1181674.50 2893333.65 OXIDATION DITCH - END RADIUS AT SW WALL 1181829.36 2893084.72 434.00 NAIL SL-6 1181657.22 2893429.37 OXIDATION DITCH - END RADIUS AT NE WALL 1181800.27 2893538.87 440.79 j" REBAR SL-7 1181792.20 2893415.27 LAB/CHEMICAL FEED BUILDING - NW CORNER 1181826.57 2893335.88 433.62 MAG NAIL, KISSEL SL-8 1181756.25 2893463.23 LAB/CHEMICAL FEED BUILDING - SE CORNER 1181822.84 2893445.06 436.79 MAG NAIL SL-9 1181819.14 2893349.72 DRIVE TO PRIMARY CLARIFIERS WEST RADIUS AT EX. ROAD S-10 1181816.73 2893412.75 DRIVE TO LAB WEST RADIUS AT EX. ROAD S-11 1181817.64 2893473.07 DRIVE TO LAB EAST RADIUS AT EX. ROAD OVERALL SITE IMPROVEMENTS AND STRUCTURE LOCATION PLAN REVISIONS 09-20-23 © 2021 i'l!idwc,tcrn Engineers. Inc. 802 IV�sl Bro:1dway Strecl P.O. Um< 295 Loo1iootcc. lndi1,na 47553 DATE FEB. 2021 DESIGN C.W.R. DRAWN O.C. CHECK R.D.W. PROJECT NUMBER 2015078-01 C102 11 OF 114 FILE NUMBER 42061 Do Not Use Plan Previews for Take Off

RkJQdWJsaXNoZXIy NjAyODM2