Midwestern Engineers, Inc. Plan Preview

GENERAL PLUMBING NOTES 1, THESE NOTES APPLY TO All PLUMBING DRAWINGS. ADDITIONAL GENERAL NOTES SPECIFIC TO A PARTICULAR DRAWING ARE SHOWN ON THOSE SHEETS. 2. ALL PLUMBING SYSTEMS TO BE INSTALLED TO MEET THE REQUIREMENTS OF THE INDIANA PLUMBING CODE, 2012 (INTERNATIONAL PLUMBING CODE, 2006 WITH INDIANA AMENDMENTS). COMPLY WITH ADA AND ACCESSIBILITY LAWS AND REGULATIONS AND ALL OTHER AUTHORITIES HAVING JURISDICTION. 3. WORK INCLUDES FURNISHING All LABOR. MATERIALS, APPLIANCES, EQUIPMENT, TOOLS, TRANSPORTATION, SUPERINTENDENCE, CLEAN-UP, AND SERVICES REQUIRED TO CONSTRUCT AND INSTALL A COMPLETE FULLY OPERATIVE PLUMBING SYSTEM FOR THE PROJECT. 4. ALL NEW WORK IS DRAWN DARK. ALL ITEMS DRAWN LIGHT ARE EXISTING. EXISTING ITEMS SHALL REMAIN UNLESS SPECIFICALLY NOTED OTHERWISE. 5. CONTRACTORS SHALL PROTECT ALL EXISTING OWNER FACILITIES DURING CONSTRUCTlON. ANY ITEM DAMAGED OR DISCONNECTED BY CONTRACTOR OPERATIONS SHALL BE FULLY RESTORED TO PREVIOUS OPERATING AND APPEARANCE CONDfTION. PROVIDE PLATING AS REQUIRED TO PROTECT SURFACE OF EXISTING PARKING LOT INCLUDING UNDER WHEELS OF DUMPSTER, LIFTING DEVICES AND OTHER EQUIPMENT THAT COULD SINK INTO ASPHALT. 6. ALL UNDERLINED EQUIPMENT IS SCHEDULED, SEE SCHEDULE SHEETS. 7. CONTRACTOR SHALL COORDINATE WORK WITH All. OTHER TRADES AND STRUCTURAL CONDITIONS PRIOR TO INSTALLATION. CONTACT ENGINEER WITH CONFLICTS OR DISCREPANCIES. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR CORE DRILLING AND CUTTING HOLES THRU WALLS AND FLOORS k3 REQUIRED TO INSTALL NEW PIPING WHETHER SHOWN OR NOT. 9. ALL PENETRATIONS THRU RATED CONSTRUCTION TO BE FIRE STOPPED. 10. UNLESS OTHERWISE NOTED, INTERIOR DRAINAGE PIPING SHALL BE INSTALLED AT 1/8' PER FOOT SLOPE. 11. PIPE AND DUCTWORK ROUTINGS SHOWN ON DRAWINGS ARE DIAGRAMMATIC ANO ARE A SUGGESTED METHOD FOR DESIGN. CONTRACTOR SHALL BE RESPONSIBLE FOR FlNAL COORDINATlON, LAYOUT, AND CODE COMPLIANCE. 12. SCALES INDICATED ARE FOR ARCHITECTURAL REFERENCE ONLY. 00 NOT SCALE DRAWINGS. IT IS NOT INTENDED THAT THE DRAWINGS SHOW EVERY PIPE, DUCT, FITTING, SUPPORTS, ETC., AND IT IS UNDERSTOOD THAT THE DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES WILL PERMIT, THE PROPER INSTALLATlON ACCORDING TO THE TRUE INTENT AND MEANING OF THE DRAWINGS, LOCAL CODES ANO STANDARD PRACTICES SHALL BE PROVIDED. 13. COORDINATE VENT PENETRATIONS WITH MECHANICAL ROOF TOP EQUIPMENT, REFER TO HVAC DRAWINGS. OFFSET VENTS AS REQUIRED TO MAINTAIN MINIMUM 10' -0' SEPARATION FROM AIR INTAKES. 14. All. FLOOR MOUNTED EQUIPMENT SHALL BE MOUNTED ON A CONCRETE HOUSEKEEPING PAD. 15. CONTRACTOR SHALL FIELD Vi:RIFY EXISTlNG PIPE AND EQUIPMENI SIZl:S, LOCATIONS, ELEVATIONS, MATERIALS, ETC. BEFORE BIDDING OR BEGINNING WORK. 16. CONTRACTOR SHALL COORDINATE SHUT DOWN OF ANY MECHANICAL SYSTEM WITH THE OWNER, OCCUPANTS OF THE AFFECTED AREA, AND ANY OTHER AUTHORITY HAVING JURISDICTION. 17. REMOVE ALL PIPING, VALVES, EQUIPMENT, ETC. MADE OBSOLETE AS A RESULT OF NEW CONSTRUCTION. 18. THOROUGHLY REVIEW ALL DRAWINGS PRIOR TO ANY DEMOLITION WORK. ANY DEVICES REMOVED ACCIDENTALLY WILL BE REPLACED AT NO ADDITIONAL COST TO OWNER. 19. DISPOSAL OF DEMOLISHED MATERIALS SHALL COMPLY WITH ALL LOCAL, STATE, ANO FEDERAL REGULATIONS. 20. PIPING SUPPLIES TO FIXTURES ARE SAME SIZE AS INDICATED IN ROUGH-IN SCHEDULE UNLESS OTHERWISE NOTED ON DRAWINGS. 21. FURNISH AND INSTALL ALL ITEMS NECESSARY TO MEET THE REQUIREMENTS OF THE UTlLITY COMPANY WHETHER INDICATED IN DRAWINGS AND SPECIFICATlONS OR NOT. VERIFY PIPING ROUTING ANO RUNS, TAP LOCATIONS, AND INVERT ELEVATIONS REQUIRED PRIOR TO COMMENCING WORK. 22. EXISTING BELOW SLAB PIPING SHOWN ON THIS PLAN HAS BEEN DRAWN FROM AS-BUILT DOCUMENTS, FIELD SURVEYS, AND OTHER AVAILABLE SOURCES. CONTRACTOR MUST USE THESE DOCUMENTS AS A GUIDE TO COMPLETE WORK SHOWN HEREIN AND INCLUDE IN THEIR BUDGIT COSTS FOR MINOR FIELD DEVIATIONS. WHERE MAJOR DEVIATIONS ARE EXPOSED (WHERE THE INTENT OF WORK CANNOT BE COMPLETED AS SHOWN), CONTRACTOR SHALL STOP WORK IN THE EFFECTED AREA AND NOTIFY ENGINEER OF DISCREPANCY. 23. COORDINATE DELIVERY AND STORAGE OF MAfERIALS WITH THE OWNER. 24. FURNISH All CERTIFlCATES OF APPROVALS BY THE PLUMBING INSPECTOR AND BOARD OF HEALTH. 25. MAINTAIN A MINIMUM CLEARANCE OF THREE FEET IN FRONT OF ELECTRICAL PANELS AND ONE FOOT EITHER SIDE WfTH PIPE. 26. INCLUDE IN BID, ALL LICENSE, PERMIT, INSPECTlON ANO OTHER FEES REQUIRED TO COMPLITT WORK. 27. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT AND OTHER DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS. 28. CONTRACTOR SHALL PROVIDE AND INSTALL NAIL PLATES WHERE PIPING PASSES THROUGH STUD(S) WITHIN 2' OF NAILING SURFACE TO PROTECT PIPE FROM NAILS OR DRYWALL SCREWS. PLAN NOTES 0 2" METERED DOMESTlC WATER SERVICE FROM BELOW. 0 )f HOT ANO COLD WATER, 2" VENT. 0 ½" HOT ANO COLO WATER, 1Jf WASTE, 1½" VENT. 0 )f HOT ANO COLD WATER. ® ½" COLD WATER, 2" VENT. 0 ¾" COLD WATER. 0 3" VENT UP, 3" VENT THRU ROOF ® ½" COLD WATER, 1½" WASTE, 1½" VENT. 0 1) f ' COLO WATER. @ 3/4" GAS DOWN TO FURNACE. MAKE FINAL CONNECTION WITH SHUTOFF VALVE, UNION AND DIRT LEG. ¾" HOT AND COLD WATER, 1½" WASTE, vr VENT. EXTEND ½" HOT AND COLO WATER TO SINK FAUCET, ½" HOT AND COLO WATER TO EYEWASH, AND ½" COLD WATER TO OWNER FURNISHED REVERSE OSMOSIS SYSTEM MOUNTED IN BASE CABINET. ¾" HOT AND COLO WATER DOWN. ROUTE HORIZONTALLY IN CASEWORK CHASE. ROUGH IN ½" HOT WATER WITH SHUTOFF VALVE. MAKE FINAL CONNECTION TO DISHWASHER PER MANUFACTURERS REQUIREMENTS. CONNECT DRAIN HOSE TO SINK (SK-1) TAILPIECE. @ 1½" VENT DOWN. ROUTE HORIZONTALLY IN CASEWORK CHASE TO SINK ROUGH-IN. 1/2" GAS DOWN IN UNIT HEATER. MAKE FINAL CONNECTION WITH SHUTOFF VALVE, UNION AND DIRT-LEG. ROUGH-IN 2" STANDPIPE FOR CONDENSATE DISPOSAL OF ELECTRICAL ROOM AIR CONDITIONER. FIELD VERIFY HEIGHT. SEAL GAS PIPE PENETRATION THRU EXTERIOR WALL WEATHER-TIGHT. INSTALL MAIN SHUTOFF VALVE AT 48" A.F.F. 1/2" COLD WATER. ROUTE 1/2'' VACUUM PIPING (TYPE 'L' COPPER TUBING) IN CASEWORK CHASE. EXTEND DOWN TO OWNER FURNISHED VACUUM PUMP MOUNTED IN BASE CABINET AND MAKE FINAL CONNECTION PER MANUFACTURERS REQUIREMENTS. -r ¾"� PRESSURE GAUGE---+-L . -o THERMOMETER--- Q t* (TYPICAL) I THERMOSTATIC � 1 MIXING VALVE "---.._ - I -SPRING CHECK (TMV-1) ,-----, 1,JS-,1 �//-----REFER TO HVAC DRAWINGS ASME TEMPERATURE ----- ,, AND PRESSURE ----._,;r RELIEF VALVE TERMINATE RELIEF-------1 OVER FLOOR DRAIN TANK DRAIN VALVE � I 4'' CONCRETE i HOUSEKEEPING� - WATER HEATER (WH-1) Jr--uNIDN (TYPICAL) /Z-SHUTOFF VALVE ---+-,11 (TYPICAL) ---DIRT-LEG FLOOR DETAIL "A" WATER HEATER PIPING NOT TO SCALE ,, ' I. ' 'f--- - 1 ' - OFFICE _J WATER HEATER (WH-1) HB-1 ¾" PIPE THRU---,;, FLOOR ¾" I .. ½" , 1/ SK-2 2" METERED DOMESTIC WATER SERVICE 1" � �½" SH-I / WC-1 ) HYD-1 WATER ISOMETRIC -I r-s-f lv-1 IMB-1 I I I ¾" NOTTO SCALE SK-I LABORATORY T ¾"--, ,� I I ' '. B C -- , EWC-1 "' EWC-1 SS-1 HB-1 0 FD-2 _;c-�-- 11 .__/ , # ,- '� I./. r,( �\\ ">)� 1, (\ 1 1 1 if �v , I -:;:';��� I J, CHEMICAL FEED ROOM / HYD-1 - r'i 1' '-----�--�-- - --�,+----��- ,_1 -L I " OFFICE ¾" I½" I" SK-2 / I RESTROOM 15 ELECTRICAL ROOM DOMESTIC WATER PLAN SCALE:¼" = 1 '-0'" -, / / - - NEW CHEMICAL FEED BUILDING • REVISIONS 9/' /207' BID SET it! 2021 /lfalw�st�rn Engin�er.,. Inc. SO� w�st Brnadwa) S1rec1 P.O. Box �<)5 LOO!!,<l<Jlc'<:. lmliana 47553 DATE SEPT. 2021 DESIGN A.F.B. DRAWN C.N.M. Q.C. CHECK R.D.W. PROJECT NUMBER 2015078-01 P1 .12 35 OF 11 4 FlLE NUMBER 42037 Do Not Use Plan Previews for Take Off

RkJQdWJsaXNoZXIy NjAyODM2