Midwestern Engineers, Inc. Plan Preview

� w � u u ' ' . = ' l 0 0 w' i u' �w •• WW -· �� �� � -- ;;; 0 .� -· --- �� "II -· £� •a --- 6� <rl □-, 00 �< "' uY !; <N Q ,� <• GENERAL MECHANICAL NOTES MECHANICAL CONTRACTOR SHALL REFER TO THE SPECIFICATIONS FOR REQUIREMENTS RELATING TO EQUIPMENT QUALITY, CONSTRUCTION AND FINISH OF MATERIALS. THESE DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION FOR PIPING, DUCTWORK, CONDUIT, ETC. THE EQUIPMENT SHOWN ILLUSTRATES SUGGESTED ROUTING, BUT ALL NECESSARY OFFSETS AND FITTINGS MAY NOT BE SHOWN CONTRACTOR SHALL INSTALL HIS WORK IN A MANNER THAT WILL CONFORM WITH THE STRUCTURE. CONTRACTOR SHALL AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND MAINTAIN MAXIMUM CLEARANCE WITHOUT FURTHER INSTRUCTION FROM THE ENGINEER OR ADDITIONAL COST TO THE OWNER. ALL DIMENSIONS SHOWN ON THESE PLANS ARE IN FEET AND/OR INCHES UNLESS NOTED OTHERWISE. ALL DUCTWORK, PIPING AND VALVES SHALL BE CONCEALED ABOVE CEILINGS AND WITHIN WALLS IN FINISHED AREAS UNLESS OTHERWISE NOTED. ALL SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK SHALL BE INSULATED WITH 1Y," DUCTWRAP. EQUIPMENT SIZES AND SERVICE SPACE REQUIREMENTS MAY VARY BETWEEN DIFFERENT MANUFACTURERS. CONSULT APPROVED MANUFACTURER DRAWINGS AS SUBMITTED, AND COORDINATE WITH THESE DRAWINGS. ALL EQUIPMENT SHALL BE OF, AND CONSIST OF AT LEAST THE MINIMUM SIZES SCHEDULED. ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING LOCATIONS AND SIZES SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION BY THE CONTRACTOR. ALL VALVES, COILS, DAMPERS, ETC. SHALL BE INSTALLED ALLOWING EASY ACCESS. AREAS ADJACENT TO THE ACCESS PANELS SHALL BE CLEAR OF ANY OBSTRUCTIONS. ALL WALL THERMOSTATS SHALL BE APPROXIMATELY 4'-6" ABOVE FINISH FLOOR TO BOTTOM AND LINED UP HORIZONTALLY WITH LIGHT SWITCHES UNLESS OTHERWISE NOTED OF DIRECTED BY THE ENGINEER. THERMOSTATS IN PUBLIC AREAS SHALL HAVE LOCKING COVERS. COMBUSTION AIR PIPE SHALL BE PVC. GAS VENT PIPING SHALL BE CPVC UNLESS OTHERWISE NOTED. CONTROLS AND SEQUENCE OF OPERATION SHALL BE AS INDICATED ON DRAWINGS. PROVIDE A MINIMUM OF 1O'-0" FROM ANY EQUIPMENT AND PLUMBING VENTS FROM ALL OUTSIDE AIR INTAKES, DOORS, OR OPERABLE WINDOWS. REFER TO MECHANICAL SCHEDULES AND DETAILS FOR ADDITIONAL EQUIPMENT REQUIREMENTS. EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE INSTALLATION OF HIS WORK WITH THE WORK OF OTHER CONTRACTORS PRIOR TO THE INSTALLATION. REFER TO ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL COORDINATION WITH THESE DRAWINGS. CONTRACTOR SHALL NOT LOCATE ANY DUCT OR PIPING DIRECTLY OVER ANY ELECTRICAL PANELS, SWITCH GEAR, TRANSFORMER, ETC. COORDINATE LOCATIONS OF DUCTS AND PIPING WITH THE ELECTRICAL CONTRACTOR TO AVOID THESE CONFLICTS ALL HVAC SYSTEMS SHALL BE WIRED BY THE ELECTRICAL CONTRACTOR AND SHALL BE PLACED ON A DEDICATED CIRCUIT. SERVICE SPACE FOR EQUIPMENT SHALL NOT BE BLOCKED WITH PIPING, DUCTWORK, ETC. DUCTS PENETRATING ROOF, FLOOR SLABS AND/OR WALLS SHALL BE SEALED AS REQUIRED BY CODE. DUCTS PENETRATING FIRE RATED WALL AND/OR FLOOR SHALL HAVE OPENING AROUND DUCT SEALED WITH A MATERIAL HAVING THE SAME FIRE RATING AS THE WALL OR FLOOR. �-DUCT MAIN - SEE PLANS FOR SIZES ! TRANSITION FROM RRECTANGULAR , - 0 ROUND l - I r �MAXIMUM FLEX LENGTH IS 5'-0" DUCT SHALL BE ROUTED LEVEL, NO SHARP KINKS ALLOWED 45' TAKE-OFF BOOT VOLUME DAMPER ( TYPICAL) BRANCH DUCT TAKE-OFF DETAIL NOT TO SCALE STAINLESS STEEL HOSE 7 CLAMP REQUIRED ON INNER FLEX LAYER STRUCTURE SUPPORT FROM STRUCTURE VENT MECHANICAL SCHEDULE AH-1 TRANE - 3 TON SPLIT SYSTEM MODEL# 4TXCB003DS3+S9X1B080D4PSB HEATING INPUT, 80,000 BTUH HEATING OUTPUT, 77,600 BTUH 1,025 CFM, 120V-1¢, 12.4 AMPS CU- I TRANE - 3 TON SPLIT SYSTEM MODEL# 4TTR3036H1 1,025 CFM, 208V-1¢, 19 AMPS EF-1 GREENHECK - UPBLAST EXHAUST FAN MODEL# CUE-095-DGE119XQD 430 CFM @ .20" SP, Ya HP, 120V-1¢ w/ INTEGRAL DISCONNECT BACKDRAFT DAMPER, BIROSCREEN INTERLOCK WITH LOUVER MANUFACTURER RECOMMENDED ROOF CURB OR APPROVED EQUAL EF-2 GREENHECK - CEILING EXHAUST FAN MODEL# SP-B80-QD 77 CFM@ .125" SP, 120V-10, 18.6 WATTS GREENHECK WC-6 HOODED WALL CAP OR APPROVED EQUAL L-1 GREENHECK - COMBINATION LOUVER/DAMPER MODEL# ECD-60I, 12",18" KYNAR FINISH, BIRDSCREEN ELECTRIC ACTUATOR INTERLOCKED w/ EXHAUST FAN TOP OF WALL OPENING TO BE 1o'-0" A.F.F. OR APPROVED EQUAL GFUH-1 REZNOR - GAS FIRED UNIT HEATER MODEL # UDZ30 30,000 BTUH INPUT, 456 CFM 120V-1¢, 1.9 FLA, 0.06 HP CEILING SUSPENSION KIT, VERTICAL COMBUSTION KIT w/ CONCENTRIC ADAPTER, THERMOSTAT, OR APPROVED EQUAL AH-2 TRANE - 2 TON MINI-SPLIT SYSTEM MODEL # TPKAOA024·1 KA70A 24,000 BTUH WALL-MOUNTED INDOOR UNIT 3 SPEED AUTO FAN, 635/705/775 CFM CU-2 TRANE - 2 TON MINI-SPLIT SYSTEM MODEL # TRUYA0241HA70NA 208V-1¢. 19.0 A COOLING ONLY MAINTAIN 12" SUPPORT AS , MIN. FROM WAf_l 1 REQUIRED : I ------------r--1:=:[e--+- \, ���- 1� 0 -_J 1 � VENT c__ -----fr- V. - l hl -\SEAL I I / INNER FLEX OUTER WALL j' FLEX WALL ""-.....,� ADJUSTABLE RADIUS SUPPORT BRACE � NYLON TIE STRAP ON OUTER FLEX LAYER I _ LAY-IN DIFFUSER SEE FLOOR PLAN FOR SIZE TYPICAL DIFFUSER CONNECTION DETAIL NOT TO SCALE 2 · COMBUSTION PENETRATION AIR WATERTIGHT COMBUSTION� AIR CONCENTRIC VENT THRU WALL DETAIL NOT TO SCALE MECHANICAL LEGEND -+- -flt-> �-,oo• R,•] �8 t-l 0 �OR(;j @ OR@J 0 VOLUME DAMPER AIR FLOW RETURN AIR DUCT SUPPLY AIR DUCT RETURN AIR GRILLE EXHAUST GRILLE EXHAUST FAN SUPPLY DIFFUSER THERMOSTAT r 140 CFM STORAGE CLOSET ' 140 CFM 8" OFFICE t 't \ OFFICE PLAN NOTES 0 10"x10" DUCT UP TO EXHAUST FAN, INSTALL 10"x10" CEILING MOUNTED GRILLE. 0 4" COMBUSTION AIR AND VENT UP TO ROOF. TERMINATE w/ VERTICAL COMBUSTION KIT 0 0 ® 0 TERMINATE EXHAUST w/ WALL CAP. 3" COMBUSTION AIR AND VENT THRU WALL. TERMINATE w/ MANUFACTURER FURNISHED CONCENTRIC VENT KIT. INSTALL MANUFACTURER FURNISHED CONCENTRIC VENT SYSTEM PER INSTALLATION INSTRUCTIONS. TERMINATE w/ WALL CAP. OUTDOOR AIR INTAKE WALL CAP LIKE BROAN 643FA. 8" ' ' 175 CFM � 8" er r 5" 5 CU-I ' 0 X ,-- " ' f.::;r 8 ' . 'r J LABORATORY �� ' 175 CFM "'\'' 8" � 6" ; ;J 80 CFM 175 CFM ,-- 1: 11 LL__ HVAC PLAN SCALE:¼"= 1'-0" ;J:: l i / CHEMICAL FEED ROOM ELECTRICAL ROOM / NEW CHEMICAL FEED BUILDING • - REVISIONS 9/' /202' BID SET © 2021 Midw�,tcm Et1ginc..,r-.. Inc. go:, w�-,.t Broadway Sm·ct P.O. Box 195 Loogwl<.'<.'. lndi:,na . .j7;\5J OATE SEPT. 2021 ' DESIGN AF.B. DRAWN C.N.M. Q.C. CHECK R.D.W. PROJECT NUMBER 2015078-01 H1 ' 1 7 40 OF 11 4 FILE NUMBER 42032 Do Not Use Plan Previews for Take Off

RkJQdWJsaXNoZXIy NjAyODM2