Midwestern Engineers, Inc. Plan Preview
1 2 4 6 7 B 9 RS ' <D °' R4 <D I of-- - --- ---------------, D "\ .... REF. HVAC PLANS�� ::,. \[SJ\,_IJ 1 9' -�" -,i<--------------<R4>----------.>- 20'-0" -,i<--------------<RS>----------t-,(- I N D 0 RB D ROOF DEMOLITION PLAN SCALE: 1/4" - 1'-0" I ROOF DEMOLITION PLAN KEYED NOTES[ - - - -, GENERAL NOTES ' @ EXISTING STEEL BEAM TO BE CUT & REMOVED. THE GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION ACTIVITIES w/ SUBCONTRACTORS, OWNER, & ENGINEER IF UNSURE. ENGINEER SHALL DETERMINE AS TO WHETHER ITEMS SHALL BE DISPOSED, SALVAGED, OR REINSTALLED. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL @ EXISTING STEEL JOIST TO BE CUT & REMOVED. REMOVED ITEMS. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DISPOSE OF ALL DEMOLISHED MATERIALS IN @ EXISTING STEEL ANGLE TO BE CUT & REMOVED. ACCORDANCE w/ LOCAL, STATE, AND FEDERAL REGULATIONS. THE DRAWING AND PHOTOS SHOWN ARE FOR REFERENCE ONLY. PRIOR TO THE START OF @ EXISTING METAL DECK PAN TO BE CUT & REMOVED TO EXTENT AS SHOWN ON ROOF DEMOLITION PLAN. DEMOLITION, THE GENERAL CONTRACTOR SHALL INSPECT AREAS OF THE WORK TO BE PERFORMED AS WELL AS DOCUMENT THE CURRENT CONDITIONS. ANY DAMAGES NOT DOCUMENTED AND SUBMITIED TO OWNER/ENGINEER PRIOR TO THE START OF DEMOLITION SHALL BE THE @ EXISTING ROOF MEMBRANE & INSULATION BRO TO BE REMOVED TO EXTENT AS SHOWN ON ROOF DEMOLITION PLAN. RESPONSIBILITY OF THE GENERAL CONTRACTOR. ALL EXISTING ITEMS TO REMAIN SHALL BE PROTECTED FROM DAMAGE THROUGHOUT THE ENTIRE @ EXISTING ROOF MEMBRANE, INSULATION BRO, & METAL COPING AT PARAPET WALL TO BE REMOVED. LENGTH OF THE CONTRACT AND SHALL BE CLEANED OF CONSTRUCTION MATERIAL AND DUST TO THE SATISFACTION OF THE OWNER BEFORE SUBSTANTIAL COMPLETION. ® EXISTING AERALATER TO BE REMOVED. ANY DAMAGES OBTAINED TO EXISTING MATERIALS THROUGHOUT THE CONSTRUCTION PERIOD SHALL BE REPLACED OR REPAIRED IN A MANNER SO THAT THE MATERIAL DOES NOT APPEAR TO HAVE BEEN DAMAGED. @ EXISTING GUTIER TO REMAIN. DO NOT DRILL, CUT, OR REMOVE EXISTING STRUCTURAL MEMBERS, UNLESS NOTED OTHERWISE (UNO) ON PLANS. @ PROPOSED ROOF CURB OPENING FOR PROPOSED EXHAUST FAN. PROVIDE NECESSARY ITEMS FOR FLASHING ROOF CURB TO EPDM ROOF TO ENSURE ROOF REMAINS WATERTIGHT. REPAIR ALL VOIDS IN FLOOR SLABS AND ROOFS WHERE EQUIPMENT AND PIPING HAS BEEN REMOVED WITH LIKE MATERIAL. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LOCATING ALL EXISTING STRUCTURES & UTILITIES. MECHANICAL, ELECTRICAL, & PLUMBING ITEMS TO BE REMOVED ARE SHOWN FOR REFERENCE ONLY. LEGEND SEE RESPECTIVE SHEETS FOR EXTENT OF DEMOLITION WORK ASSOCIATED WITH THOSE TRADES. TO BE REMOVED V3 INTERIOR CEILING VIEW SCALE: 3/16" - 1'-0" INTERIOR CEILING VIEW SCALE: 1/8" - 1'-D" REVISIONS BID SET Cl 2023 Midwestern Engineers. fnc. 802 West Broadway S1reet P.O. Box 295 Loogootee, [ndiana 47553 DATE V1 EXTERIOR ROOF VIEW SCALE: 51/256" - 1 '-D" NOV. 2023 DESIGN T.M.K. DRAWN T.M.K. a.c. CHECK PROJECT NUMBER 2017043-01 D1 .05 14 OF 47 DEMOLITION ROOF PLAN I FllE NUMBER 43657 I Do Not Use Plan Previews for Take Off
Made with FlippingBook
RkJQdWJsaXNoZXIy NjAyODM2