Midwestern Engineers, Inc. Plan Preview

PLANT #1 SCADA SYSTEM NOTES 1. CONTRACTOR SHALL UTILIZE OWNERS EXISTING SCAOA SYSTEM INTEGRATOR FOR IMPROVEMENTS AS SHOWN AND SPECIFIEO CONTACT JEFF BUMGARDNER w/ MAXIM AUTOMATION AT (317) 418-9560. A. THE FOLLOWING MODIFICATIONS TO THE CONTROL PANEL ARE REQUIRED AND PEERLESS MIDWEST WILL PROVIDE LABOR AND MATERIALS AS REQUIREO, • UPOATED SCHEMATICS FOR NEW WELL • PLC PROGRAM DOCUMENTATION MODIFIED AS REQUIRED • ADDITIONAL ANALOG INPUTS PROVIDED FOR MONITORING CHLORINE FREE AND TOTAL VALUES (HACH INSTRUMENTATION PROVIDED BY OTHERS) • AIMING ANTENNA AND CONFIRMING STABLE RADIO SIGNAL TO WELL 3. • PROVIDE NEW PRESSURE SENSOR FOR LOCAL PRESSURE • PROGRAM THE PROCESSORS AT THE 3 ASREC WELLS FOR LOCAL PRESSURE SETPOINTS IN THE EVENT THAT THE PRESSURE GOES LOW IN A WELLHOUSE AND THERE IS A COMMUNICATION FAILURE WITH THE OTHER WELLS AT ASREC, THE WELLS WILL START INDEPENDENT OF A CALL FROM MASTER CONTROL AND WILL OPERATE IN CONSTANT PRESSURE MODE UNTIL THE COMMUNICATION / PROCESSOR ISSUE IS RESOLVED. • AN ABB VFD WILL BE PROVIDED BY OTHERS AT WELL 4 AND PMI WILL PLAN TO COMMUNICATE TO IT VIA ETHERNET 1/P. WIRING BY OTHERS. • PMI WILL NOT BE RESPONSIBLE FOR ANY CONDUIT OR WIRING REQUIRED FOR THIS PROJECT WE WILL ASSIST IN LANDING WIRES IN OUR CONTROL PANEL IF REQUIRED. 2. RTU INPUTS/OUTPUTS DIGITAL INPUTS, AUTOMATIC TRANSFER SWITCH POSITION - NORMAL/EMERGENCY AUTOMATIC TRANSFER SWITCH - NORMAL SOURCE AVAILABLE WELL #1 RUN STATUS (ON/OFF) WELL #1 RUN STATUS (ALARM) WELL #2 RUN STATUS (ON/OFF) WELL #2 RUN STATUS (ALARM) WELL #3 RUN STATUS (ON/OFF) WELL #3 RUN STATUS (ALARM) TANK #3 ALTITUDE/FILL VALVE STATUS (OPEN/CLOSED) SODIUM PERMANGANATE PUMP #1 - FAULT PHOSPHATE PUMP #1 - FAULT FLUORIDE PUMP #1 - FAULT CHLORINE ROOM GAS DETECTION AERALATER #1 BLOWER RUN STATUS (ON/OFF) AERALATER #1 BLOWER RUN STATUS (ALARM) LOW SUCTION CUTOUT SWITCH #1 AERALATER FILTER INLET VALVE #1 STATUS - OPEN AERALATER FILTER INLET VALVE #1 STATUS - CLOSED AERALATER FILTER INLET VALVE #2 STATUS - OPEN AERALATER FILTER INLET VALVE #2 STATUS - CLOSED AERALATER FILTER INLET VALVE #3 STATUS - OPEN AERALATER FILTER INLET VALVE #3 STATUS - CLOSED AERALATER FILTER INLET VALVE #4 STATUS - OPEN AERALATER FILTER INLET VALVE #4 STATUS - CLOSED AERALATER BACKWASH VALVE #1 STATUS - OPEN AERALATER BACKWASH VALVE #1 STATUS - CLOSEO AERALATER BACKWASH VALVE #2 STATUS - OPEN AERALATER BACKWASH VALVE #2 STATUS - CLOSEO AERALATER BACKWASH VALVE #3 STATUS - OPEN AERALATER BACKWASH VALVE #3 STATUS - CLOSEO AERALATER BACKWASH VALVE #4 STATUS - OPEN AERALATER BACKWASH VALVE #4 STATUS - CLOSED INTRUSION ALARM DIGITAL OUTPUTS, WELL #1 RUN COMMAND WELL #2 RUN COMMAND WELL #3 RUN COMMAND TANK #3 ALTITUDE/FILL VALVE CLOSE COMMAND AERALATER #1 BLOWER RUN COMMAND AERALATER FILTER INLET VALVE #1 CLOSE COMMAND AERALATER FILTER INLET VALVE #2 CLOSE COMMAND AERALATER FILTER INLET VALVE #3 CLOSE COMMAND AERALATER FILTER INLET VALVE #4 CLOSE COMMAND AERALATER BACKWASH VALVE #1 OPEN COMMAND AERALATER BACKWASH VALVE #2 OPEN COMMAND AERALATER BACKWASH VALVE #3 OPEN COMMAND AERALATER BACKWASH VALVE #4 OPEN COMMAND CHLORINE PRE-FILTER SOLENOID VALVE OPEN COMMAND CHLORINE POST-FILTER SOLENOID VALVE OPEN COMMAND GAS DETECTION ALARM LIGHT GAS DETECTION HORN ANALOG INPUTS, TANK #3 PRESSURE RAW FLOW METER #1 - INSTANTANEOUS FLOW FINISHED WATER METER #1 - INSTANTANEOUS FLOW DETENTION TANK #1 LEVEL WTP #1 PRE-FILTER CHLORINE INJECTOR - SPEEO REFERENCE WTP #1 POST-FILTER CHLORINE INJECTOR - SPEEO REFERENCE FREE CHLORINE RESIDUAL VIA ANALYZER CHLORINE SCALE #1 CHLORINE SCALE #2 SODIUM PERMANGANATE PUMP #1 - SPEEO REFERENCE PHOSPHATE PUMP #1 - SPEEO REFERENCE FLUORIDE PUMP #1 - SPEED REFERENCE ANALOG OUTPUTS, VIA INTERPOSING RELAY NORMALLY OPEN NORMALLY OPEN NORMALLY OPEN NORMALLY OPEN NORMALLY CLOSEO NORMALLY CLOSEO NORMALLY CLOSEO NORMALLY CLOSED WTP #1 PRE-FILTER CHLORINE INJECTOR - PACING SIGNAL WTP #1 POST-FILTER CHLORINE INJECTOR - PACING SIGNAL SODIUM PERMANGANATE PUMP #1 - PACING SIGNAL PHOSPHATE PUMP #1 - PACING SIGNAL INTERLOCKED w/ WELLS; PACED OFF RAW FLOW INTERLOCKED w/ H.S. PUMPS; PACED OFF FINISHED FLOW INJECTED PER-FILTER; PACED OFF RAW FLOW; INTERLOCKED w/ WELLS FLUORIDE PUMP #1 - PACING SIGNAL INTERLOCKED w/ H.S. PUMPS; INJECTED POST-FILTER AND PRE-H.S. PUMPS; PACED OFF FINISHED FLOW INTERLOCKED w/ H.S. PUMPS; INJECTED POST-FILTER AND PRE-H.S. PUMPS; PACED OFF FINISHED FLOW ETHERNET H.S. PUMP #1 VFD H.S. PUMP #2 VFD STANDBY GENERATOR PLANT #2 PLC CELLULAR, TANK #1 TANK #2 FIBER, BACKWASH PUMP CONTROL PANEL 3. SCADA INTEGRATOR WILL PROVIDE NEMA 12 CONTROL PANEL FOR INSTALLATION BY CONTRACTOR. INTEGRATOR WILL PROVIDE TERMINATION SERVICE OF WIRE BROUGHT INTO PANEL BY OTHERS. ALL EXTERNAL WIRE, CONDUIT, INSTRUMENTATION AND DEVICES TO BE BY CONTRACTOR 4. ANALOG SIGNALS SHOWN SHALL BE TWISTED SHIELDED PAIR, BELDEN OR EQUAL UNLESS OTHERWISE COORDINATED WITH INTEGRATOR. SEPARATE ALL DIGITAL AND ANALOG INTO ISOLATED CONDUITS. 5. DIGITAL SIGNALS SHOWN SHALL BE MIN. 14 GA, WIRE, THHW OR EQUAL UNLESS OTHERWISE COORDINATED WITH INTEGRATOR. SEPARATE ALL DIGITAL AND ANALOG INTO ISOLATED CONDUITS. REFERENCE 1/0 LIST ABOVE FOR MORE INFORMATION. WTP #1 INSTRUMENTATION SCHEDULE T ype Description Device DIGITAL LOW SUCTION CUTOUT SWITCH #1 SWITCH ANALOG DETENTION TANK #1 LEVEL TRANSDUCER ANALOG RAW WATER FLOW METER #1 MAG ANALOG FINISHED WATER FLOW METER #1 MAG ANALOG CHLORINE/FLUORIDE ANALYZER DEPLOX 400M ANALOG DISCHARGE PRESSURE TRANSDUCER PLANT #2 SCADA SYSTEM NOTES 1. CONTRACTOR SHALL UTILIZE OWNERS EXISTING SCADA SYSTEM INTEGRATOR FOR IMPROVEMENTS AS SHOWN AND SPECIFIED CONTACT JEFF BUMGARDNER w/ MAXIM AUTOMATION AT (317) 418-9560. A THE FOLLOWING MODIFICATIONS TO THE CONTROL PANEL ARE REQUIRED AND PEERLESS MIDWEST WILL PROVIDE LABOR AND MATERIALS AS REQUIRED, UPDATED SCHEMATICS FOR NEW WELL • PLC PROGRAM DOCUMENTATION MODIFIED AS REQUIRED • ADDITIONAL ANALOG INPUTS PROVIDED FOR MONITORING CHLORINE FREE AND TOTAL VALUES (HACH INSTRUMENTATION PROVIDED BY OTHERS) • AIMING ANTENNA AND CONFIRMING STABLE RADIO SIGNAL TO WELL 3. • PROVIDE NEW PRESSURE SENSOR FOR LOCAL PRESSURE PROGRAM THE PROCESSORS AT THE 3 ASREC WELLS FOR LOCAL PRESSURE SETPOINTS IN THE EVENT THAT THE PRESSURE GOES LOW IN A WELLHOUSE AND THERE IS A COMMUNICATION FAILURE WITH THE OTHER WELLS AT ASREC, THE WELLS WILL START INDEPENDENT OF A CALL FROM MASTER CONTROL AND WILL OPERATE IN CONSTANT PRESSURE MODE UNTIL THE COMMUNICATION / PROCESSOR ISSUE IS RESOLVED. AN ABB VFD WILL BE PROVIDED BY OTHERS AT WELL 4 AND PMI WILL PLAN TO COMMUNICATE TO IT VIA ETHERNET 1/P. WIRING BY OTHERS. • PMI WILL NOT BE RESPONSIBLE FOR ANY CONDUIT OR WIRING REQUIRED FOR THIS PROJECT. WE WILL ASSIST IN LANDING WIRES IN OUR CONTROL PANEL IF REQUIRED 2. RTU INPUTS/OUTPUTS DIGITAL INPUTS, WELL #4 RUN STATUS (ON/OFF) WELL #4 RUN STATUS (ALARM) WELL #5 RUN STATUS (ON/OFF) WELL #5 RUN STATUS (ALARM) SODIUM PERMANGANATE PUMP #2 FAULT PHOSPHATE PUMP #2 - FAULT FLUORIDE PUMP #2 - FAULT AERALATER #2 BLOWER RUN STATUS (ON/OFF) AERALATER #2 BLOWER RUN STATUS (ALARM) LOW SUCTION CUTOUT SWITCH #2 AERALATER FILTER INLET VALVE #1 STATUS - OPEN AERALATER FILTER INLET VALVE #1 STATUS - CLOSED AERALATER FILTER INLET VALVE #2 STATUS - OPEN AERALATER FILTER INLET VALVE #2 STATUS - CLOSED AERALATER FILTER INLET VALVE #3 STATUS - OPEN AERALATER FILTER INLET VALVE #3 STATUS - CLOSED AERALATER FILTER INLET VALVE #4 STATUS - OPEN AERALATER FILTER INLET VALVE #4 STATUS - CLOSED AERALATER BACKWASH VALVE #1 STATUS - OPEN AERALATER BACKWASH VALVE #1 STATUS - CLOSED AERALATER BACKWASH VALVE #2 STATUS - OPEN AERALATER BACKWASH VALVE #2 STATUS - CLOSED AERALATER BACKWASH VALVE #3 STATUS - OPEN AERALATER BACKWASH VALVE #3 STATUS - CLOSED AERALATER BACKWASH VALVE #4 STATUS - OPEN AERALATER BACKWASH VALVE #4 STATUS - CLOSED INTRUSION ALARM DIGITAL OUTPUTS, WELL #4 RUN COMMAND WELL #5 RUN COMMAND AERALATER #2 BLOWER RUN COMMAND AERALATER FILTER INLET VALVE #1 CLOSE COMMAND AERALATER FILTER INLET VALVE #2 CLOSE COMMAND AERALATER FILTER INLET VALVE #3 CLOSE COMMAND AERALATER FILTER INLET VALVE #4 CLOSE COMMAND AERALATER BACKWASH VALVE #1 OPEN COMMAND AERALATER BACKWASH VALVE #2 OPEN COMMAND AERALATER BACKWASH VALVE #3 OPEN COMMAND AERALATER BACKWASH VALVE #4 OPEN COMMAND CHLORINE PRE-FILTER SOLENOID VALVE OPEN COMMAND CHLORINE POST-FILTER SOLENOID VALVE OPEN COMMAND ANALOG INPUTS, DISCHARGE PRESSURE RAW WATER FLOW METER #2 - INSTANTANEOUS FLOW FINISHED WATER METER #2 - INSTANTANEOUS FLOW DETENTION TANK #2 LEVEL SODIUM PERMANGANATE BULK TANK LEVEL SODIUM PERMANGANATE DAY TANK LEVEL FLUORIDE BULK TANK LEVEL PHOSPHATE BULK TANK LEVEL PHOSPHATE DAY TANK LEVEL WTP #2 PRE-FILTER CHLORINE INJECTOR - SPEED REFERENCE WTP #2 POST-FILTER CHLORINE INJECTOR - SPEED REFERENCE SODIUM PERMANGANATE PUMP #2 - SPEED REFERENCE PHOSPHATE PUMP #2 - SPEED REFERENCE FLUORIDE PUMP #2 - SPEED REFERENCE ANALOG OUTPUTS, WTP #2 PRE-FILTER CHLORINE INJECTOR - PACING SIGNAL WTP #2 POST-FILTER CHLORINE INJECTOR - PACING SIGNAL SODIUM PERMANGANATE PUMP #2 - PACING SIGNAL PHOSPHATE PUMP #2 - PACING SIGNAL FLUORIDE PUMP #2 - PACING SIGNAL ETHERNET, H.S. PUMP #3 VFD H.S. PUMP #4 VFD PLANT #1 PLC CELLULAR, TANK #1 TANK #2 VIA INTERPOSING RELAY NORMALLY OPEN NORMALLY OPEN NORMALLY OPEN NORMALLY OPEN NORMALLY CLOSED NORMALLY CLOSED NORMALLY CLOSED NORMALLY CLOSED TRANSDUCER TRANSDUCER ULTRASONIC SCALE ULTRASONIC ULTRASONIC SCALE INTERLOCKED w/ WELLS PUMPS; PACED OFF RAW FLOW INTERLOCKED w/ H.S. PUMPS; PACED OFF FINISHED FLOW INJECTED PRE-FILTER; PACED OFF RAW FLOW; INTERLOCKED w/ WELLS INTERLOCKED w/ H.S. PUMPS; INJECTED POST-FILTER AND PRE-H.S. PUMPS; PACED OFF FINISHED FLOW INTERLOCKED w/ H.S. PUMPS; INJECTED POST-FILTER AND PRE-H.S. PUMPS; PACED OFF FINISHED FLOW 3. SCADA INTEGRATOR WILL PROVIDE NEMA 12 CONTROL PANEL FOR INSTALLATION BY CONTRACTOR. INTEGRATOR WILL PROVIDE TERMINATION SERVICE OF WIRE BROUGHT INTO PANEL BY OTHERS. ALL EXTERNAL WIRE, CONDUIT, INSTRUMENTATION AND DEVICES TO BE BY CONTRACTOR. 4. ANALOG SIGNALS SHOWN SHALL BE TWISTED SHIELDED PAIR, BELDEN OR EQUAL UNLESS OTHERWISE COORDINATED WITH INTEGRATOR. SEPARATE ALL DIGITAL AND ANALOG INTO ISOLATED CONDUITS. 5. DIGITAL SIGNALS SHOWN SHALL BE MIN. 14 GA. WIRE, THHW OR EQUAL UNLESS OTHERWISE COORDINATED WITH INTEGRATOR. SEPARATE ALL DIGITAL AND ANALOG INTO ISOLATED CONDUITS. REFERENCE 1/0 LIST ABOVE FOR MORE INFORMATION. WTP #2 INSTRUMENTATION SCHEDULE Type Description Device DIGI TAL LOW SUCTION CUTOUT SWITCH #2 SWITCH ANA LOG DETENTION TANK #2 LEVEL TRANSDUCER ANALOG SODIUM PERMANGANATE BULK TANK LEVEL ULTRASONIC ANALOG SODIUM PERMANGANATE DAY TANK LEVEL SCALE ANALOG FLUORIDE BULK TANK LEVEL ULTRASONIC ANALOG PHOSPHATE BULK TANK LEVEL ULTRASONIC ANALOG PHOSPHATE DAY TANK LEVEL SCALE ANALOG RAW WATER FLOW METER #2 MAG ANALOG FINISHED WATER FLOW METER #2 MAG ANALOG DISCHARGE PRESSURE TRANSDUCER BACKWASH PUMP CONTROL PANEL SCADA SYSTEM NOTES 1. CONTRACTOR SHALL UTILIZE OWNERS EXISTING SCADA SYSTEM INTEGRATOR FOR IMPROVEMENTS AS SHOWN AND SPECIFIED CONTACT JEFF BUMGARDNER w/ MAXIM AUTOMATION AT (317) 418-9560. A. THE FOLLOWING MODIFICATIONS TO THE CONTROL PANEL ARE REQUIRED AND PEERLESS MIDWEST WILL PROVIDE LABOR AND MATERIALS AS REQUIRED, • UPDATED SCHEMATICS FOR NEW WELL • PLC PROGRAM DOCUMENTATION MODIFIED AS REQUIRED , ADDITIONAL ANALOG INPUTS PROVIDED FOR MONITORING CHLORINE FREE AND TOTAL VALUES (HACH INSTRUMENTATION PROVIDED BY OTHERS) • AIMING ANTENNA AND CONFIRMING STABLE RADIO SIGNAL TO WELL 3. • PROVIDE NEW PRESSURE SENSOR FOR LOCAL PRESSURE , PROGRAM THE PROCESSORS AT THE 3 ASREC WELLS FOR LOCAL PRESSURE SETPOINTS IN THE EVENT THAT THE PRESSURE GOES LOW IN A WELLHOUSE AND THERE IS A COMMUNICATION FAILURE WITH THE OTHER WELLS AT ASREC, THE WELLS WILL START INDEPENDENT OF A CALL FROM MASTER CONTROL AND WILL OPERATE IN CONSTANT PRESSURE MODE UNTIL THE COMMUNICATION / PROCESSOR ISSUE IS RESOLVED. , AN ABB VFD WILL BE PROVIDED BY OTHERS AT WELL 4 AND PMI WILL PLAN TO COMMUNICATE TO IT VIA ETHERNET 1/P. WIRING BY OTHERS. , PMI WILL NOT BE RESPONSIBLE FOR ANY CONDUIT OR WIRING REQUIRED FOR THIS PROJECT. WE WILL ASSIST IN LANDING WIRES IN OUR CONTROL PANEL IF REQUIRED. 2. RTU INPUTS/OUTPUTS DIGITAL INPUTS, BACKWASH PUMP #1 RUN STATUS (ON/OFF) BACKWASH PUMP #1 RUN STATUS (ALARM) BACKWASH PUMP #2 RUN STATUS (ON/OFF) BACKWASH PUMP #2 RUN STATUS (ALARM) BACKWASH PUMP WETWELL - OFF BACKWASH PUMP WETWELL - LEAD ON BACKWASH PUMP WETWELL - LAG ON BACKWASH PUMP WETWELL - HIGH LEVEL ALARM ANALOG INPUTS, BACKWASH TANK LEVEL #1 BACKWASH TANK LEVEL #2 BACKWASH TANK LEVEL #3 FIBER, WTP #1 PLC FLOAT FLOAT FLOAT FLOAT RADAR RADAR RADAR 3. SCADA INTEGRATOR WILL PROVIDE NEMA 4X S.S. CONTROL PANEL FOR INSTALLATION BY CONTRACTOR. INTEGRATOR WILL PROVIDE TERMINATION SERVICE OF WIRE BROUGHT INTO PANEL BY OTHERS. ALL EXTERNAL WIRE, CONDUIT, INSTRUMENTATION AND DEVICES TO BE BY CONTRACTOR. 4. ANALOG SIGNALS SHOWN SHALL BE TWISTED SHIELDED PAIR, BELDEN OR EQUAL UNLESS OTHERWISE COORDINATED WITH INTEGRATOR. SEPARATE ALL DIGITAL AND ANALOG INTO ISOLATED CONDUITS. 5. DIGITAL SIGNALS SHOWN SHALL BE MIN. 14 GA. WIRE, THHW OR EQUAL UNLESS OTHERWISE COORDINATED WITH INTEGRATOR. SEPARATE ALL DIGITAL AND ANALOG INTO ISOLATED CONDUITS. REFERENCE 1/0 LIST ABOVE FOR MORE INFORMATION. BACKWASH PUMP CONTROL PANEL INSTRUMENTATION SCHEDULE T ype Description Device DIGI TAL BACKWASH PUMP WETWELL - OFF FLOAT DIGI TAL BACKWASH PUMP WETWELL - LEAD ON FLOAT DIGI TAL BACKWASH PUMP WETWELL LAG ON FLOAT DIGI TAL BACKWASH PUMP WETWELL - HIGH LEVEL FLOAT ANALOG BACKWASH TANK LEVEL #1 RADAR ANALOG BACKWASH TANK LEVEL #2 RADAR ANALOG BACKWASH TANK LEVEL #3 RADAR • � REVISIONS 11/8/23 BID SET (0 2023 Midwestern Engineers, lnt. 802 West BroJdway Street P.O. Box 295 Loogootee, Indiana 47553 DATE NOVEMBER 2023 DESIGN A.F.B. DRAWN C.N.M. Q.C. CHECK J.W.W. PROJECT NUMBER 2017043-01 E1 .05 41 OF 47 I FILE NUMBER I 43630 Do Not Use Plan Previews for Take Off

RkJQdWJsaXNoZXIy NjAyODM2