Midwestern Engineers, Inc. Plan Preview

GENERAL PLUMBING NOTES 1. ALL PLUMBING SYSTEMS TO BE INSTALLED TO MEET THE REQUIREMENTS OF THE INDIANA PLUMBING CODE, 2012 (INTERNATIONAL PLUMBING CODE, 2006 WITH INDIANA AMENDMENTS). 2. WORK INCLUDES FURNISHING ALL LABOR, MATERIALS, APPLIANCES, EQUIPMENT, TOOLS, TRANSPORTATION, SUPERINTENDENCE, CLEAN-UP, ANO SERVICES REQUIRED TO CONSTRUCT AND INSTALL A COMPLETE FULLY OPERATIVE PLUMBING SYSTEM FOR THE PROJECT. 3. ALL NEW WORK IS DRAWN DARK. ALL ITEMS DRAWN LIGHT ARE EXISTING. EXISTING ITEMS SHALL REMAIN UNLESS SPECIFICALLY NOTED OTHERWISE. 4. CONTRACTORS SHALL PROTECT ALL EXISTING OWNER FACILITIES DURING CONSTRUCTION. ANY ITEM DAMAGED OR DISCONNECTED BY CONTRACTOR OPERATIONS SHALL BE FULLY RESTORED TO PREVIOUS OPERATING AND APPEARANCE CONDITION. PROVIDE PLATING AS REQUIRED TO PROTECT SURFACE OF EXISTING PARKING LOT INCLUDING UNDER WHEELS OF DUMPSTER, LIFTING DEVICES AND OTHER EQUIPMENT THAT COULD SINK INTO ASPHALT. 5. CONTRACTOR SHALL COORDINATE WORK WITH ALL OTHER TRADES AND STRUCTURAL CONDITIONS PRIOR TO INSTALLATION. CONTACT ENGINEER WITH CONFLICTS OR DISCREPANCIES. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR CORE DRILLING, SAW CUTTING, ANO DRILLING HOLES THRU WALLS AND FLOORS AS REQUIRED TO INSTALL NEW PIPING WHETHER SHOWN OR NOT. 7. ALL PENETRATIONS THRU RATED CONSTRUCTION TO BE FIRE STOPPED. 8. UNLESS OTHERWISE NOTED, INTERIOR DRAINAGE PIPING SHALL BE INSTALLED AT ) b " PER FOOT SLOPE. 9. PIPE ROUTINGS SHOWN ON DRAWINGS ARE DIAGRAMMATIC AND ARE A SUGGESTED METHOD FOR DESIGN. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL COORDINATION, LAYOUT, AND CODE COMPLIANCE. 10. SCALES INDICATED ARE FOR ARCHITECTURAL REFERENCE ONLY. DO NOT SCALE DRAWINGS. IT IS NOT INTENDED THAT THE DRAWINGS SHOW EVERY PIPE, FITTING, SUPPORTS, ETC., ANO IT IS UNDERSTOOD THAT THE DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES WILL PERMIT, THE PROPER INSTALLATION ACCORDING TO THE TRUE INTENT AND MEANING OF THE DRAWINGS, LOCAL CODES AND STANDARD PRACTICES SHALL BE PROVIDED. 11. ALL FLOOR MOUNTED EQUIPMENT SHALL BE MOUNTED ON A CONCRETE HOUSEKEEPING PAD. 12. CONTRACTOR SHALL FIELD VERIFY EXISTING PIPE AND EQUIPMENT SIZES, LOCATIONS, ELEVATIONS, MATERIALS, ETC. BEFORE BIDDING OR BEGINNING WORK. 13. CONTRACTOR SHALL COORDINATE SHUT DOWN OF ANY MECHANICAL SYSTEM WITH THE OWNER, OCCUPANTS OF THE AFFECTED AREA, AND ANY OTHER AUTHORITY HAVING JURISDICTION. 14. REMOVE ALL PIPING, VALVES, EQUIPMENT, ETC. MADE OBSOLETE AS A RESULT OF NEW CONSTRUCTION. 15. THOROUGHLY REVIEW ALL DRAWINGS PRIOR TO ANY DEMOLITION WORK. ANY DEVICES REMOVED ACCIDENTALLY WILL BE REPLACED AT NO ADDITIONAL COST TO OWNER. 16. DISPOSAL OF DEMOLISHED MATERIALS SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS. 17. EXISTING BELOW SLAB PIPING SHOWN ON THIS PLAN HAS BEEN DRAWN FROM AS-BUILT DOCUMENTS, FIELD SURVEYS, AND OTHER AVAILABLE SOURCES. CONTRACTOR MUST USE THESE DOCUMENTS AS A GUIDE TO COMPLETE WORK SHOWN HEREIN AND INCLUDE IN THEIR BUDGET COSTS FOR MINOR FIELD DEVIATIONS. WHERE MAJOR DEVIATIONS ARE EXPOSED (WHERE THE INTENT OF WORK CANNOT BE COMPLETED AS SHOWN), CONTRACTOR SHALL STOP WORK IN THE EFFECTED AREA AND NOTIFY ENGINEER OF DISCREPANCY. 18. FURNISH ALL CERTIFICATES OF APPROVALS BY THE PLUMBING INSPECTOR AND BOARD OF HEALTH. 19. MAINTAIN A MINIMUM CLEARANCE OF THREE FEET IN FRONT OF ELECTRICAL PANELS AND ONE FOOT EITHER SIDE WITH PIPE. 20. INCLUDE IN BID, ALL LICENSE, PERMIT, INSPECTION ANO OTHER FEES REQUIRED TO COMPLETE WORK. 21. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT AND OTHER DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS. PLUMBING FIXTURE SCHEDULE PLAN NOTES REDUCED PRESSURE - -1----11 BACKFLOW PREVENTER (RPZ-1) WC-1 AMERICAN STANDARD - HIGH EFFICIENCY TOILET CHAMPION PRO 211AA.104, OR EQUAL BY ZURN VITREOUS CHINA, 1.28gpf (i) CONNECT 2" COLD WATER TO 8" FINISHED WATER MAIN. INSTALL w/ MAIN DOMESTIC WATER SHUTOFF VALVE. 161," ADA RIM HEIGHT LAV-1 AMERICAN STANDARD - LAVATORY LUCERNE 0355.012, OR EQUAL BY ZURN 21),'\18Y.", WALL HUNG, VITREOUS CHINA, FRONT OVERFLOW CHICAGO FAUCETS 802-VE2805ABCP F0-1 JAY R. SMITH - FLOOR DRAIN MOOEL# 2041S, OR EQUAL BY ZURN TRAP w/ FLOOR CLEANOUT ADJUSTABLE STRAINER HEAD & SECURED GRATE HB-1 WOODFORD - BACKFLOW PROTECTED WALL FAUCET MODEL# 826, OR EQUAL BY JAY R. SMITH OR ZURN METAL WHEEL HANDLE SS-1 GUARDIAN - SAFETY STATION w/ EYEWASH SS-2 MODEL# G1950, STAINLESS STEEL BOWL OR EQUAL BY HAWS, BRADLEY GUARDIAN - SAFETY SHOWER AND EYEWASH MODEL# GFR1205SSH, FREEZE RESISTANT EMERGENCY SHOWER, OR EQUAL BY HAWS, BRADLEY. HORIZONTALLY MOUNTED, STAINLESS STEEL SHOWER HEAD MODEL# GFR1814, FREEZE RESISTANT EYEWASH WALL MOUNTED, STAINLESS STEEL BOWL 0 0 0 0 0 0 0 0 @) @ l," COLD WATER, 1)','' TEMPERED WATER. %" COLD WATER. J," COLO WATER, 1)," WASTE, 1!," VENT. INSTALL WATER HEATER (WH-1) UNDER LAVATORY (SHOWN OFFSET FOR CLARITY). 3" VENT THRU ROOF. J," COLD WATER, 2" VENT. REFER TO DRAWING C104 FOR CONTINUATION OF 4" SANITARY PIPING. INSTALL PIPE SLEEVE THRU FOUNDATION WALL. %" COMPRESSED AIR DOWN TO CONTROL VALVE HEADER. PROVIDE LOW POINT DRAIN AND CAP. MAKE FINAL CONNECTION TO AERALATER CONTROL VALVE WITH COMPRESSED AIR TUBING & SHUTOFF VALVE PER MANUFACTURERS REQUIREMENTS (TYPICAL OF 8). 6. PUMP ROOM ' i ! 6" 151-+- le C D D D D � CHLORINE ROOM 0 0 ,,. .. I \ \ ' .. I I I I I I I / ./ '' Jl - / HYD-1 �-t,� I I 2 .. - - / ,' � / I / - / lo " 14 i+I"'>-'----- - � - .'.i___ - K , - , , 1 �- -- f - / ' - -I I � "'!j\; HB-1 '"'Q l"' "' �,- -� '-'� - � f--+-+� 6" I ill" o fl I a· AERALATER ROOM #1 J 0 A� \� I @+-.ij 00 " 4 ' @ss :: 1 FD-1 ,, IT}-l--+---1�" CJHl----1 " <7>--+ l -1)," <D-4"(EX) - / - ' / ' / ' ' I \ I \ I \I ENTRY/ LAB ' / \ I \ I \ I \I ,;, ./ / SK-1 EXISTING LAB SINK COUNTERTOP - EXISTING TO REMAIN MIXING FAUCET - T&S BRASS MODEL# BL-5725-09 OR EQUAL BY ZURN SAMPLE FAUCET - T&S BRASS MODEL# 8-0700 OR EQUAL BY ZURN @ CONNECT 1)\" COLO WATER TO 6" FINISHED WATER MAIN. INSTALL w/ MAIN DOMESTIC WATER SHUTOFF VALVE. @) 8 @ INSTALL OWNER FURNISHED WATER METER PER UTILITY COMPANY STANDARDS. 4" SANITARY WASTE. CUT AND PATCH FLOOR TO MATCH EXISTING. �r· � . I , , ,, / , ,... �nil 1 1.1.2J l�- - -- >--<-, -- -:- A,:= ========-'. A -- -&- - - ---jr-,;=;; t S�� WH-1 CHRONOMITE - ELECTRIC TANKLESS POINT OF USE WATER HEATER MODEL# CM-20L/208 OR EQUAL BY EEMAX 208V-10, 4160W WH-2 LAWLER - EMERGENCY TEMPERING SYSTEM FOR EMERGENCY SHOWER AND EYEWASH MODEL# 911E ETS ENG. No. 87200 OR ENGINEER APPROVED EQUAL 120V-10, 20A, 118 GALLON STORAGE TANK RPZ-1 WATTS - REDUCED PRESSURE BACKF L OW PREVENTER MODEL# LF909-QT-S-FS-1", OR EQUAL BY WILKINS, AMES, FEBCO 15 GPM AT 14 PSI PRESSURE DROP MOOEL# 909AG-C AIR GAP ASSEMBLY RPZ-2 WATTS - REDUCED PRESSURE BACKFLOW PREVENTER MODEL# LF909M1-QT-S-FS-1J," OR EQUAL BY WILKINS, AMES, FEBCO 40 GPM AT 11 PSI PRESSURE DROP MODEL# 909AG-F AIR GAP ASSEMBLY AC-1 QUINCY - AIR COMPRESSOR MODEL# QTS5QCB OR ENGINEER APPROVED EQUAL 480V-30. 2HP, 7.9 CFM @ 90 PSI U-BELT DRIVE, BELT GUARD, INLET FILTER/SILENCER w/ SPARE CARTRIDGE, AUTO ADJUSTABLE PRESSURE SWITCHES, ASME SAFETY RELIEF VALVE, IN-TANK CHECK VALVE, MANUAL TANK DRAIN, VIBRATION ISOLATION PADS, SINGLE SUPPLY ALTERNATOR/STARTER PANEL IN NEMA 1 ENCLOSURE MODEL# QTD-115-1ZOV AUTO TANK DRAIN MODEL# QPF-50-5 MICRON PARTICULATE FILTER w/ SPARE CARTRIDGE, 50 CFM @ 100 PSI AD-1 QUINCY - AIR DRYER MODEL# QPNC-21 OR ENGINEER APPROVED EQUAL 120V-10, 21 CFM @ 100 PSI NON-CYCLING REFRIGERATED AIR-COOLED DRYER @ l," PLANT NO. 1 ANO PLANT NO. 2 DOMESTIC WATER SUPPLIES DOWN. MAKE FINAL CONNECTIONS TO CHLORINE INJECTORS PER MANUFACTURERS REQUIREMENTS. REFER TO DRAWING M1.01 FOR ADDITIONAL INFORMATION. INSTALL PRESSURE TRANSDUCER FITIING IN DUCTILE IRON TEE. REFER TO DRAWING E1.04 FOR ADDITIONAL INFORMATION. @ l," DOMESTIC WATER DOWN TO FLUORIDE SYSTEM WATER SOFTENER. REFER TO DRAWING M1.07 FOR ADDITIONAL INFORMATION. @ JET CLEAN ALL EXISTING UNDER FLOOR SANITARY WASTE PIPING. VERIFY PIPE INTEGRITY w/ SEWER CAMERA AFTER CLEANING PROCESS. @ %" DOMESTIC WATER DOWN TO PERMANGANATE FEED SYSTEM. REFER TO DRAWING M1.07 FOR ADDITIONAL INFORMATION. EXISTING UNDER-COUNTER WATER HEATER, THERMOSTATIC MIXING VALVE, AND EYEWASH TO REMAIN. REMOVE ANO REPLACE SINK FAUCET & SAMPLE FAUCET. @ %" COLD WATER, %" SAMPLE LINE DOWN. CONNECT TO EXISTING PENETRATIONS THRU WALL. @ CONNECT %" SAMPLE LINE TO EXISTING PENETRATION THRU FLOOR. \ \ RESTROOM V WC-1 ] � 2" 4" """ 7 %" 4" SANITARY INV�394.00 CLEANOUT INV�392.00 !," <( <( <( M >--++-AIR COMPRESSOR (AC-1) AIR DRYER (AD-1) AERALATER ROOM #2 WTP PLUMBING PLAN SCALE, %" - 1 '-0" %" � I -- 1"---+-<D 1 ), " f "' REDUCED PRESSURE BACKFLOW PREVENTER (RPZ-2) WATER HEATER fD\ (WH-2) � REVISIONS 11/8/23 BID SET C 2023 Mirlwe�tern Engineers. Inc. 802 West BroJdwuy Street P.O. Box295 Ulo,'oocee. Jndi:,rn,47553 DATE NOVEMBER 2023 DESIGN A.F.B. DRAWN C.N.M. Q.C. CHECK J.W.W. PROJECT NUMBER 2017043-01 P1 .01 46 OF 47 I FILE NUMBER I 43625 Do Not Use Plan Previews for Take Off

RkJQdWJsaXNoZXIy NjAyODM2