Midwestern Engineers, Inc. Plan Preview
< w w z < r, z 0 0 w w 0 0 g z ro' � I <> u i �?j '9��1 iffi� Q -.....,:.:::� � -{& � s •• • "Ci UJ --� 5: � t-Q ::E �8 wz z -, -□ •• 2Y CN l' 5 S ro<c GENERAL ELECTRICAL NOTES 1. ALL WORK SHALL COMPLY WITH INDIANA ELECTRICAL CODE, CURRENT EDITION. 2. PROVIDE ALUMINUM UNI-STRUT AND ACCESSORIES AS REQUIRED TO MOUNT ELECTRICAL EQUIPMENT. ALL HARDWARE SHALL BE STAINLESS STEEL. 3. ALL EXPOSED CONDUITS SHALL BE ALUMINUM, SCH. 80 PVC IF BURIED. TYPICALLY USE LONG SWEEP ELBOWS, MIN. 24" COVER. 4. ALL OUTDOOR ENCLOSURES SHALL BE NEMA 4X STAINLESS STEEL AND HAVE HASP AND STAPLE FOR PADLOCK UNLESS OTHERWISE NOTED. 5. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONDUIT, WIRING, OTHER MATERIAL, AND INSTALLATION NEEDED FOR A COMPLETE SYSTEM UNLESS OTHERWISE NOTED. COORDINATE ALL ROUGH IN REQUIREMENTS w/ TANK CONTRACTOR PRIOR TO CONSTRUCTION. 6. CONDUITS SHOWN ON PLAN ARE FOR REFERENCE ONLY AND ARE NOT NECESSARILY INTENDED TO INDICATE EXACT QUANTITY OR LOCATION. SEPARATE ALL POWER AND CONTROL; SEPARATE ALL DIGITAL, ANALOG, COAX, FIBER OR ETHERNET. 7. CONTRACTOR TO UTILIZE DONNIE QUALKENBUSH AT DEQ, INC. FOR ALL ELECTRICAL SCOPE IN THIS PROJECT BY CALLING 812-525-8358 FOR PRICING PRIOR TO BID. NEW PANEL A CIRCUIT NO. 1 EX. LOAD 3 EX. LOAD 5 EX. LOAD 7 EX. LOAD 100 AMPERES 120/208 VOLTS ' 4WIRE ITEM FEED 9 SCADA PANEL 11 SPACE 13 SPACE 15 SPACE Ml OMAIN CONNECTION .'i PHASE KAIC WIRE AMPS POLE cu. SIZE BUS 12 20 1 A 12 20 1 B 12 20 1 C 12 20 1 A 12 20 1 B C A B POLE 2 1 1 1 1 1 1 EXIST l�G BU!K WATE8 SURFACE MOUNTING S.E.L. AMPS WIRE SIZE 20 12 EX. LOAD 20 12 EX. LOAD 20 12 EX. LOAD 20 12 SPACE 20 12 SPACE 20 12 SPACE 20 12 SPACE lOADING STATION LOCATION ITEM FEED CIRCUIT NO. 4 6 8 10 12 14 16 NOTE: UPDATE PANEL SCHEDULE TYPED AND LAMINATED AT COMPLETION OF PROJECT NOTE: CONTRACTOR TO REMOVE EXISTING OIL SEAL AND PRESSURE SENSING ASSEMBLY AT EXISTING TANK 2 NEAR SCHOOL, MODIFY AS SHOWN IN THIS DETAIL TO ELIMINATE OIL SEAL. 2 PART INSULATION PLUG, 1B"ox41. EQUAL TO INFACT SUBMERSIBLE PRESSURE TRANSDUCER---1-l--n EXISTING LID TO REMAIN CONTRACTOR TO MODIFY----l AND CLEAN EXISTING SCADA PANEL AS REQUIRED. ADD PRECISION DIGITAL TANK LEVEL READOUT SIMILAR TO TANK 1. \--!+---MANUFACTURER FURNISHED CABLE, CONTINUOUS LENGTH (NO SPLICES) PRESSURE GAUGE EQUAL--tf-0<=8=c:C:i=+f.t---BLEED VALVE TO ASHCROFT 1009 ¾" BALL VALVE EQUAL----tr7ri TO NIBCO T-585-80-LF !---EXISTING METER CROCK TO REMAIN K.-1---EXISTING CONDUIT TO SCADA PANEL TO REMAIN ft=======:::; lEXISTING SENSING LINE TO REMAIN SCADA CONTROL PANEL EXISTING NEMA 4X S.S. 100,000 GALLON WATER STORAGE TANK SCADA NOTES 1. CONTRACTOR SHALL UTILIZE OWNER'S EXISTING SCADA SYSTEM INTEGRATOR AND ELECTRICIAN. CONTACT DONNIE QUALKENBUSH w/ D.E.Q., INC. AT 812-525-8358 TO PROVIDE POWER DISTRIBUTION AND SCADA PRICING PRIOR TO BID. RE-USE EXISTING TANK #1 EQUIPMENT FOR SCADA PANEL AT PROPOSED ELEVATED WATER STORAGE TANK w/ THE FOLLOWING FEATURES: A. ZETRON 1716 B. ANTENNA, TOWER, AND MAST WITH ALIGNMENT C. LIGHTNING ARRESTOR (BOTH AC AND COAX) D. RADIO E. OPTO ISOLATION FOR BOTH INPUTS AND OUTPUTS F. POWER SUPPLY G. POWER FAIL RELAY H. BATTERY BACK-UP WITH 7 AMP HR. BATTERY I. THERMOSTATICALLY CONTROLLED HUMIDITY/CONDENSATION HEATER J. PRECISION DIGITAL TANK LEVEL INDICATION READOUT MODEL #PD765-6X210 K. AMBIENT TEMPERATURE SENSOR L. NEMA 4 PAINTED STEEL ENCLOSURE 2. RTU INPUTS/OUTPUTS DIGITAL INPUTS: RTU POWER FAIL COMMUNICATION STATUS SITE POWER FAIL INTRUSION ALARM ANALOG INPUT: TANK LEVEL AMBIENT TEMPERATURE ANALOG OUTPUT: TANK LEVEL 3. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, WIRING AND PROGRAMMING TO ACCOMMODATE THE NEW TANK 1/0 AS NEEDED FOR A FULLY FUNCTIONING SYSTEM. 4. ANTENNA LOCATIONS SHOWN ON PLANS ARE FOR INFORMATIVE PURPOSES ONLY. IT IS THE CONTRACTORS RESPONSIBILITY TO MOUNT ANTENNA PER PATH STUDY REQUIREMENTS TO ENSURE COMMUNICATION TO WATER PLANT. 5. COORDINATE TAP REQUIREMENTS FOR PRESSURE TRANSDUCER DURING CONSTRUCTION. 6. CONTRACTOR TO PROVIDE AND INSTALL INTRUSION ALARM IN BULK LOADING STATION, WIRED TO SCADA. PROGRAM WATER PLANT MCU TO ONLY ALARM OUTSIDE BUSINESS HOURS PER OWNERS DIRECTION. 7. CONTRACTOR TO PROVIDE AND INSTALL AMBIENT TEMPERATURE SENSOR TO MONITOR BULK LOADING TEMPERATURE. PROGRAM WATER PLANT MCU TO ALARM BELOW ADJUSTABLE SETPOINT FOR FREEZE PROTECTION. 18"x18"x6" CONCRETE PAD FINISHED GRADE PROPOSED SCADA PANEL CONTROL WIRE IN CONDUIT TO SCADA PER 1/0 LIST PROVIDE AND INSTALL DOOR CONTACT OR LIMIT SWITCH FOR INTRUSION ALARM 1----MANUFACTURER FURNISHED CABLE IN CONDUIT, CONTINUOUS LENGTH (NO SPLICES) SUBMERSIBLE PRESSURE______,_., TRANSDUCER I PRESSURE GAUGE EQUAL---{ TO ASHCROFT 1009 :::C��---¾" MIP BRASS SMOOTH NOSE SAMPLE FAUCET, LEGEND VALVE ¾" BALL VALVE EQUAL- ----1',..; TO NIBCO T-585-80-LF T-532NL- ¾" FORD TYPE PS-LID (INSIDE BUILDING) 2" COMPACTED---'c�'j ,-,,. �� SAND STRAIN RELIEF PER MANUFACTURERS RECOMMENDATIONS FORD FB1000-3-NL CORPORATION STOP u--- -8" WATER MAIN PER PLANS FORD B44-333-Q-NL CURB STOP w/ EA2-40-40-30R BOX • "'.- CONTINUOUS LENGTH (NO JOINTS) ¾" CTS HOPE PRESSURE SENSING TUBING ASTM 02737, AWWA C901, NSF 14/61, 250PSI PRESSURE RATING W/ TRACER WIRE TANK 2- SENSING LINE REPAIR/ REPLACEMENT PRESSURE SENSING / SAMPLE LINE TAP DETAIL NOT TO SCALE ESSURE SENSING LINE TAPPED MAIN w/ SHUT OFF VALVE AT NSDUCER AND LOCAL GAUGE - ..; 1;.� ---- - f� " - - - - �2 l '. .:;>,-< EXIS OUND � ·1:i: • E �CTRl c;__ _ s ��;,.. TO REMA! � - - -- 7 2 EXISTING POWER POLE BY DUKE ENERGY TO REMAIN 1- a 0 NEW TANK No. 1 100,000 GALLON ELEVATED WATER STORAGE TANK PROPOSED CURB STOP NOTE: CONTRACTOR TO UTILIZE DONNIE QUALKENBUSH AT DEO, INC. FOR ALL POWER AND CONTROLS FOR THIS PROJECT BY CALLING (812) 525-8358 FOR PRICING PRIOR TO BID. rEX . a- WATER '------w----•�· T,-------,--wJ----� t .__ _ /11"c "' o" NT " R " A " CT " O " R ;--sc T0 ,;-- �-�7 , .- I - - EX . r ..... COORDINATE FENCE POST LOCATIONS WITH NEW MAINS , ' EX . r S11. N 14th Street BLACKTOP PROPOSED ELECTRICAL SITE PLAN SCALE: 1" = 20' NOT TO SCALE CONNECTIONS TO 8" WATER MAIN AND SENSING LINE SHALL BE PROVIDED AND INSTALLED BY CONTRACTOR 1 " SCH. 80 PVC w/ TESCO LMR 40 CABLE OR EQUAL EXISTING BULK WATER LOADING STATION TO REMAIN EXISTING POWER POLE BY---JI DUKE ENERGY TO REMAIN ! RELOCATE EXISTING ANTENNA, VERIFY DIRECTION AND MOUNTING HEIGHT PRIOR TO INSTALLATION I ) ) ir--- -BOND ANTENNA TO �-�----------< 1 GROUNDING ELECTRODE PROPOSED CURB STOP A-9 PANEL NEMA 4 J0"x.30"xs· GRAVEL FLOOR I [ I _J ¾" PRESSURE SENSING LINE TAPPED TO MAIN w/ SHUT OFF VALVE AT TRANSDUCER AND LOCAL GAUGE INSTALL UNDER CONCRETE FOUNDATION CONDUCTOR EXISTING 100A POWER DISTRIBUTON PANEL "A" TO REMAIN --------EXISTING METER TO REMAIN SEE DETAIL THIS SHEET FOR MORE INFORMATION EXISTING 120 240V-1o OVERHEAD SERVICE BY DUKE ENERGY PROPOSED "100,000 GALLON WATER STORAGE TANK ELECTRICAL RISER NOT TO SCALE • u ;:: 1--( REVISIONS 1/8/24 BID SET 0 2023 Midwes!�m Engineers. Inc. 802 \Vesl Broadway S1ree1 P.O. Box 295 Loogootee. Indium, 47553 DATE JANUARY 2024 DESIGN A.F.B. DRAWN C.N.M. Q.C. CHECK R.D.W. PROJECT NUMBER 2023108-00 8 8 OF 8 FILE NUMBER 53830 Do Not Use Plan Previews for Take Off
Made with FlippingBook
RkJQdWJsaXNoZXIy NjAyODM2