8 I I \ 81 r/, I \ \ \ \ ' ' I I \ \ \ \ \ I I '- / \ ADE E ASIN g 6 N 0 + � N NO WORK TO BE DONE BELOW THE TOP OF BANK -- ../,....,_ ___ ...... __ ------ -------------- ---- I I I I --- • 0 0 Ni, N I / / I ,· / 0 0 + C') I /, -------- - -------- I ? ( I / / ( I I I ( / I ' \ ( \ I / "" "" r " - / I I I I I I I I \ t , I I I I ! \ I I / 8' + <D N I I I \ \ I • • \ \ ' \ \ I I \ I I I \ \ \ \ \ I I I I I I I \ I I =-11' 453 - � CL I \ / I I \ ' I I .... \ I I I , \ \ \ PLAN No. 1 / / / / PLAN No. 2 EROSION CONTROL NOTES: 1. ALL DETAILS AND PRACTICE STANDARDS ARE SHOWN IN THE MOST CURRENT EDITION OF THE INDIANA STORM WATER QUALITY MANUAL. CONTRACTOR MUST OBTAIN A COPY OF THIS HANDBOOK FROM THE FOLLOWING WEBSITE WWWIDEM.IN.GOV/STORMWATER OR CONTACT IDEM DIRECTLY 2. PRIOR TO PLAN APPROVAL, A PRECONSTRUCTION MEETING WILL BE REQUIRED TO BE HELO WITH SWPPP REVIEWER, PLAN DESIGNER, AND PROJECT OWNER TO DISCUSS SWPPP SUBMITTAL, PROJECT SCHEDULE AND INSPECTIONS. A PRELIMINARY INSPECTION WILL BE SCHEDULED WITH PJKE COUNTY SOIL AND WATER CONSERVATION DISTRICT WHEN INITIAL INSTALLATION OF SWPPP BMP'S ARE INSTALLED. A FINAL INSPECTION WILL BE SCHEDULED WHEN 70% GROWTH !S ESTABLISHED AND BEFORE FlLING OF THE NOTICE OF TERMINATION (NOT). INTERIM INSPECTIONS MAY OCCUR DURING CONSTRUCTION 3. CONSTRUCT TEMPORARY GRAVEL CONSTR ENTRANCE / EXIT PAD BEFORE COMMENCING CONSTRUCTION 4. ALL DISTURBED AREAS TO HAVE SEEDING, FERTILIZER AND MULCHING UPON COMPLETION OF FINAL GRADING. 5. PRIOR TO INITIATING ANY LAND-DISTURBING ACTIVITIES, A REPRESENTATIVE FOR THE PROJECT SHOULD WALK THE SITE WITH CONSTRUCTION PLANS IN HAND AND MARK THE LIMITS OF CONSTRUCTION THAT WERE ESTABLISHED DURING THE PLANNING PHASES AREAS TO BE PROTECTED SHOULD BE MARKED WITH ROPE, SAFETY FENCING (COMMONLY ORANGE COLORED) OR SURVEYOR FLAGS SIGNAGE CAN ALSO BE USED TO IDENTIFY AND EXPLAIN LIMITS OF CONSTRUCTION AND AREAS THAT ARE TO BE PROTECTED FROM CONSTRUCTION ACTIVITIES 6. PROTECT ALL DROP INLETS DURING CONSTRUCTION WITH FABRIC DROP INLET OR GRAVEL OR STRAW BALE PROTECTION THE POLLUTION PREVENTION PLANS ARE GENERAL GUIDELINES FOR THE CONTRACTOR TO FOLLOW THE CONTRACTOR IS STILL REQUIRED TO KEEP ALL SEDIMENT OFF PUBLIC ROADS AND MUST FOLLOW ALL OTHER GUIDELINES AS SPECIFIED IN THE INDIANA HANDBOOK. PROVIDE A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT PAD AS SPECIFIED IN THE INDIANA STORM WATER QUALITY MANUAL 7. IF ANY EROSION CONTROL MEASURE IS NOT SUFFICIENT THE CONTRACTOR SHALL ADD ADDITIONAL CONTROL MEASURES AND THEN MODIFY THE PLAN TO INCLUDE THOSE MEASURES. 8. PROTECT ALL INLETS IN PAVED ROADWAYS WITH BAGS FILLED WITH GRAVEL OR AGGREGATE AND PLACED AROUND A STORM DRAIN CURB INLET. PLACE A TRAFFIC BARRICADE AT EACH INSTALLED MEASURE FOR SAFETY AND TO PROTECT MEASURE INTEGRITY. 9. SILT FENCE MAY BE REQUIRED AT LOCATIONS OTHER THAN THOSE INDICATED ON THIS PLAN THE CONTRACTOR SHALL INSTALL SUCH FILTERS AS NEEDED TO INSURE THAT RUNOFF FROM DISTURBED AREAS DOES NOT LEAVE THE SITE WITHOUT BEING TREATED. 10. TOPSOIL SHALL BE STOCKPILED AND STRATEGICALLY LOCATED THROUGHOUT THE SITE SILT FENCE SHALL BE TEMPORARILY INSTALLED AROUND ALL STOCKPILES TO PREVENT RUNOFF. 11. BULK CLEARING OF SEDIMENT FROM PAVEMENT BY FLUSHING WITH WATER SHALL "NOT" BE PERMITTED. 12. ALL UNVEGETATED AREA LEFT INACTIVE FOR SEVEN (7) DAYS DR MORE SHALL BE TEMPORARILY OR PERMANENTLY STABILIZED WITH MEASURES APPROPRIATE FOR SEASON TO MINIMIZE EROSION POTENTIAL. 13 ANY IMPROVEMENTS TO EXISTING SWALES OR DITCHES SHALL NOT IMPEDE PREVIOUS FLOW CONDITIONS. 14. ALL EROSION CONTROL MEASURES ARE TO BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND GUIDELINES 15 DUMPSTERS MUST BE KEPT COVERED. 16 PROVIDE BOTH A FILTER BAG IN THE INLET AND A FILTER SOCK AROUND THE INLET FOR TEMPORARY INLET PROTECTION SEE DETAILS ON SHEET 26 LEGEND -@- CONSTRUCTION LIMIT -• - SILT FENCE :::J TEMPORERY INLET & OUTLET PROTECTION FS; FAIRCLOTH SKIMMER ['.,·", C:j TEMPORARY CHECK DAM e.�:1:-· )� EROSION CONTROL BLANKET ED ENERGY DISSIPATER EiJ PORTABLE LATRINE [QI CONSTRUCTION DUMPSTER □CONCRETE WASH BASIN �;! STOCK PILE WITH \..:.-' PERIMETER SILT FENCE � STORM WATER LEAVING SITE 'l!I RIPRAP OUTLET PROTECTION EROSION CONTROL PLAN st 0 st z ...J 00 � :g I- «i >- 0 0:: z UJ > 1oz u <( rn o:: - C) 0 u ...J REVlSI0NS 03/14/2025 BID SET C 2025 Midwestern E11gi11L-ers. Inc. 802 Wes! Brc,adway Stnoc! P.O. Box 295 Loogoole<!. Indian:< 47553 DATE MARCH 2025 DESIGN C.W.R. !. B.D.H. DRAWN M.M.C.i'.M.K.W. Q.C. CHECK R.A.B. PROJECT NUMBER 2024079-00 23 23 OF 29 I FILE NUMBER I 44587 Do Not Use Plan Previews for Take Off
RkJQdWJsaXNoZXIy NjAyODM2