Welcome to the MEI Plan Room

If there is any problem with this site, please contact Matt Clarke by email or by telephone at 812-295-2800.

Job Name:
Job Desc:
MEI Project No.: 2023067, 2023-1 CCMG Division I - Street and Sidewalk Improvements Along Oakey Avenue from Nowlin Avenue to Ridge Avenue, Division II - Crack Sealing Along Various Streets

The project consists of two divisions:

  1. Division I – Street and Sidewalk Improvements along Oakey Avenue from Nowlin Avenue to Ridge Avenue which includes milling and resurfacing of the street along with replacement of storm sewer inlets, areas of full depth patching, replacement of curb and gutter, replacement of sidewalk and curb ramps, placement of new curb, and striping of the roadway. Milling will occur down to existing concrete which is estimated to be 1.5” to 2” below the existing asphalt surface. A mandatory alternate for placement of pavement geotextile which includes an asphalt leveling course and 2” of HMA surface course is also included; and
  1. Division II - Crack Sealing of various streets including:
    1. Tanner Avenue from Diehl Drive to Park Street
    2. Sheldon Street from Probasco Street to Tebbs Avenue
    3. Miller Avenue from Haag Avenue to Cora Avenue
    4. Billups Street from Sheldon Street to Dead End
    5. Heck Drive from Parkside Avenue to Parkgrove Avenue
    6. Diehl Drive from Nead Lane to Nowlin Avenue
    7. Nead Lane from Probasco Street to Diehl Drive
    8. Warren Place from Tebbs Avenue to Cook Avenue
    9. Gunkle Place from Tebbs Avenue to Cook Avenue
    10. Cook Avenue from Tanner Avenue to Ridge Avenue
    11. Ludlow Street from Probasco Street to Dead End
    12. Hayes Street from Probasco Street to Dead End
    13. Parkgrove Avenue from Nowlin Avenue to Heck Drive
    14. Beckett Landing Drive from Dead End to Miller Avenue
    15. Maire Street from Cora Avenue to Schnebelt Street
    16. Cora Avenue from Carrol Avenue to Nowlin Avenue
    17. Locust Street from Dead End to Birch Street
    18. Broadway Street from Ludlow Street to Ridge Avenue
    19. Poplar Street from Nowlin Avenue to Birch Street
    20. Tanners Creek Lane from Dead End to Beckett Landing Drive
    21. Carrol Avenue from Miller Avenue to Dead End
    22. Arthur Street from Carrol Avenue to Nowlin Avenue
    23. Schnebelt Street from Carrol Avenue to Nowlin Avenue

 

 
 
Contact: Clint W. Roos, P.E. Created: Jun 27, 2023
Company: City of Greendale Bid Due: Jul 24, 2023
File nameFile Size
Previews for this bidset are not currently available.
Notice to Bidders.pdf194 KB
Addendum #1.pdf589 KB
Addendum 2.pdf303 KB
Bid Tab.pdf383 KB
Specs.pdf4 MB

Follow Midwestern Engineers on Twitter

Plan Holders List
City of Greendale
MEI Project No.: 2023067, 2023-1 CCMG Division I - Street and Sidewalk Improvements Along Oakey Avenue from Nowlin Avenue to Ridge Avenue, Division II - Crack Sealing Along Various Streets

Sealed Bids are invited and may be delivered or forwarded by certified mail, addressed to the City of Greendale located at 500 Ridge Avenue, Greendale, IN, 47025 until 4:00 P.M.  Local Time (Eastern Time) on July 24th, 2023.  If bids are forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed to the Owner at 510 Ridge Avenue, Greendale, IN, 47025.  Bids received after such hour will be returned unopened and not considered.   Bids received prior to this time shall be opened and publicly read at the Board of Works public meeting scheduled to take place on July 24th, 2023 @ 5:00 P.M.  Local Time (Eastern Time) at the City of Greendale located at 500 Ridge Avenue, Greendale, IN, 47025.  Each bid must be enclosed in a sealed envelope bearing the title of the Project and the name and address of Bidder. 

A non-mandatory, pre-bid phone conference will be held at 1:00 P.M. Local Time (EST) on July 10th, 2023 by calling 1-317-939-6562, using the password 856760866#, and meeting ID 856 760 866#. All prime contractors, subcontractors, small, minority or women owned enterprises and other interested parties are invited to attend.

 

Paul H. Rohe Co., Inc.
110 Forest Avenue
Aurora, IN 47001
Phone: 812.202.2607
Fax:
All Star Paving, Inc.
PO Box 1109
Seymour, IN 47274
Phone: 8125224477
Fax: 8125224472


,
Phone:
Fax:
Russell Standard
639B STATE ROUTE 821
MARIETTA, OH 45750-5304
Phone: 7403744253
Fax:
Adleta Construction
389 S Wayne Ave
Cincinnati, OH 45215
Phone: 5133094628
Fax:
Scodeller Construction Inc.
7475 Montgomery Drive
Plain City, OH 43064
Phone: 6145429288
Fax:
Dave O'Mara Contractor, Inc.
1100 East O&M Ave.
North Vernon, IN 47265
Phone: 812.352.6554
Fax: 812.346.6305