Project Date: | 10/28/2022 | Date Due: | 11/21/2022 | Company: | City of Jasper | Bid Notice: | Notice to Bidders.pdf | Awarded To: | Mitchell & Stark Const. Co., Inc. |
Project Description:
The project consists of:
-
Rehabilitation of the existing secondary clarifiers and replacement of the carriage assembly on the existing mechanical bar screen.
Project Date: | 12/21/2022 | Date Due: | 01/17/2023 | Company: | Town of Patriot/Patriot Municipal Utilities | Bid Notice: | Notice to Bidders.pdf | Awarded To: | Mike Holman Excavating, Inc. |
Project Description:
Division I of the project consists of:
-
Installation of approximately 580 L.F. of 12-inch water main and appurtenances
-
Retirement in place of existing water main
Division II of the project consists of:
-
Installation of approximately 590 L.F. of 6-inch water main and appurtenances
-
Retirement in place of existing sewer main
Project Description:
The project consists of:
Low Waste Ion Exchange Treatment Addition.
Project Date: | 01/12/2023 | Date Due: | 02/01/2023 | Company: | Springs Valley Water District | Bid Notice: | Notice to Bidders.pdf | Awarded To: | Love Excavating |
Project Description:
The project consists of:
-
Approx. 1,890 L.F. of 6” water main replacement along Circle Drive, Sunny Acres Drive, and Clay Street, service meter reconnections and relocations, and associated valves, hydrants, and other appurtenances.
-
Approx. 6,260 L.F. of 8” water main replacement along S.R. 56 and Airport Road with two state highway bores with welded steel casing and carrier pipe, service meter reconnections and relocations, uncased bores, and associated valves, hydrants, and other appurtenances.
-
Approx. 290 L.F. of 6” water main replacement along Emerald Drive as Mandatory Alternate No. 1 which also includes service meter reconnections and relocations, and associated valves, hydrants, and other appurtenances.
Project Date: | 02/02/2023 | Date Due: | 02/20/2023 | Company: | French Lick Redevelopment Commission | Bid Notice: | Notice to Bidders.pdf |
Project Description:
The project consists of:
2023 Street Improvements.
-
Ohio Street: From Jefferson Street to Washington Street
|
Approx. 190 L.F. of Milling and Resurfacing. An alternate will be considered for full depth replacement of the street.
|
-
Short Street: From Louise Street to College Avenue
|
Approx. 710 L.F. of Milling and Resurfacing. An alternate will be considered for full depth replacement of the street.
|
-
Oak Street: From Walnut Street to Summit Street
|
Approx. 250 L.F. of Milling and Resurfacing. An alternate will be considered for full depth replacement of the street.
|
-
Cross Street: From Maple Street to Indiana Avenue
|
Approx. 220 L.F. of Milling and Resurfacing. An alternate will be considered for full depth replacement of the street.
|
Project Date: | 01/26/2023 | Date Due: | 02/28/2023 | Company: | Town of Dale | Bid Notice: | Notice to Bidders.pdf | Awarded To: | J. H. Rudolph & Co., Inc. |
Project Description:
The project consists of:
Street Improvements.
-
Dunn Street: From Oak St. to Medcalf St./S.R. 62
|
Approx. 1,130 L.F. of Milling, Resurfacing, Sidewalk and Stormwater Infrastructure
|
-
Oak Street: From Dunn St. to Wallace St.
|
Approx. 1,030 L.F. of Milling and Resurfacing
|
-
Walnut Street: From Brown Ave. to Medcalf St./S.R. 62
|
Approx. 2,320 L.F. of Milling and Resurfacing
|
-
Conner Court: From N. Washington St. to End
|
Approx. 305 L.F. of Milling and Resurfacing
|
-
Main Street: From Vine St. to Medcalf St./S.R. 62
|
Approx. 785 L.F. of Milling and Resurfacing
|
-
Short Street: From Washington St. to Linwood St.
|
Approx. 885 L.F. of Milling and Resurfacing
|
-
C.R. 305 E.: From Medcalf St./ S.R. 62 to End
|
Approx. 530 L.F. of Milling and Resurfacing
|
Project Description:
The project consists of:
Sidewalk, Water and Stormwater Improvements.
-
Washington Street: New Sidewalk, Water Main, and Stormwater Infrastructure on the east side of the street from Maple Street to Dollar General
|
-
Approx. 170 square yards of new concrete sidewalk and new curb ramp.
-
Approx. 400 L.F. of new 12” and 15” storm sewer pipe and slotted drain along with manholes, inlets and other appurtenances.
-
Approx. 600 L.F. of 6” PVC SDR-21 water main, valves, hydrants, service line, and other appurtenances.
|
Project Date: | 01/25/2023 | Date Due: | 03/01/2023 | Company: | Town of Roachdale | Bid Notice: | Notice to Bidders.pdf | Awarded To: | DC Construction |
Project Description:
The project consists of:
Street and Sidewalk Improvements.
-
East Street: From E. Forest Home St. (IN 236) to E. Washington St.
|
Approx. 837 L.F. of Milling and Resurfacing
|
-
Main Street: From E. Forest Home St. (IN 236 to E. Railroad St.
|
Approx. 1,200 L.F. of Milling and Resurfacing and Curb Ramps
|
-
West Street: From W. Railroad St. to W. Washington St.
|
Approx. 336 L.F. of Milling and Resurfacing
|
-
W. Railroad St.: From Rush St. to Spring St.
From West St. to Rush St.
|
Approx. 553 L.F. of Milling and Resurfacing
|
-
Indiana Street: From Westview Dr. to City Limit
|
Approx. 985 L.F. of Milling and Resurfacing
|
-
Indiana Street: From Central Avenue to Curve
|
Approx. 162 L.F. Full Depth Pavement Patching
|
Project Description:
The project consists of:
Street and Sidewalk Improvements.
-
N. Teke Burton Drive: From SR 57 to Main Street
|
Approx. 4,980 L.F. of Milling and Resurfacing
|
-
Main Street: From N. Teke Burton Drive to 14th Street
|
Approx. 450 L.F. of Milling and Resurfacing and Replacement of Curb Ramps
|
Project Date: | 02/08/2023 | Date Due: | 03/02/2023 | Company: | Town of Corydon | Bid Notice: | Notice to Bidders.pdf | Awarded To: | C & R Construction |
Project Description:
The project consists of:
-
Installation of Approximately 1,150 L.F. of 4”, 6” and 12” PVC or D.I. Water Main and Appurtenances.
-
Connections to Existing Water Mains.
-
Installation of Approximately 950 L.F. of ¾” or 1” HDPE Service Lines.
-
Replacement of Existing Customer Meter Pits.
-
Cutting/Capping and Retiring In Place Existing Water Mains.
-
Pressure/Leakage Testing and Disinfection of New Water Mains.
Project Description:
The project consists of:
Street and Sidewalk Improvements.
-
October Street: From Greenbriar Rd to November St.
|
Approx. 1,360 L.F. of Milling, Resurfacing, Replacement of Curbs and Driveways
|
-
November Street: From Greenbriar Rd. to October St.
|
Approx. 1,387 L.F. of Milling, Resurfacing, Replacement of Curbs and Driveways
|
-
Sharp Street: From November St. to Dead End
|
Approx. 594 L.F. of Milling, Resurfacing, Replacement of Curbs and Driveways
|
-
Glad Street: From November St. to Dead End
|
Approx. 610 L.F. of Milling, Resurfacing, Replacement of Curbs and Driveways
|
Project Date: | 02/08/2023 | Date Due: | 03/13/2023 | Company: | Patoka Lake Regional Water & Sewer District | Bid Notice: | Notice to Bidders.pdf |
Project Description:
The project consists of:
-
Base Bid for construction of a new 1,000,000 US gal elevated water storage tank (overflow elevation - 1000.0 feet msl; height to overflow – 117.5 feet above finished floor elevation, 118.0 feet above finished grade elevation) via a composite concrete pedestal/glass-fused-to-steel bolted steel bowl tank and all necessary and specified appurtenances
-
Mandatory Alternate Bid for construction of a new 1,000,000 US gal elevated water storage tank (overflow elevation - 1000.0 feet msl; height to overflow – 117.5 feet above finished floor elevation, 118.0 feet above finished grade elevation) via a composite concrete pedestal/welded steel bowl tank with coatings system and all necessary and specified appurtenances
-
Site piping inclusive of 16-inch ductile iron inlet/outlet pipe, fire-hydrant, and 15-inch PVC overflow system
Project Description:
The Project includes the construction of approximately 1,600 lineal feet of 6-inch water main, fittings, fire hydrants and appurtenances. Water main to be installed by horizontal directional drilling.
Project Description:
The project consists of:
Wastewater Collection Facilities – Walnut Street Sewer Main Extension
-
Approx. 870 L.F. of new 8” gravity sewer main, 5 new manholes, new service laterals, and all associated appurtenances
Project Description:
The project consists of:
The Code Enforcement Building Improvements Project consists of demolition work, drive and parking lot replacement, retaining wall construction, trench drain, storm sewer inlets and pipe, and sidewalk construction.
|