If there is any problem with this site, please contact Matt Clarke by email or by telephone at 812-295-2800.
|
Project Description:
The project consists of:
Water System Improvements Division III – New S.R. 550 Booster Station and Scenic Hill Booster Station
Project Date: | 06/09/2025 | Date Due: | 07/14/2025 | Company: | Southern Monroe Water Authority | Bid Notice: | Notice to Bidders.pdf | Awarded To: | Mike Holman Excavating, Inc. |
Project Description:
Water Distribution System Improvements Pointe Reinforcement Booster Station No. 3
The project consists of:
-
Site clearing, grading, and access drive for new booster station.
-
Concrete foundation and site electrical work for EFI booster station and pad mount generator (Station provided by Owner).
-
Installing EFI Booster Station (Station provided by Owner) and pad mount generator and making electrical and water connections to booster station and generator.
-
Installation of approximately 1,700 L.F. of 12” and 8” water main with valves, hydrants and appurtenances.
-
Installation of approximately 80 L.F. of 16” welded steel casing by auger bore or pipe jacking with restrained joint carrier pipe.
-
Points of connection to existing water mains of various size.
Project Date: | 06/18/2025 | Date Due: | 07/14/2025 | Company: | Town of Santa Claus | Bid Notice: | Notice to Bidders.pdf | Awarded To: | Knies Construction Inc./Calcar Paving, Inc. |
Project Description:
Lincoln Discovery Trail NLT 4-04, Grant No. 81858
The project consists of:
-
Approximately 3,365 lineal feet of new asphalt trail, a new 40 foot long Pratt Style Pedestrian Bridge, and appurtenances from Lincoln Boyhood National Park to cross Heritage Hills High School property. The project is partially funded by the Next Level Trails program.
Project Date: | 06/18/2025 | Date Due: | 07/15/2025 | Company: | City of Boonville | Bid Notice: | Notice to Bidders.pdf | Awarded To: | JBI Construction, Inc. |
Project Description:
Pedestrian Facility Improvements Along Locust Street - Phase II
The project consists of:
Replacement of existing sidewalk along the north side of Locust Street between McDonalds and Cypress Street as shown on plans and specifications. Additional improvements include a new modular block retaining wall and reconstruction of stairs and driveways along with clearing of the right of way.
Project Description:
Water System Improvements Division I - Replacement of the Existing 50,000 Gallon Elevated Storage Tank With A New 100,000 Gallon Elevated Water Storage Tank
Division I portion of the project consists of:
-
Consists of the construction of a new 100,000 Gallon Elevated Water Storage Tank
-
Demolition of an existing 50,000 Gallon Elevated Water Storage Tank.
Project Description:
Water System Improvements Division II – Water Distribution System Improvements
Division II portion of the project consists of:
-
Consists of the installation of water distribution system improvements, including approximately 160 feet of 12” connection main, approximately 3,260 feet of 6” main, valves and appurtenances.
-
The project also includes service meter replacements and upgrade of meter reading equipment.
Project Description:
Sanitary Sewer System Improvements East Side Sewer – Phase I
Division I – Niehaus Sewer Extension
The Division I portion of the project consists of:
-
Installation of Approximately 3,900 L.F. of 12” Gravity Sewer Main and Appurtenances.
-
Installation of Approximately 520 L.F. of 8” Gravity Sewer Main and Appurtenances
-
Connections to Existing 12” Gravity Sewer Main.
-
Installation of 6” Laterals and Wyes for Future Residential Services
Project Date: | 07/30/2025 | Date Due: | 08/25/2025 | Company: | Patoka Lake Regional Water & Sewer District | Bid Notice: | Notice to Bidders.pdf |
Project Description:
Wastewater Treatment Plant Improvements Administration Building Extension
The project consists of:
-
Administration building extension at Patoka Lake Regional Water & Sewer District Wastewater Treatment Plant (Approx. 750 sq. ft.)
-
Includes demolition, site grading, foundation, building, HVAC, and electrical work
Project Description:
Wastewater System Improvements Field Lift Station Rehabilitation
The project consists of:
-
Field Lift Station Rehabilitation
Project Description:
The Division II portion of the project consists of:
-
Installation of Approximately 3,430 L.F. of 8” Gravity Sewer Main and Appurtenances.
-
Connections to Existing 8” Gravity Sewer Main.
-
Installation of 6” Laterals, Wyes and Clean-Outs for connection to existing residences.
Project Description:
The Division I portion of the project consists of:
-
Installation of approximately 9,150 L.F. of 12” D.I. CL 350 Water Main and Appurtenances
-
Installation of approximately 440 L.F. of 12” D.I. CL 350 Retrained Joint Water Main by Uncased Bore
-
Connections to Existing 12” D.I. Water Mains
-
New Control Valve Pit and Appurtenances
Project Description:
Water System Improvements Project Walnut Street and U.S. 31 South
Distribution System Improvements contract will consist of the replacement of existing water lines with a new 6" water main inside the Town limits. Included will be all connections, service lines, hydrants, valves, appurtenances and surface replacements.
|