Midwestern Engineers, Inc. Plan Preview

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EX. INV. 448.24' W W W W CL CL CL CL CL CL CL E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E 8'' DRN 8'' DRN 8'' DRN 8'' DRN 8'' DRN 8'' DRN 8'' DRN 8'' DRN 8'' DRN 8'' DRN W 8'' DRN 8'' DRN 8'' DRN 8'' DRN 8'' DRN 8'' DRN 8'' DRN E E E E E E E E E E E E E E E E E E E E CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E STATE OF N 19800122 J O H N W . W E T Z E L P R O F E S S I O N A L E N G I N E E R R E G I S T E R E D I N D I A N A o P.O. Box 295 Loogootee, Indiana 47553 Midwestern Engineers, Inc. 802 West Broadway Street Quality Engineering Services Since 1959 802 West Broadway St., P.O. Box 295 Loogootee, IN 47553 Ph: 812-295-2800 6809 Corporate Drive, Indianapolis, IN 46278 Ph: 317-334-0262 Website: midwesterneng.com Email: meinc@midwesterneng.com Fax: 812-295-2801 Consultants Civil Mechanical Electrical Inc. Engineers, Midwestern 2019 9/18/19 BID SET Author: DKOONTZ, Plot Date: 10/14/2019 8:27 AM Path: Z:\CAD_INCOMPLETE\2018022-00_CITY OF HUNTINGBURG_WS_DISTRIBUTION SYSTEM IMPROVEMENTS AND PLANT UPGRADES\025_PRODUCTIONDWG_DIV 2\12 - MASTER MECHANICAL PLANS.DWG WATER SYSTEM IMPROVEMENTS DIV. II - WATER TREATMENT PLANT IMPROVEMENTS FOR THE CITY OF HUNTINGBURG DUBOIS COUNTY, INDIANA BYPASS PIPING KEY 1 12" SERIES 1100 MEGA-LUG 2 12"x12"x12" STAINLESS STEEL TAPPING SLEEVE WITH 12" TAPPING GATE VALVE 3 12" HYDRA-STOP VALVE 4 CUT, CAP AND RETIRE MAIN ON BOTH LIVE AND RETIRED SECTIONS OF PIPE 5 12" D.I. CLASS 350 PIPE WITH POLYETHYLENE ENCASEMENT AND TRACER WIRE 6 12" D.I. 45° ELBOW NEW INTAKE PUMP STATION AND RELOCATED FINISHED WATER SITE PLAN SCALE: 1/8" = 1'-0" C1.02 14 39516 SEE SHEET GC.02 FOR SITE GRADING AND SHEET GC.04 FOR NEW ACCESS DRIVE DETAILS CONSTRUCTION SEQUENCE: 1. INSTALL STAINLESS STEEL TAPPING SLEEVES AND TAPPING GATE VALVE 2. INSTALL THE RELOCATED FINISHED WATER MAIN 3. FILL, FLUSH, PRESSURE TEST AND DISINFECT THE RELOCATED FINISHED WATER MAIN (CONTRACTOR TO PROVIDE TEMPORARY 2" TAP AND FLUSH POINT FOR FILLING AND FLUSHING) 4. INSTALL HYDRA-STOPS AND CUT/CAP/PLUG THE EXISTING FINISHED WATER MAIN 5. INSTALL THE NEW INTAKE PUMP STATION 6. CUT-IN THE NEW CONNECTIONS TO THE EXISTING 18" RAW WATER MAIN 7. COMPLETE START-UP/TESTING AND PLACE NEW INTAKE PUMP STATION INTO SERVICE 8. REMOVE UNUSED PORTION OF THE EXISTING 18" RAW WATER MAIN (SEE SHEET C1.01 FOR DETAILS) SEE SHEET C1.01 FOR NEW INTAKE PUMP STATION DETAILS DIV. III - WTP IMPROVEMENTS SOLAR FIELD ADDITION SEE SHEET GC.04 FOR FENCE DETAILS LEGEND EXISTING PIPING PROPOSED RELOCATED FINISHED WATER LINE 12" FINISHED WATER 8" WATER 18" RAW WATER 8" FORCE MAIN 12" STORM SEWER 8" SANITARY SEWER WET TAP TO EX. 8" WATER MAIN WITH AN 8"x8"x6" STAINLESS STEEL TAPPING SLEEVE AND A 6" TAPPING GATE VALVE. INSTALL 6" ANCHOR COUPLING AND 3-WAY FIRE HYDRANT 2 3 1 5 1 6 5 1 5 4 3 1 6 EX. 12" D.I. FINISHED WATER MAIN SHOWN AS CROSS HATCHED TO BE RETIRED IN PLACE / REMOVED AS NECESSARY. CUT, CAP AND PLUG AS REQUIRED WITH ANY CUT/OPEN ENDS 4 2 5 EXISTING CLEARWELL INSTALL 8" SERVICE SADDLE, 3 4 " CORPORATION STOP AND INSERT STIFFENER 3/4" TYPE K, COPPER WATER SERVICE 3/4" 3/4" INSTALL 3 4 " CORPORATION STOP AND CURB VALVE BOX. SEE DETAIL THIS SHEET REMOVE EX. 8" CMP DRAIN LINE CONNECT TO EX. 8" CMP DRAIN LINE INSTALL FITTINGS AND INSTALL APPROX. 50 L.F. OF NEW 8" CMP MAINTAIN SLOPE FROM CONNECTION POINT TO OUTLET. OUTLET TO DITCH EXISTING POWER AND CONTROL WIRING TO BE PULLED FROM CONDUIT AND EXISTING CONDUIT WILL BE RETIRED IN PLACE. SEE ELECTRICAL SITE PLAN FOR ADDITIONAL INFORMATION. UNKOWN ELEC. LINE SEE SHEET C1.01 FOR DETAILS ON ABANDONING THIS SECTION OF MAIN ONCE INTAKE PUMP STATION BECOMES OPERATIONAL 1 6 STOP/CURB VALVE AND BOX NOT TO SCALE GRADE CAST IRON ADJUSTABLE VALVE BOX SCREW TYPE VALVE BOX VALVE BOX ON FOUR (4) SOLID COMMON BRICKS CONCRETE SUPPORT 3 4 " TYPE K, COPPER WATER SERVICE MIN. 42" NOTE: SEE ELECTRICAL SITE PLAN FOR POWER AND CONTROL RELATED TO PROPOSED PUMP INTAKE PUMP STATION EXISTING UNDERGROUND ELECTRIC PRIMARY SERVICE TO WTP TO REMAIN IN PLACE. CONTRACTOR MUST FIELD LOCATE BY HAND PRIOR TO ANY WORK IN THIS AREA NOTE: PRIOR TO ORDERING ANY MATERIALS FOR RELOCATING THE EXISTING 12" FINISHED WATER MAIN, THE CONTRACTOR SHALL LOCATE/VERIFY EXACT LOCATION AND DEPTH OF BOTH THE FINISHED WATER MAIN AND RAW WATER MAIN IN THIS AREA. Do Not Use Plan Previews for Take Off

RkJQdWJsaXNoZXIy NjAyODM2