Midwestern Engineers, Inc. Plan Preview

GARAGE STORAGE ROOM STORAGE ROOM ENTRY 12" RAW WATER INFLUENT 8" SLUDGE LINE 8" SLUDGE LINE 8" SLUDGE LINE 8" SLUDGE LINE 10" 8" EX. FLOCCULATORS EX. TUBE SETTLER CLARIFIERS - #1 ELEVATOR NPW NaMn04 NaMn04 AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL CS CARBON CARBON CARBON CARBON CARBON CARBON NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW G G G G G NaMn04 NaMn04 NaMn04 AL AL AL CS CS CS 8" EX. FLOCCULATORS EX. TUBE SETTLER CLARIFIERS - #2 PROPOSED FLOCCULATORS PROPOSED TUBE SETTLER CLARIFIERS - #3 PROPOSED FLOCCULATORS PROPOSED TUBE SETTLER CLARIFIERS - #4 2'-0" 2'-0" 2'-0" 2'-0" NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NEW ALUM ROOM ADDITION SALT STORAGE /MIXED OXIDANT DISINFECTANT SYSTEM ROOM MIXED OXIDANT DISINFECTANT ROOM CS CS CS NPW CS NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS CS SL SL SL 8" 10" CS CS CS CS CS CS CS CS CS CS CS CS CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON AL AL AL AL AL AL AL AL AL AL NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 NaMn04 2'-0" 2'-0" 2'-0" 3'-0" STATE OF N 19800122 J O H N W . W E T Z E L P R O F E S S I O N A L E N G I N E E R R E G I S T E R E D I N D I A N A o P.O. Box 295 Loogootee, Indiana 47553 Midwestern Engineers, Inc. 802 West Broadway Street Quality Engineering Services Since 1959 802 West Broadway St., P.O. Box 295 Loogootee, IN 47553 Ph: 812-295-2800 6809 Corporate Drive, Indianapolis, IN 46278 Ph: 317-334-0262 Website: midwesterneng.com Email: meinc@midwesterneng.com Fax: 812-295-2801 Consultants Civil Mechanical Electrical Inc. Engineers, Midwestern 2019 9/18/19 BID SET Author: DKOONTZ, Plot Date: 10/14/2019 8:31 AM Path: Z:\CAD_INCOMPLETE\2018022-00_CITY OF HUNTINGBURG_WS_DISTRIBUTION SYSTEM IMPROVEMENTS AND PLANT UPGRADES\025_PRODUCTIONDWG_DIV 2\12 - MASTER MECHANICAL PLANS.DWG WATER SYSTEM IMPROVEMENTS DIV. II - WATER TREATMENT PLANT IMPROVEMENTS FOR THE CITY OF HUNTINGBURG DUBOIS COUNTY, INDIANA MECHANICAL PIPING FLOOR PLAN - WEST SCALE: 1/4" = 1'-0" C2.01 15 39515 CHEMICAL FEED PIPING LEGEND ALUM CARBON MIXED OXIDANT DISINFECTANT SOLUTION FLUORIDE NON-POTABLE WATER PIPING PAINT IDENTIFICATION COLORS POTASSIUM PERMANGANATE PIPE LABEL REQUIREMENTS PIPE DIAMETER MIN LABEL SIZE MIN. LETTER HEIGHT 0.75" TO 1.25" 1" x 8" 0.5" 1.25" TO 2.5" 1" x 8" 0.75" 2.5" TO 8" 2" x 12" 1.25" 8" TO 10" 3" x 24" 2.5" 10" > 4" x 32" 3.5" PIPE LABELS SHALL BE INSTALLED EVERY 25' TO 50' ALONG STRAIGHT RUNS, AT ALL CHANGES IN DIRECTION ON BOTH SIDES OF THE TURN, AT BOTH SIDES OF ENTRY POINTS THROUGH THE FLOORS AND WALLS, NEXT TO ALL FLANGES AND VALVES AND SHALL INCLUDE FLOW DIRECTION OF CONTENTS. IDENTIFICATION LABELS / TAGS SHALL BE INSTALLED ON ALL TANKS, PUMPS, VALVES, METERS AND EQUIPMENT. NaMn04 SANITARY - DARK GREY RAW WATER - OLIVE GREEN FINISH/POTABLE WATER - DARK BLUE CHLORINE (GAS & SOLUTION) - YELLOW ALUM - ORANGE CARBON - BLACK SODIUM PERMANGANATE - PURPLE SODIUM PERMANGANATE MISC. CHEMICAL PIPING MECHANICAL PIPING KEY 1 8"x8"x8" D.I. FLANGED TEE 2 8" D.I. FLANGED SPOOL (FL.xFL. OR FL.xP.E.) AS REQUIRED 3A 8" GATE VALVE WITH HANDWHEEL 3B REUSE 8" GATE VALVE. REMOVE EXISTING HANDWHEEL OPERATOR AND REPLACE WITH WITH VALVE STEM EXTENDED THROUGH THE FLOOR AND HANDWHEEL 4 8" D.I. 90° FLANGED ELBOW 5 8" ELECTRICALLY ACTUATED DIAPHRAGM VALVE - NORMALLY CLOSED. VALVE SHALL BE POWERED TO OPEN 6 8" RESTRAINED FLANGED COUPLING ADAPTER 7 8" MAG METER WITH TOTALIZER HEAD READOUT MOUNTED DIRECTLY ON METER 1 1 1 2 3A 4 6 5 EXISTING BLOW DOWN VALVE PIT WITH IMPROVEMENTS LEGEND EXISTING PIPING PROPOSED PIPING 1 C2.01 SCALE: 1/4" = 1'-0" INLET PIPING SECTION 1 6 5 FOR EXISTING CLARIFIERS 1-2 1. REMOVE EXISTING FLANGED SPOOL PIECE AND PNEUMATICALLY ACTUATED DIAPHRAGM VALVE 2. INSTALL NEW ELECTRONICALLY ACTUATED DIAPHRAGM VALVE, NEW FLANGED SPOOL PIECE AND NEW RESTRAINED FLANGED COUPLING ADAPTER TO EX. CLARIFIER #2 TO EX. CLARIFIER #1 TO PROPOSED CLARIFIER #3 TO PROPOSED CLARIFIER #4 PHOTOGRAPH OF EXISTING BLOW DOWN VALVE PIT CUT EX. D.I. PIPE AS NECESSARY TO BE REMOVED 2 6 7 2 3A 4 2 6 7 2 2 6 7 2 6 7 2 1 3 2 7 8 3 4 2 7 8 2 7 8 4 FOR PROPOSED CLARIFIERS 3-4 1. REMOVE EXISTING FLANGED SPOOL PIECE AND FLANGED COUPLING ADAPTER 2. CUT EXISTING D.I. PIPE AND REMOVE AS NECESSARY 3. INSTALL NEW ELECTRONICALLY ACTUATED DIAPHRAGM VALVE, FLANGED SPOOL PIECE AND NEW RESTRAINED FLANGED COUPLING ADAPTER TO BE REMOVED PROPOSED EQUIPMENT NOTE: REMOVE EXISTING PIPING IN BLUE SHADED AREA AND REPLACE WITH PROPOSED PIPING INSTALL NEW 2" PVC SCH. 80 NON-POTABLE WATER LINE WITH FOUR (4) 1" HOSE BIBB CONNECTIONS AND SHUT OFF VAVLES (TYP. AT EACH CLARIFIER FOR WASH DOWN PURPOSES) TYPICAL FOR ALL EXISTING AND PROPOSED FLOCCULATOR MOTORS: INSTALL A REMOTE GREASE FITTING KIT AND ALL NECESSARY FITTINGS AND APPURTENANCES FROM EACH BEARING, EACH SIDE WITH HIGH SERVICE TUBING (LENGTH TO BE DETERMINED BY CONTRACTOR) FOR A TOTAL OF SIXTEEN (16) GREASE CONNECTIONS SAW CUT EX. PIPE TROUGH COVER AND DRILL HOLE FOR VALVE STEM EXTENSION INSTALL NEW VALVE STEM ASSEMBLY INSTALL VALVE STEM GUIDE-SHORT 3 1 2 C2.01 3 C2.01 SCALE: 1/4" = 1'-0" INLET PIPING SECTION 2 SCALE: 1/4" = 1'-0" INLET PIPING SECTION 3 3B 3B 1" 1" 1" 1" 2" 2" 2" 2" DRY TAP EX. 4" NON-POTABLE WATER MAIN WITH NEW 2" NON-POTABLE WATER MAIN WITH A 2" BALL VALVE AL CARBON CS F NPW NaMn04 AL PROPOSED CHEMICAL FEED PIPING SHOWN IN COLOR PLAN SHEET C2.01 LOCATION 1st FLOOR BUILDING FLOOR PLAN Do Not Use Plan Previews for Take Off

RkJQdWJsaXNoZXIy NjAyODM2