Midwestern Engineers, Inc. Plan Preview
MAINREFERENCEPOINT 1'-2" 60' 1'-2" 1'-2" P.O. Box 295 Loogootee, Indiana 47553 Midwestern Engineers, Inc. 802 West Broadway Street Quality Engineering Services Since 1959 802 West Broadway St., P.O. Box 295 Loogootee, IN 47553 Ph: 812-295-2800 6809 Corporate Drive, Indianapolis, IN 46278 Ph: 317-334-0262 Website: midwesterneng.com Email: meinc@midwesterneng.com Fax: 812-295-2801 Consultants Civil Mechanical Electrical Inc. Engineers, Midwestern 2019 BID SET Author: CMOODY, Plot Date: 10/4/2019 7:50 AM Path: Z:\CAD_INCOMPLETE\2018022-00_CITY OF HUNTINGBURG_WS_DISTRIBUTION SYSTEM IMPROVEMENTS AND PLANT UPGRADES\025_PRODUCTIONDWG_DIV 2\ELECTRICAL SITE PLANS.DWG WATER SYSTEM IMPROVEMENTS DIV. II - WATER TREATMENT PLANT IMPROVEMENTS FOR THE CITY OF HUNTINGBURG DUBOIS COUNTY, INDIANA STATE OF No. PE11100002 A L A N F . B U R C H P R O F E S S I O N A L E N G I N E E R R E G I S T E R E D I N D I A N A E.02 39476 ENLARGED WTP ELECTRICAL SITE PLAN SCALE: 1" = 20' SLUDGE BLOW DOWN VALVE VAULT 8" DUFF WATER 14" PLRWSD 8" PVC SANITARY SEWER 8" WATER 12" PVC STORM SEWER 8" PVC 6" DRAIN PIPE AMMONIA TANK 8" PVC 12" FINISHED WATER 16" BACKWASH LINE 12" INFLUENT 8" SLUDGE LINE 8" 4" 2" GAS MAIN (3) 12" D.I. PIPES METER 18" INFLUENT 12" PVC 4" STONE S.R. 64 EXISTING WATER TREATMENT PLANT CONCRETE NEW SLUDGE DRYING BEDS EXISTING BLOW DOWN TANK EXISTING BACKWASH TANK M.H. M.H. ELEC. BOX STONE 4" EXISTING ELECTRICAL EQUIPMENT ROOM TO REMAIN, SEE FLOOR PLAN AND ONE LINE DIAGRAM FOR MORE INFORMATION. EXISTING PAD MOUNT TRANSFORMER BY CITY OF HUNTINGBURG TO REMAIN EXISTING UNDERGROUND ELECTRIC SERVICE INTO BUILDING TO REMAIN EXISTING DISCONNECTS TO REMAIN, PROVIDE NEW CONDUIT AND WIRE AS REQUIRED PROPOSED BLOW DOWN TANK PROPOSED BACKWASH TANK EXISTING RAW INTAKE PUMP STATION TO BE DEMOLISHED. REMOVE WIRE, CAP CONDUITS AND ABANDON IN PLACE. ALL EQUIPMENT UNUSED AT COMPLETION OF PROJECT SHALL BE REMOVED. FIELD LOCATE PROPOSED 600A FEEDER AND FIBER LINE w/ OWNER AND ENGINEER DURING CONSTRUCTION (MIN. 18" COVER). RETURN ALL DISTURBED SURFACES TO PRE-CONSTRUCTION CONDITION. THIS WORK SHALL BE ACCOMPLISHED EARLY IN THE CONSTRUCTION SCHEDULE TO ALLOW OTHER CRITICAL PHASES TO BE COMPLETED. NOTE: CONTRACTOR SHALL UTILIZE LONG SWEEP ELBOWS AS STANDARD; QUANTIFY AND SIZE PULL BOXES AS REQUIRED PER NEC. PROPOSED FIBER NETWORK IN 2" SCH. 80 PVC FROM MCP IN OFFICE TO RTU IN H.S. PUMP BUILDING EXISTING SLUDGE/RECYCLE PUMPS TO BE REMOVED AND REPLACED, SEE CIVIL AND ONE LINE DIAGRAMS FOR ADDITIONAL INFORMATION. Do Not Use Plan Previews for Take Off
Made with FlippingBook
RkJQdWJsaXNoZXIy NjAyODM2