THREE (3) EXISTING 30A-3P DISCONNECTS TO REMAIN, PROVIDE NEW CONDUIT AND WIRE AS REQUIRED TO CONNECT PROPOSED PUMPS. REFER TO CIVIL PLANS FOR METER REPLACEMENT, PROVIDE POWER AND CONTROL IN CONDUIT PER NEC AND MANUFACTURERS INSTALLATION RECOMMENDATIONS PROPOSED JUNCTION BOX, SEE DETAIL THIS SHEET MOUNT NEW REMOTE TOTALIZERS TO EXISTING RACK (TYP, OF 2) POWER TO STARTER (TYP. OF 3) POWER TO LOAD VIA JUNCTION BOX (TYP. OF 3) JUNCTION BOX DETAIL NOT TO SCALE, FIELD VERIFY LOCATIONS w/ OWNER PRIOR TO INSTALLATION VENTED ALUMINUM WIRE MESH CABLE GUARD w/ HINGED ACCESS INSTALL CABLE GRIPS TO SUPPORT CABLE OUT OF PULL BOX WET WELL POWER DISTRIBUTION BLOCKS MOUNTED TO BACKPANEL INSIDE JUNCTION BOX HINGED COVER SIZED BY CONTRACTOR CORE DRILL ENTRY TO WETWELL AS REQUIRED, SEPARATE POWER AND CONTROL GENERAL NOTES - METER UPGRADES AT BLOW DOWN/BACKWASH TANKS TWO (2) EXISTING RECYCLE PUMP FLOW METERS TO BE REPLACED WITH NEW; (1) SUPERNATE FLOW METER & (1) SLUDGE WASTE FLOW METER. PROPOSED MAG METERS REQUIRE REMOTELY MOUNTED TOTALIZERS. TOTALIZERS CAN BE MOUNTED TO UNISTRUT STAND ADJACENT TO EXISTING DISCONNECTS, ALL POWER AND CONTROL SHALL BE INSTALLED IN SEPARATE CONDUITS. THE CONTRACTOR IS ALLOWED TO UTILIZE EXISTING CONDUIT AS MUCH AS PRACTICAL, PROVIDING NEW AS REQUIRED. PROVIDE 120V-1Ø POWER TO EACH NEW TOTALIZER. PROVIDE WIRING TO MCP FOR INSTANTANEOUS AND TOTALIZED FLOW PER SCADA I/O LIST. SEPARATE POWER AND CONTROL; DIGITAL AND ANALOG. 1. 2. 3. 4. MECHANICAL CLARIFIER BLOW-DOWN / BACKWASH TANK SECTION SCALE: 3/16" = 1'-0" E.07 59 39471 P.O. Box 295 Loogootee, Indiana 47553 Midwestern Engineers, Inc. 802 West Broadway Street Quality Engineering Services Since 1959 802 West Broadway St., P.O. Box 295 Loogootee, IN 47553 Ph: 812-295-2800 6809 Corporate Drive, Indianapolis, IN 46278 Ph: 317-334-0262 Website: midwesterneng.com Email: meinc@midwesterneng.com Fax: 812-295-2801 Consultants Civil Mechanical Electrical Inc. Engineers, Midwestern 2019 BID SET Author: CMOODY, Plot Date: 10/4/2019 7:46 AM Path: Z:\CAD_INCOMPLETE\2018022-00_CITY OF HUNTINGBURG_WS_DISTRIBUTION SYSTEM IMPROVEMENTS AND PLANT UPGRADES\025_PRODUCTIONDWG_DIV 2\BACKWASH TANK ELEC.DWG WATER SYSTEM IMPROVEMENTS DIV. II - WATER TREATMENT PLANT IMPROVEMENTS FOR THE CITY OF HUNTINGBURG DUBOIS COUNTY, INDIANA STATE OF No. PE11100002 A L A N F . B U R C H P R O F E S S I O N A L E N G I N E E R R E G I S T E R E D I N D I A N A EXISTING SLUDGE PUMP TO BE REMOVED AND REPLACED EXISTING RECYCLE PUMPS TO BE REMOVED AND REPLACED EXISTING EFFLUENT SUMP SECTION SCALE: 3/16" = 1'-0" PROPOSED EFFLUENT SUMP SECTION SCALE: 3/16" = 1'-0" THREE (3) NEW SLUDGE PUMPS 5HP, 480V-3Ø, 7.6 FLA CONTROL TO SCADA PER I/O LIST CONTROL TO SCADA PER I/O LIST CONTROL TO SCADA PER I/O LIST PROPOSED PUMP CABLING PROVIDED BY PUMP SUPPLIER, INSTALLED BY CONTRACTOR Do Not Use Plan Previews for Take Off
Made with FlippingBook
RkJQdWJsaXNoZXIy NjAyODM2