Midwestern Engineers, Inc. Plan Preview
EX. PAC / LIME ROOM ELEVATOR CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON CARBON FIXT_CODE FU_TOTAL FU_WASTE FU_HOT FU_COLD NPW NPW NPW NPW NPW CARBON NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW FIXT_CODE U_TOTALWASTHCLD FIXT_CODE U_TOTALWASTHCLD STATE OF N 19800122 J O H N W . W E T Z E L P R O F E S S I O N A L E N G I N E E R R E G I S T E R E D I N D I A N A o P.O. Box 295 Loogootee, Indiana 47553 Midwestern Engineers, Inc. 802 West Broadway Street Quality Engineering Services Since 1959 802 West Broadway St., P.O. Box 295 Loogootee, IN 47553 Ph: 812-295-2800 6809 Corporate Drive, Indianapolis, IN 46278 Ph: 317-334-0262 Website: midwesterneng.com Email: meinc@midwesterneng.com Fax: 812-295-2801 Consultants Civil Mechanical Electrical Inc. Engineers, Midwestern 2019 9/18/19 BID SET Author: KGAINES, Plot Date: 10/4/2019 9:27 AM Path: Z:\CAD_INCOMPLETE\2018022-00_CITY OF HUNTINGBURG_WS_DISTRIBUTION SYSTEM IMPROVEMENTS AND PLANT UPGRADES\025_PRODUCTIONDWG_DIV 2\12 - MASTER MECHANICAL PLANS.DWG WATER SYSTEM IMPROVEMENTS DIV. II - WATER TREATMENT PLANT IMPROVEMENTS FOR THE CITY OF HUNTINGBURG DUBOIS COUNTY, INDIANA EXISTING CHEMICAL FEED SYSTEMS FLOOR PLAN DEMOLITION SCALE: 1/2" = 1'-0" CFS.05 46 39484 NOTE: · ALL CHEMICAL FEED LINES, EQUIPMENT, AND OTHER APPURTENANCES SHOWN WITH RED CROSS HATCH TO BE REMOVED AND DISPOSED OF IN ACCORDANCE TO LOCAL, STATE AND FEDERAL REGULATIONS. · THE OWNER HAS RIGHTS TO ALL DEMOLISHED MATERIALS. CONTRACTOR TO COORDINATE SALVAGED ITEMS WITH OWNER PRIOR TO ANY DEMOLITION WORK. SALVAGED ITEMS SHALL BE STORED ON SITE AS DIRECTED BY OWNER. SHAKER BOX TO BE REMOVED CUT BOLTS FLUSH WITH FLOOR AND REPAIR CONCRETE AS NECESSARY REMOVE ALL LIME FEED PIPES AND PATCH OPENINGS IN WALL/FLOOR WHERE NECESSARY LIME FEED SYSTEM CURRENTLY NOT IN SERVICE. REMOVE ALL EQUIPMENT, PIPES AND ASSOCIATED APPURTENANCES OF THE LIME FEED SYSTEM AND REPAIR WALLS/FLOOR AS NECESSARY EX. PAC FEEDER EX. PAC SHAKER/FEEDER CONTROL PANEL EYE WASH (TO REMAIN) LIME MIX TANK EX. LIME FEEDER EX. WATER LINE AND CARBON CHEMICAL FEED LINE TO REMAIN CONTROL PANEL TO BE REMOVED EX. WATER LINE TO REMAIN EX. PAC FEED SYSTEM EX. PAC FEED SYSTEM EX. LIME FEED SYSTEM PVC TROUGHS FOR LIME SLURRY CONVEYANCE EX. LIME FEED SYSTEM EX. LIME FEED CONTROL PANEL TO BE REMOVED EX. PVC TROUGHS FOR LIME SLURRY CONVEYANCE EX. 4" DIA. OPENING WITH ISOLATION VALVE (TYP. OF 4) REMOVE TROUGH SUPPORT STANDS (TYP. BOTH SIDES) CUT & CAP AND REMOVE WATER SUPPLY LINE FOR LIME FEED SYSTEM WATER LINE AND CARBON CHEMICAL FEED LINE TO REMAIN IN PLACE CONTRACTOR TO PATCH AND REPAIR VOIDS IN WALL/ FLOOR WHERE EQUIPMENT AND ASSOCIATED APPURTENANCES HAVE BEEN REMOVED CHEMICAL FEED PIPING LEGEND ALUM CARBON MIXED OXIDANT DISINFECTANT SOLUTION FLUORIDE NON-POTABLE WATER SODIUM PERMANGANATE MISC. CHEMICAL PIPING AL CARBON CS F NPW NaMn04 EX. EYE WASH / CONTROL PANEL REMOVE SHAKER AND STAND EXISTING FEEDER/SLURRY TANK, ETC. TO BE REMOVED EX. EYE WASH TO REMAIN PLAN SHEET CCFS.05 LOCATION 2nd FLOOR BUILDING FLOOR PLAN NOTE: ALL POWER OR CONTROL WIRING ASSOCIATED WITH CHEMICAL FEED SYSTEMS OR EQUIPMENT BEING DEMOLISHED WITHIN THE SCOPE OF THIS PROJECT SHALL BE REMOVED, CONDUITS SHALL BE CAPPED AND MARKED AS "SPARE" THEN ABANDONED IN PLACE ONCE EMPTY. Do Not Use Plan Previews for Take Off
Made with FlippingBook
RkJQdWJsaXNoZXIy NjAyODM2