Project Date: | 11/25/2024 | Date Due: | 12/20/2024 | Company: | St. Anthony Water Utilities, Inc. | Bid Notice: | Notice to Bidders.pdf |
Project Description:
Water Main Relocations Bretzville Area and Intersection Improvements of S.R. 64 and S.R. 162 INDOT Des. No. 2000218
The project consists of approx. 360 feet of 8” water main, 20 feet of 6” water main, 20 feet of 3” water main along with associated appurtenances.
Project Date: | 11/26/2024 | Date Due: | 12/23/2024 | Company: | And-Tro Water Authority | Bid Notice: | Notice to Bidders.pdf |
Project Description:
Water System Improvements Boyd Road and Deer Creek Road Water Main Extensions
The project consists of approx. 17,440 feet of 4” water main, new service meters along with associated appurtenances.
Project Date: | 11/27/2024 | Date Due: | 12/30/2024 | Company: | East Lawrence Water Authority | Bid Notice: | Notice to Bidders.pdf | Awarded To: | VanHoy & Sons Contracting, Inc. |
Project Description:
Water Main Relocations INDOT Des. No. 1701044 & 1701050 Small Structure Replacements on SR 58
The project consists of approx. 1,240 feet of 6” water main along with associated appurtenances.
Project Description:
The project consists of:
Street Improvements.
-
East Oak Street: From IN 161 to Railroad
|
Approx. 2,111 SY of Milling and Resurfacing
|
-
West Cherry Street: From Indiana St. to Central Ave.
|
Approx. 567 SY of Milling and Resurfacing
|
-
West Perigo Avenue: From Central Ave. to Indiana St.
|
Approx. 733 SY of Milling and Resurfacing
|
-
South Church Street: From Oak St. to Third St.
|
Approx 1 900 SY of Milling and Resurfacing
|
-
Third Street from S. Church St. to IN 161
|
Approx 1,057 SY of Milling and Resurfacing
|
-
W. Oak Street from IN 161 to Town Limits
|
Approx 3,095 SY of Milling and Resurfacing
|
-
Second Street From IN 161 to Walnut St.
|
Approx 1,057 SY of Milling and Resurfacing
|
-
Division Street From Third St to Approx. 270 Ft South of Third St.
|
Approx 600 SY of Milling and Resurfacing
|
-
First Street From IN 161 to Walnut St.
|
Approx 1,120 SY of Milling and Resurfacing
|
-
Indiana Street From W. Cherry St. to Perigo Ave.
|
Approx 996 SY of Milling and Resurfacing
|
Project Description:
Scope of Work for INDOT Des. No. 1700170:
-
Install approximately 400 L.F. of 8" PVC SDR-21 and 20 L.F. of 3" PVC SDR-17 water mains with tracer wire.
-
Install approximately 100 L.F. of 18" steel casing with 8" PVC carrier pipe.
-
Remove and dispose of approximately 285 L.F. of 8" A.C./PVC and 120 L.F. of 3" PVC water mains.
-
Dry-tap connections to existing 8" and 3" water mains (2 each), and install related appurtenances, including temporary flush hydrants, gate valves, and markers.
Scope of Work for INDOT Des. No. 1701058
-
Install approximately 315 L.F. of 6" PVC SDR-21 and 40 L.F. of 6" R.J. PVC SDR-21 water mains with tracer wire.
-
Remove and dispose of approximately 345 L.F. of 6" A.C./PVC water main.
-
Dry-tap connections to existing 6" water mains (2 each) and reconnect two meter pits to new service lines.
-
Install related appurtenances, including a fire hydrant, temporary flush hydrants, gate valves, and markers.
Scope of Work for INDOT Des. No. 1702072
-
Install approximately 355 L.F. of 6" PVC SDR-21 and 50 L.F. of 6" R.J. PVC SDR-21 water mains with tracer wire.
-
Remove and dispose of approximately 370 L.F. of 6" A.C./PVC water main.
-
Dry-tap connections to existing 6" water mains (2 each).
-
Relocate one meter pit and service line, and install related appurtenances, including temporary flush hydrants, gate valves, and markers.
Project Description:
The project consists of:
Street Improvements.
-
Seminary Street: From W. Judson St. to Town Limits
|
Approx. 6,400 SY of Milling and Resurfacing
|
-
Mechanic Street: From Seminary St. to John St.
|
Approx. 2,550 SY of Milling and Resurfacing, and Sidewalk Improvements
|
-
Franklin Street: From Spring St. to Mill St.
|
Approx. 6,786 SY of Milling and Resurfacing, and Sidewalk Improvements
|
-
South Cold Springs Road: From Mechanic St. to IN 54
|
Approx. 1,043 SY of Milling and Resurfacing,
|
-
North Cold Springs Road: From IN 54 to Town Limits
|
Approx. 4,053 SY of Milling and Resurfacing
|
Project Description:
The project consists of:
Street Improvements
1. Frazer Street: From Main St. to Green St. Approx. 316 L.F. of Milling and Resurfacing
2. Green Street: From Jefferson St. to State St. Approx. 430 L.F. of Milling and Resurfacing
3. Main Street: From North St. to Town Limits Approx. 650 L.F. of Milling and Resurfacing
Project Description:
The project consists of:
Street Improvements to various streets consisting of cleaning and tie-in milling of existing pavement, clean and liquid tack, surface paving, base patching, full width milling, shoulder stone replacement, pavement markings, patching existing pavement prior to overlay, and cleaning and tack coating existing pavement prior to overlay, and rehabilitation of a portion of Clubhouse Road and Old 245. Streets included are listed below, please refer to Specifications for additional information.
-
Clubhouse Road: From 250 feet west of Old 245 to Town Limits
|
-
Clubhouse Road: From 250 feet west of Old 245 to Old 245
|
-
Old 245: From 1300 feet west of SR 245 to 300 feet north of Clubhouse Road
|
-
Old SR 162: From Town Limits (north) then south to Dead End
|
-
Burch Drive: From SR 162 south to Railroad Tracks
|
-
Hevron Road: From L.J. Koch Boulevard/Mariah Drive to Pro Super Bowl Road
|
-
Sugar Bowl Road: From Orange Bowl Road to Pro Super Bowl Road
|
-
Roosevelt Day Road: From Robert E. Lee Day Road to Ashburn Road
|
-
Pro Super Bowl Road: From Hevron Road to Ashburn Road
|
-
New Years Eve Road: From Hevron Road to Ashburn Road
|
-
Rose Bowl Road: From Pro Super Bowl Road to Orange Bowl Road
|
-
Orange Bowl Road: From Rose Bowl Road to Sugar Bowl Road
|
-
Redbud Drive: From Brown Road to Ashburn Road
|
-
Robert E. Lee Day Road: From Hevron Road to Redbud Drive
|
-
Brown Road: From L.J. Koch Boulevard/Mariah Drive Road to New Years Day Road
|
-
New Years Day Road: From Pro Super Bowl Road to Cul-de-sac
|
-
Inauguration Day Road: From New Years Eve Road to Redbud Drive
|
-
Holiday Boulevard: From SR 162 to SR 245
|
-
CR 1600 N: From SR 162 to Town Limits
|
-
Main Street: From SR 245 to Community Center Entrance
|
-
Cedar Lane: From SR 162 to White Pine Lane
|
-
Red Spruce: From Cedar Lane to Dead End
|
-
White Pine Lane: From Dead End on east side of Cedar Lane to Dead End on west side of Cedar Lane
|
Project Description:
The project consists of:
Street and Sidewalk Improvements
1. Walnut Street: From East Railroad Street to IN-236/Forest Home Street
Approx. 1,260 L.F. of Milling and Resurfacing, HMA Full-Depth Repair, Sidewalk Improvements
2. Meridian Street: From East Washington Street to IN-236/Forest Home Street
Approx. 900 L.F. of Milling and Resurfacing, HMA Full-Depth Repair, Sidewalk Improvements, and Stormwater
Improvements
Project Date: | 01/22/2025 | Date Due: | 02/17/2025 | Company: | French Lick Redevelopment Commission | Bid Notice: | Notice to Bidders.pdf |
Project Description:
Notice is hereby given that the French Lick Redevelopment Commission will receive sealed Bids for the construction of the Oak Alley and Oak Street Roadway and Infrastructure Improvements, the work of which includes but is not limited to; Street Milling, Full Depth Replacement, New Asphalt Surface, New Curb and Gutter, New Sidewalk and Curb Ramps, Storm Drainage Piping and Associated Appurtenances, and Modular Block and Concrete Wall Construction.
Project Description:
The project consists of the following:
Street Improvements and Stormwater Improvements.
-
Ninth Street: From Gough Street to Poplar Street
|
Approx. 3,800 SY of Milling and Resurfacing along with Curb Ramp and Inlet Replacement
|
-
Fourth Street: From Locust Street/SR 62 to Main Street/SR 62
|
Approx. 840 SY of Milling and Resurfacing
|
-
Fourth Street: From Centennial Street to E. Short Street
|
Approx. 3,441 SY of Milling and Resurfacing along with Curb Ramp and Inlet Replacement, and Linear Ditch Grading
|
-
North Street: From Third Street to Fourth Street
|
Approx. 3,328 SY Milling and Resurfacing
|
-
Fourth Street: From Walnut Street to Locust Street/SR 62
|
Approx. 1,060 SY of Milling and Resurfacing along with Sidewalk, Curb Ramp and Retaining Wall Replacement
|
-
Hammond Street: From Third Street to Yankeetown Road
|
Approx. 1,510 SY of Milling and Resurfacing
|
-
Pine Street: From Locust Street/SR 62 to Elm Street
|
Approx. 1,500 SY of Milling and Resurfacing
|
-
Pine Street: From Main Street/SR 62 to Sycamore Street
|
Approx. 1,010 SY of Milling and Resurfacing along with Curb Ramp, Inlet, and Storm Sewer Replacement
|
-
Kiper Avenue: From S. Forrest Avenue to N. Ninth Street
|
Approx. 2,300 SY of Milling and Resurfacing
|
-
Parkview Drive: From Eighth Street to Tower Drive
|
Approx. 4,650 SY of Milling and Resurfacing
|
-
Old Rockport Road: From SR 62 to City Limits
|
Approx 6,220 SY of Milling and Resurfacing
|
-
American Way: From SR 62 to Terminus
|
Approx. 5,650 SY of Surface Scarify and HMA Overlay over PCCP along with Full-Depth Patching and Crack Seal
|
-
Warrick Drive: From Office Park Drive to Terminus
|
Approx. 10,000 SY of Surface Scarify and HMA Overlay over PCCP along with Full-Depth Patching and Crack Seal
|
-
Office Park Drive: From Warrick Drive to Business Park Drive
|
Approx. 2,995 SY of Surface Scarify and HMA Overlay over PCCP along with Full-Depth Patching and Crack Seal
|
-
Business Park Drive: From Eskew Road to Terminus
|
Approx. 1,988 SY of Surface Scarify and HMA Overlay over PCCP along with Full-Depth Patching and Crack Seal
|
-
Benjamin Court: From Quail Crossing Drive to Terminus
|
Approx. 2,425 SY of Subgrade Treatment Type II, HMA Intermediate and HMA Surface Placement along with Stone Shoulders
|
-
Cypress Street: From Cherry Street to Locust Street/SR 62
|
Approx. 1,985 SY of Milling and Resurfacing
|
-
Cypress Street: From Locust Street/SR 62 to Main Street/SR 62
|
Approx. 770 SY of Milling and Resurfacing
|
-
First Avenue: From Walnut Street to Cherry Street
|
Approx. 1,803 SY of Milling and Resurfacing along with Curb Ramp and Inlet Replacement
|
-
Walnut Street: From Cypress Street to Pine Street
|
Approx. 920 SY of Milling and Resurfacing
|
-
Brimm Street: From Parklane Avenue to Terminus
|
Approx. 735 SY of Milling and Resurfacing along with Full Depth Patching
|
-
First Street: From Washington Street to Monroe Street
|
Approx. 5,220 SY of Milling and Resurfacing along with Curb Ramp and Inlet Replacement
|
-
Autumn Drive Approx. 145’ North of Autumn Dr./Convey Dr. Intersection
|
Stormwater Infrastructure Improvements and Full-Depth Patching
|
-
Eighth Street: From Gough Avenue to Taylor Street
|
Approx. 1,085 SY of Milling and Resurfacing along with Curb Ramp and Stormwater Infrastructure and Full Depth Patching
|
|