Bids & Spec Sheets

Project Date:07/03/2024
Date Due:07/23/2024
Company:Town of Dale
Bid Notice:Notice to Bidders.pdf
Awarded To:Sam Estes Painting Inc.
Project Description:

Wastewater System Improvements Div. II – Repainting of the Wastewater Treatment Plant East Clarifier and Misc. Equipment

Division II of the Project consists of:

  • Repainting of the Wastewater Treatment Plant East Clarifier and Misc. Equipment

 

Project Date:07/18/2024
Date Due:08/14/2024
Company:City of Scottsburg
Bid Notice:Notice to Bidders.pdf
Project Description:

Wastewater Improvements Project- Lift Station #19 Rehabilitation & Sanitary Sewer Lining

 

The Project will be constructed in one (1) contract which is defined and outlined as follows:

The contract will consist of Sanitary Sewer Lining, Manhole Rehabilitation and Lift Station Improvements. Lift station improvements to include but not be limited to pumps, controls, and valving.

Project Date:08/20/2024
Date Due:09/10/2024
Company:Town of Dale
Bid Notice:Notice to Bidders.pdf
Awarded To:Love Excavating
Project Description:

The project consists of:

A new restroom facility to be located at the Dale Town Park adjacent to the existing splashpad. The restroom consists of two-unisex restrooms and two-family restrooms and a small storage/mechanical room. The project also includes concrete sidewalk and utility work associated with the building.


 

Project Date:09/04/2024
Date Due:10/02/2024
Company:Eastern Bartholomew Water Corporation
Bid Notice:Notice to Bidders.pdf
Awarded To:Dave O'Mara Contractor, Inc.
Project Description:

Water Distribution System Improvements Low Zone Service Area Reinforcement – Northern Gateway Project

The project consists of:  

  • Installation of approximately 8,500 L.F. of 16” D.I. Class 250 Water Main and Appurtenances by Open-Cut Placement.
  • Installation of approximately 120 L.F. of 16” R.J. D.I. Class 250 Water Main and Appurtenances by Uncased Bore.
  • Installation of approximately 140 L.F. of 8” D.I. Class 350 Water Main and Appurtenances by Open-Cut Placement.
  • Installation of approximately 190 L.F. of 6” D.I. Class 350 Water Main and Appurtenances by Open-Cut Placement.
  • Installation of approximately 210 L.F. of 30”x 0.500” Welded Steel Casing by Auger Boring or Pipe Jacking with 16” D.I. Carrier Pipe and Appurtenances.
  • Dry Tap Connections to Existing 12”, 10”, and 8” Water Mains
  • Installation of 18’-0” x 8’-0” I.D. Pre-Cast or Cast-in-Place Concrete Meter Pit and Appurtenances.
Project Date:09/10/2024
Date Due:10/08/2024
Company:City of Oakland City
Bid Notice:Notice to Bidders.pdf
Project Description:

Polk Drive Extension Road, Water and Sanitary Sewer Improvements

The project consists of additions to the existing Polk Drive including but not limited to:  

  • New Stone Base with HMA Base and Surface Courses.
  • New Water Main and Associated Appurtenances.
  • New Sanitary Service Line and Associated Appurtenances.
Project Description:

Wastewater System Improvements New Hope Lift Station and Force Main and North Drive Lift Station Force Main Replacement

The project consists of:  

  • New Hope Lift Station.
  • New Hope Lift Station 4” Force Main.
  • North Drive Lift Station 6” Force Main Replacement.
Project Date:09/18/2024
Date Due:10/16/2024
Company:City of Crawfordsville
Bid Notice:Notice to Bidders.pdf
Project Description:

Sanitary Sewer System Improvements Project Crawfordsville High School Lift Station and Force Main Improvements

The project consists of:  

  • Installation of approximately 49 L.F. of 8” SDR-35 PVC Sanitary Sewer; 21 L.F. of 10” SDR-35 PVC Sanitary Sewer; 127 L.F. of 18” F-679 PVC Sanitary Sewer.
  • Installation of approximately 846 L.F. of 12” DR-11 HDPE Sanitary Force Main.
  • Installation of approximately 70 L.F. of 30” Welded Steel Casing by Jack and Bore with 18” F-679 PVC Sanitary Sewer Carrier Pipe and Appurtenances.
  • Installation of approximately 86 L.F. of 30” Welded Steel Casing by Jack and Bore with 12” DR-11 HDPE Sanitary Force Main Carrier Pipe and Appurtenances.
  • Installation of Two Pre-cast Sanitary Sewer Manholes
  • Modification of Existing Sanitary Manholes
  • Installation of Proposed Sanitary Lift Station consisting of 10’ Diameter Wet Well, Valve Vault, Metering Pit, Submersible Pumps, Controls, Back-up Power Generator, Valves, Asphalt Access Drive and Appurtenances.
  • Demolition of Existing Pump Station and Appurtenances.