If there is any problem with this site, please contact Matt Clarke by email or by telephone at 812-295-2800. | Bids & Spec Sheets
Project Description: 2023-2 CCMG Street and Storm Sewer Improvements The project consists of: Street, and Storm Sewer Improvements.
Project Description: Water Treatment Plant Filter Media Replacement The project consists of:
Project Description: Water System Improvements Backup Water Supply and Master Meter Pit Connection to Patoka Lake Regional Water and Sewer District, EDA Award No.: 06-01-06464The project consists of:Approx. 6,940 L.F. of 16” & 2,470 L.F. of 12” water main with associated appurtenances. Pit installation and connecting main by Patoka Lake Regional Water and Sewer District. Alternate meter building bid is included.
Project Description: Country Court V Subdivision Road, Storm Drainage, Wastewater Collection, and Water System Improvements The work of which includes but is not limited to the following improvements; additions to existing Country Court Roads Byron Street, and Garrett Avenue, along with the addition of one new road of name to be determined, New Subgrade Treatment, New HMA Base, Intermediate, and Surface Courses, New Storm Drainage Ditches. Detention Basin, Culverts and other Associated Appurtenances, New Gravity Sewer and Force Main/Lift Station and Associated Appurtenances, and New Water Main and Associated Appurtenances.
Project Description: Water Main Replacement From Foundation Way to Indian Creek The project consists of:
Project Description: Water System Improvements Division IA – New Parking Lot The Division IA – New Parking Lot portion of the project consists of:
Project Description: Water System Improvements Division IB – New Composite Tank Site Work The Division IB – New Composite Tank Site Work portion of the project consists of:
Project Description: Repainting of the 100,000 Gallon Elevated Tank No. 2 (Little York) and the 100,000 Gallon Elevated Tank No. 4 (Commiskey) The project consists of:
Project Description: WASTEWATER SYSTEM IMPROVEMENTS DIVISION I - WASTEWATER TREATMENT PLANT IMPROVEMENTS The Project consists of constructing Wastewater Treatment Plant Improvements. Proposed work shall consist of a new headworks building with screening and grit removal, new main plant site lift station, new wet weather filtering system with building, convert equalization tank to a backwash holding tank, new chemical feed systems, renovation of existing clarifiers, new UV disinfection system, solids handling improvements including sludge dewatering and a new drying bed, concrete tankage repair, electrical improvement, SCADA, site work and other associated items.
Project Description: WASTEWATER SYSTEM IMPROVEMENTS DIVISION II - SANITARY SEWER COLLECTION SYSTEM IMPROVEMENTS The Project consists of constructing Sanitary Sewer System Improvements. Proposed work shall consist of the refurbishing of two sanitary lift stations, installation of approximately 1,100 LF of 12-inch sanitary force main, 875 LF of 6-inch sanitary force main, 5,600 LF of 8, 12, 18, 24, and 30-inch gravity sanitary sewer main, sanitary manholes and associated sanitary sewer appurtenances.
Project Description: Park Improvements Church Street Park The work of which includes but is not limited to the following improvements; grading and drainage of the lot, installation of new storm sewer and appurtenances, installation of new sidewalk and curb ramps, installation of new curb, installation of foundation for a new pavilion, installation of the pavilion to be acquired by the City of Loogootee prior to the start of construction, installation of water and sewer service to the site, and installation of a chain link fence and various other appurtenances associated with the project.
Project Description: The project will consists of: The addition of a new two-lane Asphalt Drive, New Concrete Pads for Bulk Waste Container, Scrap Metal Container, and a New Trash Compactor. |
|