Project Date:03/29/2022
Date Due:04/26/2022
Company:Town of Patriot
Bid Notice:Notice to Bidders.pdf
Project Description:

The project consists of:

 Improvements to Lift Stations No. 1

  • Removal of Existing Lift Station
  • Including Removal of Electrical Improvements and Controls
  • Capping of Existing Gravity and Force Main Lines
  • Construction of New Lift Station No. 1, Including Electrical & Controls
  • Construction of New Gravity Sewer and Force Main Sewer

 Improvements to Lift Stations No. 2

  • Removal of Existing Lift Station
  • Including Removal of Electrical and Controls
  • Capping of Existing Gravity and Force Main Lines

Rehabilitation of Existing Lift Stations No. 3

  • Including Fiberglass Wet Well and Valve Pit to remain in place.
  • Replace all interior Equipment & Piping
  • Replace Hatch on Wet Well and Valve Pit

 

Project Date:03/29/2022
Date Due:05/03/2022
Company:City of Boonville
Bid Notice:Notice to Bidders.pdf
Awarded To:PCC Sports
Project Description:

The project consists of:

  • Demolition of existing basketball courts and adjacent asphalt along with the removal of existing chain link fence around Richard’s Pool
  • Site Grading
  • Placement of new pickleball courts as indicated on construction plans
  • Placement of concrete sidewalk as indicated on construction plans
  • Supply and installation of pickleball nets and poles for all 6 courts
  • Supply and installation of 5-coat acrylic surface treatment for all 6 courts along with court markings
  • Supply and installation of fencing and gates consisting of 9 ga black vinyl coated chain link, schedule 40 rails and posts installed in a concrete curb around new pickleball courts and Richard’s Pool.

 

Project Date:04/06/2022
Date Due:05/04/2022
Company:City of Scottsburg
Bid Notice:Notice to Bidders.pdf
Project Description:

The project consists of:

DIV. II – WASTEWATER SEWER REHABILITATION

 

Project Date:04/06/2022
Date Due:05/04/2022
Company:City of Scottsburg
Bid Notice:Notice to Bidders.pdf
Project Description:

The project consists of:

DIV. III – WATER TREATMENT PLANT CLEAR WELL REHABILITATION

Project Date:04/06/2022
Date Due:05/04/2022
Company:City of Scottsburg
Bid Notice:Notice to Bidders.pdf
Project Description:

The project consists of:

DIV. IV – WATER MAIN REPLACEMENT

 

Project Date:04/11/2022
Date Due:05/09/2022
Company:Patoka Lake Regional Water & Sewer District
Bid Notice:Notice to Bidders.pdf
Project Description:

The project consists of:

  • Construction of new sludge drying beds 7, 8, 9 and 10.  Beds 8 thru 10 will be approximately 50’ wide by approximately 100’ long, each.  Bed No. 7 will be approximately 50’ wide by 75’ long.
  • Extension of the influent sludge loading main.
  • Construction of gravity drain lines/manholes from the beds to an existing manhole
  • Extension of the stone access road including culvert and catch basin
  • Modifications to existing sludge drying bed 6

 

Project Date:05/20/2022
Date Due:06/08/2022
Company:City of Scottsburg
Bid Notice:Notice to Bidders.pdf
Project Description:

The project consists of:

DIV. I – WASTEWATER TREATMENT PLANT MAINTENANCE BUILDING

Project Date:05/19/2022
Date Due:06/16/2022
Company:St. Anthony Water Corporation
Bid Notice:Notice to Bidders.pdf
Project Description:

The project consists of:

  • Rehabilitation and repainting of the existing 200,000 Gallon Elevated Water Storage Tank near the Fairgrounds.
  • Complete sandblast and repaint tank interior.
  • Complete pressure wash and repaint tank foundations.
  • Complete pressure wash and overcoat of tank exterior.
  • Miscellaneous repair of tank appurtenances.

 

Project Date:05/19/2022
Date Due:06/21/2022
Company:City of Boonville
Bid Notice:Notice to Bidders.pdf
Project Description:

            The project consists of:

            Street Improvements and Stormwater Improvements on the following streets.

  1. S. Third Street: From Moore Street south 3,268 L.F..

Approx. 3,268 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. W. Elm Street: From S. Cypress Street to S. First Avenue

Approx. 702 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. N. Williams Street: From E. North Street to E. Short Street

Approx. 608 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. E. Columbia Street: From S. Third Street to S. Fourth Street

Approx. 329 L.F. of Milling and Resurfacing

  1. N. Julian Court: From N. Eskew Road to Terminus

Approx. 1,195 L.F. of Milling and Resurfacing

  1. N. Eskew Road: From SR 62 to SR 261

Approx. 1,775 L.F. of Milling and Resurfacing

  1. N. Sixth Street: From E. Chestnut Street to E. Main Street

Approx. 1,255 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. E. Water Street: From N. Eighth Street to Terminus

Approx. 438 L.F. of Milling and Resurfacing

  1. E. Cherry Street: From S. Forrest Avenue to S. Hudspeth Avenue

Approx. 281 L.F. of Milling and Resurfacing

  1. E. Elm Street: From S. Fifth Street to Terminus

Approx. 330 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. N. Fifth Street: From E. Chestnut Street to E. Poplar Street

Approx. 506 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. E. Liberty Street: From N. 3rd Street to N. Fourth Street

Approx. 438 L.F. of Milling and Resurfacing

  1. E. Gum Street: From N. 6th Street to N. Seventh Street

Approx. 446 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. N. Charlton Avenue: From E. Walnut Street north 1,232 L.F.

Approx. 1,232 L.F. of Milling and Resurfacing

  1. W. Walnut Street: From S. Second Street to S. Pine Street

Approx. 1,860 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. S. Washington Street: From N. Yankeetown Road south 2,197 L.F.

Approx. 2,197 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. E. Oakdale Terrace: From E. Main Street to Terminus

Approx. 1,079 L.F. of Milling and Resurfacing

  1. W. Maxville Road: From S. Eighth Street east 700 L.F.

Approx. 700 L.F. of Milling and Resurfacing

  1. N. Ann Street: From E. Short Street to E. North Street

Approx. 592 L.F. of Milling and Resurfacing

  1. E. Short Street: From N. Stevens Street to N. Williams Street

Approx. 445 L.F. of Milling and Resurfacing

  1. E. Walnut Street: From SR 62 to N. Charlton Avenue

Approx. 738 L.F. of Milling and Resurfacing and Stormwater Infrastructure

  1. N. First Street: From E. Main Street to Pioneer Court